| Order | G.O.(Ms) No.61 |
|---|---|
| As listed on the official site | G.O.(Ms)No.61 |
| Department | Water Resources Department |
| Official title | Water Resources Department – Revised Administrative Sanction proposals due to various reasons – Instructions to curtail the Revised Administrative Sanction proposals – Issued. |
| Listed on the official site | 2 June 2026 |
| Date printed on the order | 2 June 2026 |
| Pages | 10 |
| Official PDF | Open the PDF on tn.gov.in |
Text of the order
Read this first. This text was read from the PDF by computer, not typed by a person. Most Government Orders are scanned pages, so names, numbers, amounts and Tamil text can be read wrongly or left out. The official PDF is the authority: check anything you rely on against it.
Show the text (19,024 characters). Read from scanned pages by optical character recognition.
PDF page 1“ OF TF
ey iat O
af fore, Az
>—E Beem 32
a9 -EE
Dif yell
tans
ABSTRACT
Water Resources Department – Revised Administrative Sanction proposals
due to various reasons – Instructions to curtail the Revised Administrative
Sanction proposals – Issued.
Water Resources ($2) Department
G.O.(Ms) No.61 Dated: 02.06.2026
UTTUEY, cnouen&l 19
Slahaicit Email Bpo0r(§ 2057
Read:
1. G.O. (Ms) No.555, Public Works (G2) Department,
dated 17.11.1999.
2. G.O. (Ms) No.146, Public Works (Y2) Department,
dated 12.08.2011.
*oKK
ORDER:
The Water Resources Department of Tamil Nadu plays a pivotal role in
the planning, development, management, and conservation of the
State's water resources. The Department is responsible for the construction,
operation, maintenance, and modernization of irrigation infrastructure,
including dams, canals, tanks, and allied systems, to ensure efficient water
storage and equitable distribution for irrigation and drinking water
requirements. In furtherance of these objectives, the Department is
implementing various schemes relating to water resource development and
management. Administrative Sanction for such works is accorded by the
Government based on the proposals along with estimates received from the
Engineer-in-Chief and Chief Engineer (General), Water Resources
Department and the Chief Engineer, Plan Formulation, Water Resources
Department.
2. In the recent years, several proposals for requesting
Revised Administrative Sanction (RAS) have been received from the
Engineer-in-Chief and Chief Engineer (General), Water Resources
Department due to additional quantity, inclusion of additional items, changes
in design / structures, unforeseen site conditions, public demands and
execution of additional works without obtaining prior approval of the
competent authority, etc., The Government have observed that such
PDF page 2gee
instances result in unavoidable financial burden to the Government and
delay in project execution.
3. The Government have carefully examined the matter with reference
to the provisions contained in the Tamil Nadu Financial Code Volume-I,
Tamil Nadu Public Works Department Code, Tamil Nadu Building Practice,
Tamil Nadu Transparency in Tenders Rules, 2000 and related Government
Orders. Accordingly, the Government issue the instructions appended to this
order to the departmental officials of Water Resources Department for strict
compliance in order to avoid / restrict Revised Administrative Sanction
proposals, in future.
4. Further, the Government have decided to reconstitute the Technical
Advisory Committee which shall discharge its functions as mentioned in the
Terms of Reference appended to this order.
5. The Engineer-in-Chief and Chief Engineer (General), Water
Resources Department is directed to form a Technical Cell for technical
scrutiny. of estimates and to issue necessary instructions to all
Chief Engineers, Superintending Engineers and Executive Engineers under
their administrative control to follow the instructions appended to this order
scrupulously and ensure strict adherence thereto.
(BY ORDER OF THE GOVERNOR)
SATYABRATA SAHOO
PRINCIPAL SECRETARY TO GOVERNMENT
To
The Engineer-in-Chief and Chief Engineer (General),
Water Resources Department, Chennai-5.
All Regional / Functional Chief Engineers.
The Principal Accountant General (A&E), Chennai-18.
The Principal Accountant General (Economic and Revenue Sector Audit),
Chennai-18.
Copy to
The Special Personal Assistant to Hon'ble Minister (Rural Development and
Water Resources), Secretariat, Chennai-9.
The Finance (Infra-II / B.G-II / W&M-I) Department, Secretariat, Chennai-9.
All Officers / Sections, Water Resources Department, Secretariat, Chennai-9.
Stock File / Spare Copy.
// FORWARDED BY ORDER iy aie
i>)
SECTION OFFICER
ve"
Vie
PDF page 3OVS
: Annexure
(G.O.(Ms) No.61, Water Resources (S2) Department, dated 02.06.2026)
Instructions to restrict / avoid Revised Administrative Sanction
proposals in Water Resources Department
1. Design and Detailed Project Report Preparation
e Administrative Sanction (AS) proposals shall be submitted to the
Government only after obtaining approved designs. The Design Circle /
Plan Formulation wing shall ensure comprehensive due diligence at the
design stage itself to preclude the necessity for Revised Administrative
Sanction (RAS).
e Detailed Project Reports (DPRs) shall be comprehensive, with accurate
quantities, realistic cost estimates, and site-specific designs.
e Soil investigations, hydrological studies, and detailed field surveys
shall be completed prior to finalisation of designs.
e Standard Schedule of Rates (SOR) applicable to the relevant financial
year shall be adopted.
e The Plan Formulation wing shall only prepare the Detailed Project
Report for new irrigation infrastructure projects.
e Regional Engineers shall prepare Detailed Project Report
for Rehabilitation / Modernisation / Extension, Renovation and
Modernization (ERM) Projects only.
e As per Para 390 of Tamil Nadu Public Works Department Code, it is
very necessary that the Water Resources Department Officers should
exercise very careful foresight in framing estimates of the cost of
works. It is the duty of the Superintending Engineer and Executive
Engineer in proposing or scrutinising an estimate to consider carefully
the local conditions and the details of the methods by which it is
proposed to carry out the work and to satisfy himself that the estimate
makes adequate provision for all requirements which can be foreseen.
The exercise of special care is necessary in the case of estimates for
productive work since the decision to proceed with them or not most
greatly depend on the estimates cost of carrying them out.
e All the proposals shall be forwarded to Government through
the Engineer-in-Chief and Chief Engineer (General), Water Resources
Department only after scrutiny, advance copy can be sent to
Government.
PDF page 4meh
e Estimates shall undergo multi-level scrutiny thoroughly for Technical
and Financial aspects (Division / Circle / Region / Engineer-in-Chief
and Chief Engineer (General)’s Office).
e The Engineer-in-Chief and Chief Engineer (General), Water Resources
Department shall form a Technical Cell at his office for Technical
scrutiny of estimates which shall comprise 1 Executive Engineer,
2 Assistant Executive Engineers and 4 Assistant Engineers. Besides,
1 Assistant Executive Engineer each from the Design circle and
Plan Formulation wing shall be deputed as and when necessary for
offering Technical advice to the Cell.
2. Proposals involving Tentative Design / Structural alterations
e In cases where Administrative Sanction is accorded on urgency with
tentative / model design, Technical Sanction shall be accorded only
based on approved design. If the approved design necessitates outlay
over and above the Administrative Sanction, Technical Sanction can be
accorded only after obtaining Revised Administrative Sanction from the
Government.
¢ If any important structural alteration is found to be desirable
whilst a work is being constructed, the proposal to make it
should be submitted for fresh administrative sanction
irrespective of increased outlay or not by the authority which gave the
original administrative approval, even when it is not likely to cause
increased outlay. Revised detailed plans and estimates should be
submitted for technical sanction, if the alteration involves any
substantial change in the cost of the work. Any such alteration must
be carried out only after the administrative sanction is approved by the
Government.
3. Land Acquisition
e In respect of projects involving land acquisition, Administrative
Sanction for civil works shall be accorded only after acquisition of
at least 90% of the required land. Such land shall be in a continuous
stretch and in full possession of the Department.
e Agreement for civil works for the entire stretch shall be executed only
if the remaining 10% of land acquisition is ensured to be completed
before achieving 50% physical progress of the work.
e Otherwise, agreement for civil work shall be executed for the Land
Acquisition completed (90%) stretch only. When balance 10% stretch
is acquired and handed over, subsequent agreement may be executed
within the overall Administrative Sanction limit.
PDF page 5eG
e Land Acquisition proposals should indicate the realistic cost as arrived
by the Revenue Department. The exact required land only should be
acquired and completed expeditiously in a time bound manner without
seeking any Revised Administrative Sanction from the Government.
e Average sale price of similar lands to be used for fixing the
compensation / market value as per Section 26 of the Right to Fair
Compensation and Transparency in Land Acquisition, Rehabilitation
and Resettlement Act, 2013.
4. Quantity Variation
e Rule 14(9) of the Tamil Nadu Transparency in Tenders Rules,
2000, stipulates that "the Tender Accepting Authority shall be
ordinarily permitted to vary the quantity finally ordered only to the
extent of twenty-five percent either way of the requirement indicated
in the tender documents."
e No execution of additional quantities beyond the 25% limit
either way prescribed under Rule 14(9) shall be undertaken
without prior approval of the Government, and any deviation shall
be viewed seriously.
5. Additional Quantity / Additional Item of works
e Revisions arising from inspection notes of Chief Engineers /
Superintending Engineers, which result in expenditure exceeding the
administratively sanctioned amount due to additional quantity /
additional item, shall not be acted upon unless prior approval of
the Government is obtained.
e Prior approval of the competent authority / Government shall be
obtained before execution of any additional items or quantities.
e Additional items or deviations shall be permitted only where technically
unavoidable.
e Post-facto ratification proposals shall not be submitted or entertained.
e If any additional items of works are carried out, without the specific
approval of the Government and if any reappraisal report is submitted
to Government for reasons other than the Tender excess if any, GST
revision, escalation in cost due to Standard Schedule of Rates revision,
severe disciplinary action shall be initiated against the officers
responsible for such additional financial commitment to Government.
e Execution shall commence only after approval and not in anticipation
thereof.
PDF page 6Z6i~
e The instructions issued in G.O.(Ms) No.555, Public Works (G2)
Department, dated 17.11.1999 and G.O.(Ms) No.146, Public Works
(Y2) Department, dated 12.08.2011 shall be followed in respect of
additional quantities / additional items.
e The Government in G.O.(Ms) No.146, Public Works (Y2) Department,
dated 12.08.2011, have ordered among others, constituting a
Technical Advisory Committee to recommend the _ Revised
Administrative Sanction proposals relating to Water Resources
Department. In order to streamline the additional quantities /
additional items / Revised Administrative Sanction proposals arising
out of various factors effectively, the Government reconstitute the
above Technical Advisory Committee with the following composition: –
1. |Engineer-in-Chief and Chief Engineer] Chairman
(General), Water Resources
Department.
2. |Chief Engineer, Water Resources Member
Department, Design Research and
Construction Support.
Department, Plan Formulation.
, 4. |Chief Engineer, Water Resources Member
Department, Institute for Water
Studies, Hydrology and Quality Control.
5. |Chief Engineer, Water Resources Member
Department, Operation and ;
Maintenance.
Chief Engineer, Water Resources Member
Department, State’ Dam Safety
Organisation.
Resources Department, Design circle.
Bo ee
Resources Department. Secretar
Terms of Reference of the Technical Advisory Committee
i. To scrutinize the Revised Administrative Sanction proposals
placed before it in respect of all Technical and Financial aspects
involved therein including the correctness of the quantity of each
additional quantities, additional items proposed and its necessity
PDF page 7oo Gf
and recommend the Revised Administrative Sanction proposal to
place before the Tender Award Committee.
ii. To analyse the Revised Administrative Sanction proposals in
detail due to design changes if any and ascertain the proposals
seeking the Administrative Sanction was prepared based on
detailed site investigation, soil test, proper preparation of
estimate and establish that the Revised Administrative Sanction
proposal deserves sanction by the Government.
iii. For each work, prepare a detailed justification note based on the
proposals placed before it by the Chief Engineer concerned.
iv. Examine / Analyse the proposals with respect to the codal
provisions, Tamil Nadu Transparency in Tenders Rules, 2000,
Instructions / Guidelines issued by the Government in various
orders.
v. Undertake field inspection to study the variations proposed by
the Chief Engineer concerned, if found necessary.
vi. To clearly bring out why such changes were not anticipated at
the estimate stage, and the financial implications vis-a-vis
delegated Administrative Sanction powers.
vii. If any savings in the original estimate is proposed by the Chief
Engineer concerned executing the work towards the additional
quantity / additional item, the Committee shall analyse the
grounds for inclusion of such savings item in the original
estimate and establish that such provisions have been made
inadvertently.
6. Savings in Estimate
e As envisaged in Para 182 of Tamil Nadu Public Works
Department Code, “The sanctions to an estimate must on all
“occasions be looked upon as strictly limited to the precise
objects for which the estimate was intended to provide.
Accordingly any anticipated or actual savings on a sanctioned
estimate for a definite work should not, without special
authority, be applied to carryout additional work not
contemplated in the original project or fairly contingent on its
actual execution.
Savings due to the abandonment of a substantial sections
of any project sanctioned by any authority are not to be
considered as available for work on other sections without the
further sanction of that authority.”
PDF page 8OT
e Savings due to non-execution of certain quantities / items of
works are also governed by the Rule 14(9) of the Tamil Nadu
Transparency in Tenders Rules, 2000.
7. Lump Sum provisions
i. No Lump Sum provision shall be made in the estimates for
subsidiary civil works contingent to the main civil work. Detailed
estimate shall include subsidiary civil work also.
ii. All Lump Sum _ provisions included in estimates shall be
supported by realistic cost estimates obtained from the
concerned line departments / agencies (Eg. Shifting of Utilities
etc.,)
iii. Advertisement charges shall be based on the Rules under
Tamil Nadu Transparency in Tenders Rules, 2000 and the orders –
issued by the Government in Finance Department from time to
time, in this regard. ;
iv. In the estimates for major works, provision upto
2.5 percent of the estimated cost of the works portion may
ordinarily be made for ‘unforeseen works and petty supervision
and contingencies'. When found necessary, this provision for
unforeseen works only may be utilised for new items of works
which are required by the administrative authority viz.,
Government and which are essential for the fulfilment of the
precise object for which the estimate for the main works is
intended.
v. In order to avoid Revised Administrative Sanction proposals,
provision for escalation can be included in the original estimate
itself at the rate of 5 percent of cost of works for every 1 year of
the duration of contract towards price adjustment for the eligible
works as ordered in G.O. (Ms.) No.101, Public Works (G2)
Department, dated 10.06.2009. This provision shall be utilized
for this specific purpose only and shall not be diverted for any
other work or component.
vi. Provision for Labour Welfare Fund at 1 percent shall be based on
the cost of civil work only.
8. Contract documents and conditions
e In many Revised Administrative Sanction proposals, the
increased cost arises due to provisions for dewatering through
pumping, cofferdam arrangements, approach road _ etc.,
The Engineer-in-Chief and Chief Engineer (General), Water
Resources Department shall analyse these provisions with
PDF page 9ros 0) tos
respect to the Tamil Nadu Building Practice and other circulars
issued in this regard and submit a report to the Government as
to whether the above items of works are binding on the
contractor and whose quoted rates are inclusive of these
provisions or to be paid for separately.
e The Engineer-in-Chief and Chief Engineer (General), Water
Resources Department shall issue circular to the department
officials on standard general conditions and certain special
conditions other than those specifically required for particular
work for the sake of uniformity in contract documents and also
for avoiding cost escalation due to inadequate / ambiguity in
conditions resulting in Revised Administrative Sanction /
Arbitration cost.
9. Revised Administrative Sanction proposals
All Revised Administrative Sanction proposals shall mandatorily include
a comparative statement indicating the following. Proposals not containing
these details shall not be processed.
a. original Administrative Sanction amount,
b. revised cost,
c. absolute and percentage increase,
d. authority whose delegated powers were exceeded, and
e. stage at which deviation occurred.
f. To be compared with the estimate sent to Government for
according Administrative Sanction.
10. Disciplinary Action
Any contravention of the above instructions, including execution of
additional quantities or items without prior approval of the competent
authority / Government, shall attract appropriate disciplinary action against
the officials concerned.
11. General
e Utility shifting, environmental / forest clearances, encroachments, and
litigation risks shall be identified and addressed prior to tendering.
e Necessary approvals and clearances shall be initiated well in advance.
e Site shall be free from hindrances before handing over to the
contractor.
e Drawings, instructions, and inputs shall be issued in a timely manner.
PDF page 10REO
e Periodic reviews shall be conducted at Division / Circle / Regional
levels to complete the works in time bound manner without time and
cost overrun.
e The detailed investigation on the site and a standard and exhaustive
check list covering all aspects of investigation to be prepared as per
the Para 100 of Tamil Nadu Public Works Department Code shall be
scrupulously followed.
e The various points to be dealt with particularly in the reports as
elaborated in Para 390 of Tamil Nadu Public Works Department Code
under preparation of projects-irrigation .works shall also be
scrupulously followed.
SATYABRATA SAHOO
PRINCIPAL SECRETARY TO GOVERNMENT