| Order | G.O.(Ms) No.114 |
|---|---|
| Department | Rural Development and Panchayat Raj Department |
| Official title | Rural Development and Panchayat Raj Department – Viksit Bharat-Guarantee for Rozgar and Ajeevika Mission – Gramin: (VB-G RAM G) Act, 2025 – Implementation of Viksit Bharat – Guarantee for Rozgar and Ajeevika Mission(Gramin) Scheme, Tamil Nadu – வளர்ச்சியடைந்த பாரதம் – கிராம வேலை உறுதி மற்றும் வாழ்வாதார திட்டம், தமிழ்நாடு with effect from 01.07.2026 – Scheme Notification – Orders – Issued |
| Listed on the official site | 29 June 2026 |
| Date printed on the order | 29 June 2026 |
| Pages | 39 |
| Official PDF | Open the PDF on tn.gov.in |
Text of the order
Read this first. This text was read from the PDF by computer, not typed by a person. Most Government Orders are scanned pages, so names, numbers, amounts and Tamil text can be read wrongly or left out. The official PDF is the authority: check anything you rely on against it.
Show the text (69,441 characters). Read from scanned pages by optical character recognition.
PDF page 1OF F
Sy :
oe page, 3%)
| EA 5
NSS
ABSTRACT
Rural Development and Panchayat Raj Department -_ Viksit
Bharat-Guarantee for Rozgar and Ajeevika Mission =
Gramin: (VB-G RAM G) Act, 2025 – Implementation of Viksit
Bharat – Guarantee for Rozgar and Ajeevika Mission(Gramin)
Scheme, Tamil Nadu – aerntéAwen_ bs umd — Som Caron 2_ m5}
bbpibd ambeansm Hi 1b, siHtpenG@ with effect from 01.07.2026 –
Scheme Notification – Orders – Issued.
RURAL DEVELOPMENT AND PANCHAYAT RAJ (CGS.1) DEPARTMENT
G.O(Ms) No.114 Dated : 29.06.2026.
LITTUEY, 2bheo! 15
AlGadromnart Qc} 2057
Read :
1. The Viksit Bharat-Guarantee for Rozgar and Ajeevika
Mission – Gramin: (VB-G RAM G) Act, 2025 notified in
the Gazette of India, No.60, dated 21.12.2025.
2. The Gazette of India No.2291, dated 11.05.2026 for the
Commencement of VB-G RAM (G) Act, 2025.
3. The Gazette of India No.2292, dated 11.05.2026 for the
Repeal of MGNREG Act, 2005.
4. The Commissioner of Rural Development and Panchayat
Raj, Chennai-15 letter No.89601/MGNREGS 1-2/2025,
dated 31.05.2026.
ORDER:-
In exercise of the powers conferred by sub-section (1) of section 3 of
the Viksit Bharat-Guarantee for Rozgar and Ajeevika Mission – Gramin:
(VB-G RAM G) Act, 2025, an act enacted by Parliament, repealing the
Mahatma Gandhi National Rural Employment Guarantee Scheme
(MGNREGS) Act 2005 from 01.07.2026. Accordingly, the Viksit
Bharat – Guarantee for Rozgar and Ajeevika Mission –
(Gramin) [VB-G RAM G] Scheme, Tamil Nadu – aon é Aico ibs
umg5ib — Slimo Carsnov 2 py) womb ambangsm Fi_ttb, si5tppr@ shall
be implemented in Tamil Nadu with effect from 01.07.2026. |
2. The Appended Notification will be published in an Extraordinary |
issue of the Tamil Nadu Government Gazette, dated 29.06.2026.
. ww
PDF page 22 ,
3. The Works Manager, Government Central Press, Chennai-79 is
requested to publish the appended Notification in the Tamil Nadu
Government Gazette and also to send to the Government as well as to the
Commissioner of Rural Development and Panchayat Raj, Chennai-600 015
each twenty copies of the Gazette for record purpose.
4. The Director, Tamil Development and Information (Translation)
Department, Chennai-600 009 is requested to supply Tamil translation of
the Notification to the Works Manager, Government Central Press,
Chennai-600 001 directly.
(BY ORDER OF THE GOVERNOR)
PRASHANT M WADNERE
SECRETARY TO GOVERNMENT
To
The Works Manager, Government Central Press, Chennai-79.
(for publication of Notification in the Extra-ordinary issue of the Tamil
Nadu Government Gazette, dated 06.2026 and to furnish 500 copies to
the Rural Development and Panchayat Raj, Chennai-9)
The Commissioner of Rural Development and Panchayat Raj, Chennai-15.
The Director, Tamil Development and Information (Translation)
Department, Chennai-600 009.
The Director, Stationery and Printing, Chennai-2.
All District Collectors (except Chennai)
(through the Commissioner of Rural Development and Panchayat Raj,
Chennai – 15)
All Project Directors, District Rural Development Agencies,
(through the Commissioner of Rural Development and Panchayat Raj,
Chennai – 15)
The Director of Information and Public Relations, Chennai-9.
The Accountant General, Chennai-6/18/35.
The Director of Treasuries and Accounts, Chennai-15.
Copy to:
The Secretary to Government of India,
Ministry of Rural Development, Kartvya Bhavan-3,
New Delhi – 110001.
The Hon’ble Chief Minister’s Office, Secretariat, Chennai-9.
The Special Personal Assistant to Hon’ble Minister (Rural Development &
Water Resources), Chennai-9.
The Senior Private Secretary to Secretary to Government, Rural
Development and Panchayat Raj Department, Chennai-9.
The Legislative Assembly Secretariat, Chennai-9.
The National Informatics Centre, Chennai – 9.
Stock File/ Spare Copy.
//FORWARDED BY ORDER// ake VE
eral
SECTION OFFICER
AN
PDF page 33
APPENDIX
NOTIFICATION
G.O.(Ms) No.114, Rural Development and Panchayat Raj (CGS.1)
Department, dated 29.06.2026
Viksit Bharat—Guarantee for Rozgar and Ajeevika
, Mission (Gramin) (VB-G RAM G) Scheme, Tamil Nadu
aotéstAwco_hs umgib — Eljmo Carmo 2_pi5] whpwb ampangm
$i_Lwb, sdiponG.
In exercise of the powers conferred by sub-section (1) of section 3 of
the Viksit Bharat—Guarantee for Rozgar and Ajeevika Mission (Gramin):VB-G
RAM G Act, 2025, the Government of Tamil Nadu hereby notifies the
following Scheme, namely:-
Viksit Bharat—Guarantee for Rozgar and Ajeevika
Mission (Gramin) (VB-G RAM G) Scheme, Tamil Nadu –
aonsFFlwon_bs uMgZib — S&lomo Caron 2m) whmib ambemgnr
Sib, slpeng.
This Scheme shall apply to all the Village Panchayats in Tamilnadu
CHAPTER I—SHORT TITLE, COMMENCEMENT AND DEFINITIONS
1. Short title and commencement
1. This Scheme may be called the Viksit Bharat—Guarantee for Rozgar
and Ajeevika Mission (Gramin) (VB-G RAM G) Scheme, Tamil Nadu
and in Tamil as aomtéAwooLs unTsib — Slpmo Caron 2_ mH) wibmib
ampamgm Sit, sulpHnG.
2. It shall come into force on such date as may be notified by the
Government of Tamil Nadu.
2. Definitions
Unless the context otherwise requires, all terms used herein shall have the
meanings assigned to them in Section 2 of the Act;
a. “Act” means “Viksit Bharat—Guarantee for Rozgar and Ajeevika Mission
(Gramin):VB-G RAM G Act, 2025”;
PDF page 44
b. “Adult” means a person who has completed the eighteen years of age;
c. “Applicant” means the head of a household or any of its other adult
members .
who has applied for employment under the Scheme;
d. “Block” means a community development area within a district comprising
a group of Village Panchayats;
e. “Centrally Sponsored Scheme” means a scheme in which the Central
Government provides full or partial financial assistance and the
Government of Tamil Nadu under take its implementation;
f. “District Programme Coordinator” for the implementation of the Scheme in
a district means the District Collector;
g. “Government” means the Government of Tamil Nadu, unless specified
otherwise;
h. “Household” means the members of a family related to each other by
blood, marriage or adoption and normally residing together and sharing
meals or holding a common ration card;
i. “Implementing Agency” includes various Departments of Government of
Tamil Nadu, Village Panchayats, Block Panchayats, District Panchayats or
any local authority or the Government undertaking, to undertake the
implementation of any work taken up under the Scheme;
j. “Intermediate Level” means Block Panchayats;
k. “National Level Steering Committee” means a_ steering committee
constituted by the Central Government as per the Act;
|. “Normative Allocation” means the allocation of the fund made by the
Central Government to the State;
m. “Notification” means a notification published in the Official Gazette and the
term “notify” or “notified”, shall be construed accordingly;
n. “Peak Agricultural Season” means a period, not exceeding 60 days in a
financial year, as may be notified by the State Government during which
no works shall be commenced or executed under this scheme;
o. “Programme Officer” means Block Development Officer (Village
Panchayat) ;
p. “Rural Area” means any area in Tamil Nadu except those areas covered by
any urban local body or a Cantonment Board established or constituted
under any law for the time being in force;
q. “Schedule” means Schedules appended to the Act;
PDF page 5E 5
r. “Scheme” means the Scheme notified by the Government of Tamil Nadu
under sub-section (1) of section 3 of the Act, 2025;
s. “State ” means State of Tamil Nadu;
t. “State Council” means the Tamil Nadu State Rural Employment Guarantee
Council;
u. “State Level Steering Committee” means Steering Committee of Tamil
Nadu constituted to provide operational guidance, coordination and
monitor the implementation of the Scheme;
v. “Unskilled Manual Work” means any physical work which any adult person
is capable of doing without any skill or special training;
w. “Viksit Bharat National Rural Infrastructure Stack” means the consolidated
aggregation comprising proposed works emerging from the Village
Panchayat Development Plans aggregated at the District and State levels,
and aligned with the four thematic domains of works Viz., Water Related
Works for Water Security, Core Rural Infrastructure, Livelihood-Related
Infrastructure, Special Works to Mitigate Extreme Weather Events and
Disaster Preparedness;
x. “Village Panchayat Development Plan” means a future-ready,
convergence- based local development plan, formulated by the Village
Panchayat through a participatory and evidence-based process, and
serving as the basis for identification and prioritisation of works under the
Act;
y. “Wage Rate” means the wage rate as may be notified by the central
government for the purposes of the Act;
z. “Work” means any work under taken or executed under the Scheme;
CHAPTER II —OBJECTIVES AND GUIDING PRINCIPLES
3. Objectives
a. The primary objective of this Scheme is providing an enhanced
statutory wage- employment guarantee of one hundred and twenty-
five days in each financial year to such rural households whose adult
members volunteer to undertake unskilled manual work, thereby
enabling them to participate more effectively in the expanded
livelihood security framework.
PDF page 66
b. To focus on empowerment, growth, convergence and saturation
through public works aggregating into forming Viksit Bharat National
Rural Infrastructure Stack, with a thematic focus on water security
through water-related works, core rural infrastructure, livelihood-related
infrastructure and special works to mitigate extreme weather events.
c. To facilitate adequate farm-labour availability during peak
agricultural seasons, and in view of the wage-employment guarantee
for the rural workforce.
d. To institutionalize convergence, saturation-driven planning and whole
of government delivery through Village Panchayat Development
Plans, integrated with the PM Gati Shakti to address the varying
needs of Village Panchayats, powered by geospatial systems, digital
public infrastructure, district and State planning mechanisms, with
such plans aggregated at the Block, District, State and National!
levels.
e. To modernize governance, accountability and citizen engagement
through a comprehensive digital ecosystem, including biometric
authentication at various levels, global positioning system or mobile
based worksite monitoring, real time management information
system dashboards, proactive public disclosures and the use of
Artificial Intelligence for planning, audits and fraud risk mitigation.
CHAPTER – III~GUARANTEES, TIME LIMITS AND CONDITIONS
4. Guarantee
a. The Government will provide not less than one hundred and
twenty-five days of guaranteed employment in a financial year in
accordance with the Scheme to every household whose adult
members volunteer to do unskilled manual work.
b. Every person who has done the work given to him under the Scheme
shall be entitled to receive wages at the wage rate for each day of
work.
c. The disbursement of daily wages shall be made on a weekly basis or in
any case not later than a fortnight after the date on which such work
: was done.
d. If an applicant for employment under the Scheme is not provided
such employment within fifteen days of receipt of his/her
PDF page 7J 7
application seeking employment or from the date on which the
employment has been sought in the case of an advance application,
whichever is later, he/she shall be entitled to a daily unemployment
allowance in accordance with the provision of this section.
e. In case the payment of wages is not made within fifteen days from
the date of closure of the muster roll, the wage seekers shall be
entitled to receive payment of compensation for the delay, at the rate
of 0.05% of the unpaid wages per day of delay beyond the
sixteenth day of closure of muster roll.
5. Conditions for demand
1) Every adult member of a registered household whose name appears in
the Rural Employment Guarantee Card, shall be entitled to apply for
unskilled manual work under the Scheme; and every such application
shall be compulsorily registered, and a receipt issued with the date,
which shall be entered in the given digital platform.
2) The District Administration shall proactively verify the requirements of
the Vulnerable Groups and provide them with work.
3) Application for work may be oral or written and made to the Village
Panchayat or to the Block Development Officer (VP) or through any
other means authorized by the Government of Tamil Nadu.
4) Applications for work may be filed individually or for a group together.
CHAPTER – IV—PLANNING FRAMEWORK
6. Village Panchayat Development Plan (VPDP)
(1) A future-ready, convergence based local development pian
formulated by the Village Panchayat through a participatory and
evidence-based process, and serving as the basis for identification
and prioritization of works under this Scheme.
(2) There shall be a systematic and participatory planning exercise
under taken at each tier of the Panchayat Raj system in
accordance with the specified methodology.
PDF page 88
(3) The Village Panchayat Development Plans shall be prepared by the
Village Panchayats using GIS-based tools, PM Gati Shakti layers
and other digital public infrastructure, and placed before the Gram
Sabha for approval.
(4) Works proposed to be undertaken by the Block Panchayat or other
implementing agencies shall be placed before the respective Gram
Sabha of the Village Panchayats along with the expected outputs
and outcomes.
(5) The Village Panchayat Development Plans shall be aggregated at
the Block, District and State levels to ensure coherence with
sectoral priorities, broader rural development strategies, and
saturation-based planning for comprehensive coverage of eligible
assets and outcomes across all Village Panchayats.
(6) Every Village Panchayat shall prepare saturation-mode plans based
on its classification into Category A, B, C, etc., determined based
on development parameters, including proximity to urban areas, to
address the varying needs of the Panchayats. All such works shail
be drawn exclusively from the approved Village Panchayat
Development Plan.
(7) Annual plans would be prepared on the basis of the normative
allocation.
(8) The works identified in the Village Panchayat Development Plans
shall be executed in convergence with various Central, State and
local schemes as may be notified by the Central Government.
(9) While preparing Village Panchayat Development Plans and annual
labour demand, no work shall be proposed or undertaken for
execution during notified peak agricultural season.
7. Frame work for Convergence and Integrated Planning—A Unified
Convergence Frame work shall be established for coherent planning,
execution and monitoring of all works undertaken in rural areas, and
for this purpose—
(1) All Central, State or local schemes, as may be notified by the
Central Government for the purpose of convergence and
saturation-based planning, shall be brought under a_ unified
PDF page 99
planning process anchored in the Village Panchayat Development
Plans.
(2) All existing assets and proposed works, whether funded under this
Scheme or through any other Central, State or local scheme, shall
be mandatorily registered and tracked through the Viksit Bharat—
National Rural Infrastructure Stack using the designated digital
portal.
(3) Single digital backbone for rural public works covering water
security, core rural infrastructure, livelihood-related infrastructure,
and special works to mitigate extreme weather events.
(4) All planning shall follow a strict bottom-up process beginning with
the preparation of the Village Panchayat Development Plan, which
shall be successively aggregated at the Block, District and State
levels, and the aggregated Tamil Nadu State Plan shall be placed
before the State Level Steering Committee for approval. Annual
plans would be prepared on the basis of the normative allocation.
(5) Identification of priority infrastructure gaps, standardization of
work designs and measurable contribution of public investments
to saturation outcomes at the Village Panchayat, Block and District
levels, shall align with the Viksit Bharat National Rural
Infrastructure Stack.
CHAPTER V —STATE INSTITUTIONAL ARCHITECTURE
8. Tamil Nadu Rural Employment Guarantee Council
(1) At the state level, there shall be a State Gramin Rozgar Guarantee
Council, which shall be called the "Tamil Nadu Rural Employment
Guarantee Council". The Council shall have a State-level General
Assembly, which shall consist of the following office bearers/
members:
(i) Minister for Rural Development and Panchayat Raj, Government |
of Tamil Nadu – Chairperson.
(ii) Chief Secretary, Government of Tamil Nadu
(iii) Secretary to Government, Finance Department
(iv) Secretary to Government, Rural Development and Panchayat Raj
Department
(v) Director, Rural Development and Panchayat Raj Department- |
Member Secretary. |
PDF page 1010
(vi) Such non-official members as may be nominated by the
Government of Tamil Nadu, from among the representatives of
. Panchayat Raj Institutions, representatives of non- governmental
organizations and weaker sections of the society.
(2) The terms and conditions of the Chairperson and members and
procedures related to conduct of business shall be as may be
specified by the Government.
(3) The duties and functions of the Tamil Nadu Rural Employment
Guarantee Council:
(i) Advising the Government of Tamil Nadu on all matters
concerning the Scheme and its implementation in Tami! Nadu;
(ii) Reviewing the monitoring and redressal mechanisms from time
to time and recommending improvements;
(ili) Monitoring the implementation of the Scheme and
coordinating such implementation with the Central Council;
(iv) Preparing the annual report to be laid before the State
Legislative Assembly.
(v) Any other duty or function as may be assigned to it by the
Central Council or the Government.
(4) The State Council shall have the power to undertake an evaluation of
the Scheme operating in the State and for that purpose to collect or
cause to be collected statistics pertaining to the rural economy and
the implementation of the Scheme and Programmes in Tamil Nadu.
9, State Level Steering Committee of Tamil Nadu
(1) At the state level, there shall be a State Level Steering Committee,
to provide operational guidance, coordination, and monitor the
implementation of the Scheme.
(2) The State Level Steering Committee shall be presided over by the
Chief Secretary of Tamil Nadu or by an officer not below the rank of
Additional Chief Secretary nominated by the Government of Tamil
Nadu and shall comprise of the following members, namely: —
(i) Secretary to Government, Rural Development and Panchayat
Raj Department
(ii) Director, Rural Development and Panchayat Raj Department-
Member Secretary.
PDF page 11; 11
(iii) Secretary to Government of relevant Departments of the
Government.
(iv) Such number of subject-matter experts, as may be determined
by the Government.
(v) Representatives of technica! or research institutions; and
(vi) One member nominated by the Department of Rural
Development, Ministry of Rural Development, Government of
India.
(3) The State Level Steering Committee shall—
(i) Oversee State wide planning and convergence with other
programmes;
(ii) Review of district performance and ensure timely preparation of
the aggregate State plan;
(iii) Coordinate with the National Level Steering Committee and
implement directions issued therefrom;
(iv) Support digital systems, monitoring arrangements, and process
improvements at the State level; and
(v) Perform such other functions as may be assigned to it by the
Government.
10.Intermediate Panchayats
1, The Panchayat at the district level, shall oversee and coordinate
implementation of the Scheme in the district and the Panchayat
at the block level, shall prepare and finalize the aggregate Block
level plan and perform such other functions as may be assigned
to it by the Government.
2. The Village Panchayat shall register households, receive and process
applications for work, prepare the Village Panchayat Development
Plans, execute the works assigned to it, maintain such records as
may be specified by the Government, and discharge such other
responsibilities as may be entrusted to it under the Scheme.
3. Annual plans would be prepared on the basis of the normative
allocation. |
|
|
PDF page 1212
11. The District Collector
1. The District Collector shall act as the District Programme Coordinator
for the implementation of the Scheme in the district in accordance with
the provisions of this Scheme and the rules made there under.
2. The functions of the the District Collector shall be as follows,
namely:
(i) The District Collector shall be responsible for the consolidation
and finalization of the district aggregate plan and shall
oversee convergence, implementation and monitoring of the
Scheme at the district level;
(ii) The District Collector shall ensure compliance with the
provisions of this Scheme and with the directions and
guidelines issued by the Central Government and the
Government of Tamil Nadu.
(iii) The District Collector shall accord administrative sanctions for
the works to be undertaken under the scheme and give
clearances as may be required for the timely and effective
implementation of the Scheme, including those relating to
digital, geospatial and monitoring systems;
(iv) The District Collector shall coordinate with the Block
Development Officers (VP) and shall review, monitor and
supervise their performance using the monitoring framework,
management information system and accountability
mechanisms.
(v) The District Collector shall conduct periodic inspections of
works undertaken under the Scheme, ensure adherence to
quality and productivity standards, and shall redress the
grievances of applicants through digital public infrastructure
and designated grievance redressal systems issued/notified
by the Central Government.
3. The District Collector shall prepare an aggregate plan for the
district under his jurisdiction by consolidating the approved Village
Panchayat Development Plans and aggregated Block Plans and the
proposals received from the District Panchayats.
PDF page 1313
12. Block Development Officer (Village Panchayats)
1. At block level, Block Development Officer (VP) shall act as the Block
Programme Officer.
2. Block Development Officer (VP) shall be responsible for matching the
demand for employment with the employment opportunities arising
from works in the area under his jurisdiction.
3. Block Development Officer (VP) shall prepare an aggregate plan for
the Block under his jurisdiction by consolidating the approved
Village Panchayat Development Plans.
4. The functions of the Block Development Officer (VP) shall include—
(i) Block Development Officer (VP) shall prioritize and allocate Works
to be implemented through the Village Panchayats from amongst the
works for which District Collector has issued Administrative Sanction;
(ii) Monitoring all works and projects undertaken by the Village
Panchayats and other implementing agencies within the Block,
ensuring alignment with the Village Panchayat Development Plans;
(iit) Sanctioning and Ensuring payment of unemployment allowance to
eligible households in accordance with the provisions of the Act;
(iv) Ensuring prompt and fair payment of wages to all laborers
employed under the Scheme within the Block, including through
digital and biometric authenticated payment systems, as may be
specified by the Central Government;
(v) Ensuring that regular social audits of all works within the
jurisdiction of each Village Panchayat are conducted by the Gram
Sabha, and that timely and appropriate action is taken on
objections and findings arising from such audits;
(vi) Dealing promptly with all complaints and grievances relating to the
implementation of the Scheme within the Block, through the
grievance redress mechanism established; |
(vii) Ensuring the geo-tagging, digital recording, and management
information system reporting of all works undertaken within the
Block, and compliance with monitoring, productivity, and
transparency framework;
PDF page 1414
(viii) Facilitating inter-departmental convergence at the Block level to
support saturation-driven planning and the execution of works under
the Scheme; and
(ix) Any other function as may be assigned to him by the District
Collector and the Government.
5. The Block Development Officer (VP) shall perform his function
under the direction, control and supervision of the District Collector.
13.Responsibilities of Village Panchayat
The Village Panchayat shall be responsible for—
(i) Registration of households and issuance of Rural Employment
Guarantee Card;
(ii) Receiving work applications and maintaining records of Rural
Employment Guarantee Card;
(iii) Preparing the Village Panchayat Development Plans;
(iv) Every Village Panchayat shall, after considering the recommendations
of the Gram Sabha, keeping in view of the demand for works,
prepare a Village Panchayat Development Plan on saturation basis;
(v) Annual plans would be prepared on the basis of the normative
allocation.
(vi) Block Development Officer (VP) shall supply each Village Panchayat
with—
1. The muster rolls for the works sanctioned to be executed by it;
2. A list of employment opportunities available to the residents of
the Village Panchayat;
(vii) The Village Panchayat shall allocate employment opportunities
among the applicants and ask them to report for work;
(viii) The works taken up by a Village Panchayat under the Scheme, shall
meet the required technical standards and measurements;
(ix) A Village Panchayat may take up any work under the Scheme from
Village Panchayat Development Plan within the area of the Village
Panchayat, as may be allocated by the Block Development Officer
(VP).
PDF page 15: 15
14.Social Audit by Gram Sabha
1. The Gram Sabha, shall monitor and review the execution of all works
undertaken under the Scheme within the jurisdiction of the Village
Panchayat, in accordance with the provisions of this Act.
2. The Gram Sabha shall conduct regular social audits of all works
taken up under the Scheme within the Village Panchayat, as
issued/notified by the Central Government.
3. The Village Panchayat shall make available to the Gram Sabha all
records and documents required for conduct of the social audit,
including muster rolls, bills, vouchers, measurement books,
sanction orders, digital records, geo-tagged photographs, and all
other connected books of account and papers, whether maintained
in physical or electronic form.
CHAPTER-VI—REGISTRATION AND RURAL EMPLOYMENT GUARANTEE
CARD
15. Registration of households
1. Household Registration—The adult member of every household
residing in any rural area and willing to undertake unskilled manual
work, may submit the names, ages and address of the household to
the Village Panchayat within whose jurisdiction they reside, for the
purpose of registration of the household and issuance of a Rural
Employment Guarantee Card.
2. A Special Rural Employment Guarantee Card, where the job seeker
is—
(a) A single woman; or
(b) A person with disability; or
(c) Persons above sixty years of age; or
(d) Areleased bonded labourer; or
(e) A person belonging to a Particularly Vulnerable Tribal Group; |
or
(f) A transgender person.
3. The Special Rural Employment Guarantee Card shall ensure special
protection in the providing work, work evaluation, and worksite
facilities, as applicable.
PDF page 1616
16. Issue of Rural Employment Guarantee Card
1. It shall be the duty of the Village Panchayat, after making such
enquiry, as it deems fit, to issue a Rural Employment Guarantee
Card with in fifteen days from the date of receipt of such
application, containing therein a unique Rural Employment
Guarantee Card number with details of the registered adult
members of the household, their photos, Bank or Post office account
number, insurance policy number and the Aadhaar numbers, if any.
2. The Rural Employment Guarantee Card issued, shall be valid for
three years,
3. Every three years the Rural Employment Guarantee Card may be
renewed after due verification.
4. No Rural Employment Guarantee Card shall be cancelled except on
any of the following grounds—
(a) Where it is found to be a duplicate;
(b) Where the entire household has permanently migrated to a place
outside the jurisdiction of the Village Panchayat and no longer
resides in the village; or
(c) Where all adult members of the registered household are deceased.
5. The Government will make arrangements for updating the following
details in the Rural Employment Guarantee Card regularly while
mentioning the key guarantees under the Scheme are clearly listed as
follows: —
(a)Number of days for which work was demanded;
(b)Number of days of work allocated;
(c)Description of the work allocated along with the muster roll
number;
(d)Measurement details;
(e)Unemployment allowance, if any, paid;
(f) date-wise wages paid;
(g)delay compensation paid if any;
(h)asset provided, if any.
PDF page 17; 17
6. Every worker shall have an opportunity of being heard and register
any grievance either orally or in writing, at all implementation levels
for disposal as per the provisions of the Grievance Redressal
Mechanism under the Scheme.
17. Issuance of Rural Employment Guarantee Card in Case of
Dislocation
1. Notwithstanding anything contained in this Schedule, in the event of
any national calamity such as flood, cyclone, tsunami and earthquake
resulting in mass dislocation of rural population, the adult members of
rural households of areas so affected may—
a. Seek for registration and get Rural Employment Guarantee
Card issued by the Village Panchayat or Block Development
Officer (VP) of the area of temporary relocation;
b. Submit written or oral applications for work to the Block
Development Officer (VP) or the Village Panchayat of the area
of temporary relocation; and
c. Apply for re-registration and _ re-issuance of Rural
Employment Guarantee Card in the event of any loss or
destruction.
2. The details of such Rural Employment Guarantee Card shall be
intimated to the District Collector.
3. In the event of restoration of normalcy, the Rural Employment
Guarantee Card so issued shall be re-endorsed at original place of
habitation and clubbed with the original Rural Employment
Guarantee Card on being retrieved.
4.The number of days of employment provided shall be counted while |
computing 125 days of guaranteed employment per household. |
CHAPTER-VII— DEMAND FOR WORK AND ALLOTMENT |
18. Demand for Work
1. Every adult member of a registered household whose name
appears in the Rural Employment Guarantee Card, shall be entitled
to apply for unskilled manual work under the Scheme; and every
PDF page 1818
such application shall be compulsorily registered, and a receipt issued
with the date, which shall be entered in the given digital platform.
2. The District Administration shall proactively verify the requirements
of the Vulnerable Groups and provide them with work.
3. Application for work may be oral or written and made to the Village
Panchayat or to the Block Development Officer (VP) or through any
other means authorized by the Government.
4, Applications for work may be filed individually or for a group
together.
5. There shall be no limit on the number of days of employment for
which a person may apply, or on the number of days of
employment actually provided to him subject to the aggregate
guarantee of the household.
6. Normally, applications for work must be for at least six days of
continuous work.
7. Provision shall be made in the Scheme for advance application,
that is, application which may be submitted earlier than the date
from which employment is sought.
8. Provision shall be made in the Scheme for submission of multiple
applications by the same person provided that the corresponding
periods for which employment is sought do not overlap.
19. Allocation of Work
1. The Village Panchayat and Block Development Officer (VP) shall
ensure that every applicant shall be provided unskilled manual
work in accordance with the provisions of the Scheme Within
fifteen days of receipt of an application or the date from which
he seeks work in case of advance application, whichever is later.
2. Priority shall be given to women in such a way that at least one-
third of the beneficiaries shall be women who have registered and
requested for work. Efforts shall be made to increase participation
of single women and differently able persons.
3. Applicants who are provided with work shall be so intimated in
writing, by means of a letter sent to him at the address given in
the Rural Employment Guarantee Card or through any other
PDF page 1919
effective mode of communication or by a public noticed is played
at the office of the Panchayats at district, block or village level.
4. A list of persons who are provided with the work shall be
displayed on the notice board of the Village Panchayat and at the
office of the Block Development Officer (VP)and at such other
place as the Block Development Officer (VP) may deem
necessary and the list shall be open for inspection by the officials
of the implementing agencies and any interested person.
5. As far as possible, the employment shall be provided within a
‘radius of five kilometers of the village where the applicant
resides at the time of applying.
6. A new work under the Scheme can be commenced if at least ten
labourers become available for work, provided that this condition
shall not be applicable for new works, as determined by the
Government, in hilly areas and in respect of afforestation works.
7. In case the employment is provided outside the radius of five
kilometers, the labourers shall be paid ten percent of the wage rate
as extra wages to meet additional transportation and expenses for
living.
8. A period of employment shall be for at least six days
continuously, with not more than six days in a week.
CHAPTER-VITI—MUSTERROLLS, ATTENDANCE AND MEASUREMENT
20. Muster rolls
1. The muster rolls for works undertaken under this Scheme shall be
maintained through digital systems and shall comply with the following
requirements—
a. Each muster roll shall be in English and Tamil and have a unique
electronically generated identity number (e-muster) issued
through the management information system. The muster roll
shall include the names of all workers who have demanded or
been allocated work and shall be authenticated by the
authorized functionary of the Village Panchayat or the Block
Development Officer (VP). |
|
PDF page 2020
21. Attendance recording
1. Attendance at the worksite shall be recorded daily by an authorised
person using biometric attendance systems, and all attendance
details shall be made available for public viewing on a daily basis
through the designated management information system.
22. Measurement of work
1. Payment of wages shall only be made based on measurements taken
at the worksite by technical personnel within three days of the closure
of the muster roll, and recorded digitally through systems integrated
with the designated management information system.
2. Deployment of adequate technical personnel to enable timely
measurement shall be ensured. Suitable persons may be trained
and deployed, with delegated technical responsibilities, and shall be
paid wages at skilled rates.
CHAPTER-IX—WAGE PAYMENT AND DELAY COMPENSATION
23.Wage payment
1, Wage rate to be paid to the worker will be decided and notified by
the Central Government.
2. The disbursement of daily wages shall be made on a weekly basis or in
any case not later than a fortnight after the date on which such work
was done.
24. Mode of payment
1. The payment of wages shall, unless so exempted by the Central
Government, be made through the individual savings accounts of
the workers in the relevant Banks or Post Offices.
25. Delay compensation
1. In case the payment of wages is not made within fifteen days from
the date of closure of the muster roll, the wage seekers shall be
entitled to receive payment of compensation for the delay, at the
rate of 0.05% of the unpaid wages per day of delay beyond the
sixteenth day of closure of muster roll.
PDF page 2121
2. Any delay in payment of compensation beyond a period of fifteen
days from the date it becomes payable, shall be considered in the
same manner as the delay in payment of wages.
3. For the purpose of ensuring accountability in payment of wages and
to calculate culpability of various function arise or agencies, the
processes leading to determination and payment of wages shall be
divided into various stages such as,—
a. Measurement of work;
b. Computerising the muster rolls;
c. Computerising the measurements;
d. Generation of wage lists; and
e. Uploading Fund Transfer Order (FTOs), and specify stage-wise
maximum time limits along with the functionary or agency which
is responsible for discharging the specific function.
4, The compensation shall be paid upfront after due verification within the
time limits as specified above and the compensation amount shall be
recovered from the functionaries or agencies who are responsible for
the delay in payment.
5. The number of days of delay, the compensation payable and
actually paid shall be reflected in the Management Information
System.
CHAPTER-X—UNEMPLOYMENT ALLOWANCE
26. Eligibility
1, If an applicant for employment under the Scheme is not provided
such employment within fifteen days of receipt of his application
seeking employment or from the date on which the employment
has been sought in the case of an advance application, whichever is
later, he shall be entitled to a daily unemployment allowance as
may be determined by the Government.
2. Such rate shall be at least one-fourth of the notified wage rate for
the first thirty days during the financial year and at least one-half
of the wage rate for the remaining period of the financial year.
PDF page 2222
27. Procedure
1. The Unemployment Allowance payable to the household of an
applicant jointly, shall be sanctioned and disbursed by the Block
Development Officer (VP).
2. Every payment of Unemployment Allowance shail be made or
offered not later than fifteen days from the date on which it became
due for payment.
CHAPTER-XI—CATEGORIES OF WORKS & ELIGIBILITY CRITERIA FOR
INDIVIDUAL BENEFICIARY WORK
28. Works & Categories under the Scheme-
1. Focus of the Scheme—Classification of Works: The Scheme shall focus
on the following categories of works, as identified in the Village
Panchayat Development Plans and aggregated into the Viksit Bharat
National Rural Infrastructure Stack.
2. The works to be taken up under the Scheme, shall fall under the
following Categories, together with their thematic focus and intended
outcomes, namely:—
A. Category I—Water-Related Works (for water security)—
a. The focus shall include conservation, irrigation, groundwater recharge,
source sustainability, rejuvenation of water bodies, watershed
development and afforestation and the I!Nustrative works include—
i. Construction of canals, flood or diversion channels, check dams,
gully plugs and underground dykes;
ii. construction or rejuvenation of ponds, percolation tanks, recharge
pits, recharge shafts, injection wells and associated water
harvesting structures;
iii. Irrigation open wells, micro-irrigation channels and field water
distribution systems;
iv.reclamation of community waterlogged land;
v. afforestation and plantation works linked with soil and moisture
conservation; and
vi.Rooftop rain water harvesting and other decentralized Recharge
systems.
PDF page 2323
b. Intended outcomes —- strengthening of water security through
integrated water resource management, recharge and conservation
for long-term climate resilience.
B. Category II—Core Rural Infrastructure—
a. Thematic focus shali include core civic, social, governance and service-
delivery infrastructure relating to education, health, drinking water,
sanitation, connectivity, renewable energy and community services
and the Illustrative works include—
i. construction or upgradation of rural roads, culverts, cross –
drainage structures and village connectivity facilities;
ii. construction of Village Panchayat Offices, Anganwadi centres,
rural libraries and other public buildings;
jii.construction of school infrastructure, including kitchen sheds,
additional classrooms, laboratories, compound walls and
playgrounds;
iv.crematoria and community infrastructure;
v. solid and liquid waste management assets, including stabilizing
ponds, community sanitary complexes, and waste segregation
and collection centers;
vi.installation of solar lighting systems and other renewable rural
energy infrastructure;
vii. village parking areas, transport sheds and other common rural
amenities;
viii.Rural housing works permissible under the schemes of the
Central Government, including those permitted under the
Pradhan Mantri Awas Yojana—Gramin; and
ix.Repair and maintenance of works created under the Ja! Jeevan
Mission for ensuring water supply.
b. Intended Outcome—Creation of foundational civic and social
infrastructure ensuring basic amenities, improved service access and
enhanced quality of life in rural areas. |
C. Category IlI—Livelihood-related Infrastructure—
a. Thematic focus shall include productive assets and facilities that
enhance rural livelihoods through agriculture, livestock, fisheries,
PDF page 2424
value addition, skilling and enterprise development and _ the
Illustrative works include—
i. Construction of training-cum-skill development centres and
work sheds for livelihood activities;
ii. Rural Haats or weekly markets and other market
infrastructure;
iii. food grain storage buildings, agricultural produce storage
structures, cold storage units and other agri-value chain
infrastructure;
iv. buildings. for Self Help Groups and _ federation-level
institutions;
v. compost structures, including vermicompost and NADEP
units;
vi. development of silvipasture grasslands, dairy
infrastructure and shelters for cattle, goats, pigs, poultry
and other livestock;
vii. fisheries-related infrastructure, including fish drying yards;
viii. raising of nurseries and production of building material
sand
ix. Integrated projects promoting circular and_ cyclical
economy models, as may be approved by the Central
Government.
b. Intended outcome—strengthening of sustainable livelihoods, value :
addition, enterprise development and self-reliant rural economies.
D. Category IV—Special works to mitigate Extreme Weather Events
and Disaster Preparedness—
a. Thematic focus shall include disaster risk reduction, climate
adaptation, and protection of rural communities and assets from
floods, cyclones, storms, droughts, landslides, forest fires and other
extreme weather events and the Illustrative works include.
i. Construction of cyclones shelters, flood shelters and
multipurpose disaster resilient structures;
ii. Construction of diversion channels, embankments and
other disaster- mitigation works;
PDF page 25. | . 25
iii. Stabilizing ponds and water structures for flood
management;
iv. post-disaster rehabilitation, restoration and repair of rural
roads and community assets;
v. windbreak and shelterbelt plantations; and
vi. forest fire management works, including fire breaks fuel
buffer zones and allied measures.
b. Intended Outcome— Creation of climate-resilient villages capable of
withstanding extreme weather conditions.
c. Any other public work which may be notified by the Central
Government.
d. Maintenance of rural public assets created under the Act.
e. Works for individual beneficiaries, under various beneficiary-oriented
developmental schemes expressly notified for inclusion under the
Scheme, may also be taken up. The eligibility of such beneficiaries shall
be aligned with the eligibility criteria specified under the respective
schemes, with all such works conforming to the norms, standards and
guidelines as notified by the Central Government.
29. Eligibility Criteria of the Beneficiary for Individual Beneficiary
Work-
Without prejudice to the generality of the above, works creating
individual assets as notified shall be prioritized on land or homestead
owned by households belonging to—
a. The Scheduled Castes;
b. The Scheduled Tribes;
c. Nomadic tribes;
d. De-notified tribes;
e. Economically weaker sections of the society as identified based on
notified criteria;
f. women-headed households;
g. household shaded by persons with disabilities;
h. beneficiaries of land reforms;
i. beneficiaries under the Pradhan Mantri Awaas Yojana—
Gramin (PMAY-G); and |
|
PDF page 2626 ;
j. beneficiaries under the Scheduled Tribes and Other Traditional Forest
Dwellers (Recognition of Forest Rights) Act, 2006 (2 of 2007), and after
exhausting the eligible beneficiaries under the above categories, works
may be taken up on the lands of small or marginal farmers as identified
on the basis of notified criteria, subject to such conditions as may be
notified, including the requirement that such households possess a valid
job card and have at least one adult member willing to work on the
project undertaken on their land or homestead.
CHAPTER-XII— WORKSITE MANAGEMENT AND SAFETY
30. Facilities at worksites
1. For the purpose of transparency at the work site, the following shall be
ensured—
a. There shall be a project initiation meeting in which various
provisions of the work shall be explained to the workers;
b. A copy of the sanction work order shall be available for public
inspection at the worksite;
c. Measurement record of each work and details of the workers shall
be available for public inspection;
d. A ‘Citizens Information Board’ shall be put up at every worksite
and
e. The vigilance and Monitoring Committee shall check all works and
its evaluation report shal] be recorded in the Works Register and
submitted to the Gram Sabha during the Social Audit.
2. The facilities of safe drinking water, shade for children and periods of
rest, first aid box with adequate material for emergency treatment for
minor injuries and other health hazards connected with the work being
performed shall be provided at the worksite.
3. In case the number of children below the age of five years
accompanying the women working at any site is five or more, provisions
shall be made to depute one of such women workers to look after such
children. The person so deputed shall be paid wage rate.
PDF page 27: 27
31. Safety and accidents
1. If any personal injury is caused to any person employed under the
Scheme by any accident arising out of and in the course of his/ her
employment, he/she shall be entitled to such medical treatment as
required, free of cost.
2. Where hospitalization of the injured worker is necessary, the
Government will arrange for such _ hospitalization including
accommodation, treatment, medicines and payment of daily
allowance which is not less than half of the wage rate.
3. If a person employed under the Scheme meets with death or
becomes permanently disabled by accident arising out of and in the
course of employment, he/She or his/her legal heirs, as the case
may be, shall be paid by the implementing agency an exgratia as
per entitlement under the Pradhan Mantri Suraksha Bima Yojana or
as may be notified by the Central Government.
4. If any personal injury is caused by accident to a child accompanying
a person who is employed under the Scheme, such person shall been
titled to medical treatment free of cost; and in case of death or
disablement of the child due to the said accident, ex gratia shall be
paid to the legal guardians as determined by the Government.
CHAPTER-XIII—RESTRICTION ON UNDER TAKING WORKS DURING PEAK
AGRICULTURAL SEASONS
: 32. Notification of Peak Agricultural Seasons
1. The Government will notify a period or periods aggregating to sixty
days in a financial year, covering the peak agricultural seasons of
sowing and harvesting, during which no works under the Scheme shall
be undertaken.
33. Area-Specific Notifications
1. The Government of Tamil Nadu may issue distinct notifications for
different areas of the State, including districts, blocks or Village
Panchayats, having regard to—
a. agro-climatic zones; |
b. local patterns of agricultural activities; and |
PDF page 2828
c. Such other relevant factors as may be considered necessary.
2. Every notification issued under this provision shall have binding
effect for the purposes the scheme.
34. Prohibition on Works during Notified Periods
1. All authorities responsible for planning, sanctioning or executing works
under the Scheme shall ensure that no work is undertaken during the
periods notified as peak agricultural seasons.
35. Scheduling of Works
1. The Block Development Officer (VP) and other implementing
authorities shall, while approving the aggregated Village Panchayat
Development Plans and scheduling works, ensure that all works are
taken up only outside the notified peak agricultural seasons.
CHAPTER-XIV—ESTIMATE, SANCTIONING AND WORK EXECUTION
36. ESTIMATES—
1. Technical Estimates and Standards for Works— every work under this
Scheme shall have a technical estimate and design sanctioned by an
authority authorised by the Government.
2. For works involving construction, appropriate labour – intensive
technologies, depending upon the availability of labour and the use of
local materials, shall be employed to the extent feasible.
3. Bills of quantities shall use clear and commonly understood
terminology to ensure transparency for all stakeholders.
4. Each work shall have a summary of the estimate, design and a
technical note indicating the expected outputs and outcomes.
5. All technical estimates, designs and outcome notes shall be generated
or uploaded through digital systems integrated with the designated
management information system.
37. Administrative and Financial Sanctions—
1. Works finalized at the Village Panchayat level through the approved
Village Panchayat Development Plan and aggregated at the Block and
District levels shall be accorded administrative and financial sanction
by the District Collector within thirty days from the date of
communication of requirement from the BDO(VP).
PDF page 291 29
2.The sanctioning authorities shall ensure that—
a. The proposed works are drawn exclusively from the approved
Village Panchayat Development Plan;
b. Annual plans would be prepared on the basis of the .
normative allocation.
c. The works are consistent with thematic domains, and the Viksit
Bharat National Rural Infrastructure Stack;
d. All sanctioned works are taken up through the designated
digital portal.
38. Wage Linkage to Output and Schedule of Rates—
1. The wages will be linked to the quantum of work completed, in
accordance with the Rural Schedule of Rates notified on the basis of
time-and-motion studies for different types of work and different
seasons, and revised periodically.
2. A separate Schedule of Rates will be finalised for women, the elderly,
persons with disabilities and persons with debilitating ailments to
facilitate their productive participation in suitable categories of work.
3. The Schedule of Rates will be framed in such a way that an adult
person working for eight hours, inclusive of one hour of rest, can earn
an amount equivalent to the notified wage rate.
4. Working hours of an adult worker may be flexible but shall not
extend beyond twelve hours in a day, including intervals for rest.
39. Inspection and Quality Control—
1. The Government will ensure regular inspection and supervision of
works by designated quality-control teams to verify adherence to
quality standards, accuracy of measurements and conformity of
wage payments to the actual quantum of work executed. Inspection
reports shall be uploaded to the management information system.
|
40. Completion of Ongoing Works—
1. At the time of opening new works, it shall be ensured that ongoing or
incomplete works are prioritised for completion, subject to planning
norms and the approved village Panchayat Development Plans.
PDF page 3030
41. Execution without Contractors—
1. No contractor shall be engaged for the execution of any work or
component financed through expenditure under this scheme. All
such works shall be executed directly by the implementing agencies
in accordance with the processes laid down under the Scheme,
including mandatory proactive disclosures and the social audit
process.
2. In cases of convergence where components of a work are financed
under other schemes, the execution of those components may follow
the norms of the converging scheme, including the use of
contractors where permitted.
3. As far as practicable, works executed by the programme
implementation agencies shall be performed by using manual labour
and no labour displacing machines shall be used.
42. Transparent Procurement of Materials—
1. All materials required for the execution of works shall be procured
by the village Panchayat or the implementing agency as per the
Tamil Nadu Transparency in Tenders Act, 1998, rules made
thereunder and Government Orders issued from time to time. :
CHAPTER-XV—FUNDING PATTERN AND FINANCIAL ARRANGEMENTS
43. Funding Pattern-
1. The Scheme shall be implemented as a Centrally Sponsored Scheme.
2. The funding pattern under the Scheme shall be 60:40 between the
Central Government and the Government of Tamil Nadu.
44, Financial Arrangements-
1. State-wise Normative Allocation: The Annual allocation to the
Scheme shall be the State-wise normative allocation as may be
determined by the Central Government.
2. Expenditure Beyond Normative Allocation: Any expenditure
incurred over and above the State-wise normative allocation shall be
PDF page 3131
borne by the Government of Tami! Nadu.
3. Central and State Share: The share of the Central Government
and State Government within the approved allocation will be in the
ratio of 60:40, as envisaged in the Act. Which shall include
expenditure towards—
i. Payment of wages for unskilled, semi-skilled and skilled
labour engaged under the Scheme;
ii. The material component of works, subject to the
provisions contained in Schedule-I of the Act, and
iii. Such administrative expenses as maybe specified in the
Act.
4, Unemployment Allowance and Delay Compensation: The
Government of Tamil Nadu shall bear the expenditure towards
unemployment allowance and delay compensation payable under the
Scheme, as per the provisions to be notified by the Government.
5. Intra-State distribution of normative Allocation—The Government
shall, upon receipt of the approved normative allocation from the
Central Government, ensure equitable, need-based and transparent
intra-State distribution of the allocation across districts and Village
Panchayats, taking into consideration the categorization of Village
Panchayats and the assessed local needs for determining Village
Panchayat-wise allocations and corresponding district allocations;
and the detailed methodology, parameters and_ procedural
requirements for such distribution shall be notified by the Central
Government.
6. Out of the administrative costs allowed under the Scheme, at least
one-third shall be utilized at the Village Panchayat level to employ and
pay the Gram Rozgar Sahayak (Work Coordinator), other technical
personnel as per the work done and for other administrative expenses,
CHAPTER-XVI—TRANSPARENCY AND PUBLIC DISCLOSURE
45. Proactive disclosure
1. Mandatory Public disclosure shall be under taken through digital
systems integrated with the designated management information |
system and displayed at the village level for public scrutiny. |
|
PDF page 3232
2. Display at every works site “Citizen Information Board” indicating
details of the work, estimated labour days, material quantities in local
terminology, and item-wise costs.
3. Digital and physical display of number of days of employment provided,
wage payments, material payments, guarantees under the Act, works
approved under the Village Panchayat Development Plan, and year-wise
works taken up or completed by the Village Panchayat and other
implementing agencies.
4. Public disclosure of all information relating to works, labour demand,
employment provided, payments, material utilisation and physical
progress under this Scheme shall be carried out through digital systems
integrated with the designated portal. Weekly disclosures shall be done as
per the provision of the Act.
5. The District Collector and Block Development Officer (VP) shall ensure
that their official websites are regularly updated in compliance with
clause (b) of sub-section (1) of section 4 of the Right to Information Act,
2005 (22 of 2005), with all information on the Act available in free,
downloadable electronic form.
6. All accounts and records including muster rolls relating to the scheme
shall be made available for public scrutiny free of cost. Any person
desirous of obtaining a copy or relevant extracts therefrom may be
provided such copies or extracts on demand not later than three
working days from the date of receipt of application.
CHAPTER-XVII —SOCIAL AUDIT
46. Conduct of Social Audit
1. All works, expenditures and guarantees under this Scheme shall be
subject to social audit at least once every six months.
2. The procedure, standards and modalities for conducting social audits shall
be as per the rules notified by the Central Government.
3. Until such rules are notified, the provisions of the Mahatma Gandhi
National Rural Employment Guarantee Audit of Schemes Rules, 2011
shall, mutatis mutandis, apply to the conduct of social audits under
this Act.
47. Compliance with findings
1. Findings of the social audit shall be placed in the Gram Sabha.
PDF page 33oa 33
2. Corrective and recovery actions shall be initiated without delay.
3. Action-taken reports shall be recorded in the MIS.
4. Any misappropriation of amounts spent under the Scheme shall be
recoverable under the relevant revenue laws for recovery
prevailing the State.
5. The portion of such recoveries pertaining to the Central share shall
be remitted to the Consolidated Fund of India through the
mechanism established by the Central Government.
48. Annual Reporting—
1. The District Collector and Block Development Officer (VP) and each
Village Panchayat shall prepare an annual report detailing facts,
figures and achievements relating to the implementation of the
Scheme within the jurisdiction. A copy of such report shall be made
available to the public in physical or electronic form, on payment of
such fee as may be specified in the Scheme.
CHAPTER-XVITI—GRIEVANCE REDRESSAL AND OMBUDSPERSON
49.Grievance Redressal Mechanism: An effective grievance redressal
mechanism shall be established under the Scheme, comprising the
following components, namely:—
1. Institutional mechanisms for receiving grievances at the Village
Panchayat, Block and District levels, with at least one designated day
each week when officials shall be mandatorily available to receive
grievances;
2. Every worker shall have an opportunity of being heard and register any
grievance either orally or in writing, at all implementation levels for |
disposal as per the provisions of the Grievance Redressal Mechanism
under the Scheme.
3. Issuance of a dated acknowledgement for all grievances submitted
in writing, telephonically, online, or orally to any authorized
functionary;
4. Enquiry through spot verification or inspection and disposal shall
be completed within seven working days of receipt of the |
grievance;
5. Upon completion of the enquiry, the concerned authority shall
initiate immediate corrective action, and the grievance shall be |
resolved within fifteen days;
PDF page 3434
6. Failure to dispose of a grievance within seven working days at the
level determined, shall be treated as a contravention of the
provisions of this Act;
7. Where prima facie evidence of financial irregularity is revealed
during preliminary enquiry or through findings of the social audit
report, the District Collector shall, after obtaining legal advice,
ensure that a First Information Report is lodged and necessary
proceedings initiated;
8. The concerned authority shall inform the complainant in writing,
physically or digitally, of the conclusions of the enquiry and the
steps taken for redressal;
9. Action taken on grievances received by all implementing agencies
shall be placed before the meetings of the Panchayat Raj
Institutions as indicated in the Act.
10. Appeals against the orders of the Village Panchayat shall lie before
the Block Development Officer (VP); appeals against the orders of
the Block Development Officer (VP) shall lie before the District
Collector; appeals against the orders of the District Collector shall
lie before the State Grievance Redressal Authority or any officer
designated by the Government;
11. All appeals shall be filed within forty-five days from the date of the
order;
12. All appeals shall be disposed of within thirty days from the date of
receipt;
13. Any grievance not resolved within fifteen days at the Village
Panchayat, Block or District level shall be automatically escalated
to the next higher level through digital systems integrated with the
designated management information system, and such escalations
shall be continuously monitored electronically.
50. Record maintenance and grievance redressal system—
1. The Village Panchayat shall prepare and maintain or cause to be
prepared and maintained such registers, vouchers and other
documents in such form and in such manner as may be specified in
the Scheme containing particulars of Rural Employment Guarantee
Cards and passbooks issued, name, age and address of the head of
PDF page 35: 35
the household and the adult members of the households registered
with the Village Panchayat.
51. Ombudsperson
1. The Government of Tamil Nadu shall appoint an Ombudsperson for
each District to receive grievances, conduct enquiries and issue awards
in accordance with the guidelines notified by the Central and the State
Government. The Ombudsperson shall operate through digital
platforms integrated with the designated digital portal under this Act.
CHAPTER-XIX—MONITORING, INSPECTION AND EVALUATION
52. Monitoring and Inspections
1. The Government will monitor implementation at State, District and
Block levels.
2. The Government will issue separate orders indicating the Procedure for
Inspections by various officials for the proper implementation of the
scheme.
3. Dashboards and analytical reports shall be maintained in the MIS.
53. Evaluation
1. Independent evaluations shail be undertaken periodically to assess
outcomes and impact.
2. For ensuring measurable outcomes and real-time accountability,
technology-enabled monitoring shall be mandated for tracking work
execution and post-completion asset outcomes, supported by verified
data systems and spatial technologies. Weekly public disclosures shall
be reinforced through a comprehensive transparency framework. A
Concurrent Evaluation Mechanism as specified by the Central
Government, shall provide continuous vigilance and enable timely |
corrective action.
CHAPTER-XX—TRAINING AND CAPACITY BUILDING |
54. Training and Capacity Building
1. The Government will prepare and implement a dedicated plan for
capacity building and strengthening of Panchayat Raj Institutions for |
effective planning, execution, supervision and monitoring of the Scheme.
PDF page 3636
2. The capacity-building plan shall, inter alia, include activities relating to:
a. Training of elected representatives and functionaries of Panchayat Raj
Institutions on roles and responsibilities under the Scheme;
b. Information, Education and Communication (IEC) initiatives to
enhance awareness regarding the provisions of the Scheme,
transparency mechanisms and community participation;
c. Digital literacy and orientation on the use of Management
Information Systems, geo-tagging tools and other digital platforms;
d. Strengthening institutional systems in Panchayat Raj Institutions for
record keeping, financial management, grievance redressal, social
audit and asset maintenance.
3. The plan shall be prepared annually, based on field requirements, and
shall be integrated with the State Training and Capacity Building
framework under the Scheme.
4, Panchayat Raj Institutions shall extend full cooperation in organizing
such capacity- building initiatives and shall ensure participation of
elected representatives and functionaries.
5. Expenditure on activities undertaken under this provision shall be met
from permissible administrative and capacity-building heads, as may be
specified by the Central Government and the State Government.
CHAPTER-XXI-CLOSING FORMULA
This Scheme shall be read harmoniously with the provisions of the Act.
In the event of any inconsistency, the provisions of the Viksit Bharat—
Guarantee for Rozgar and Ajeevika Mission (Gramin) VB-G RAM G Act, 2025
shall prevail.
The field functionaries should strictly adhere the provisions of the
Scheme Guidelines of Viksit Bharat—Guarantee for Rozgar and Ajeevika Mission
(Gramin) (VB-G RAM G) Scheme, Tamil Nadu – aemftéfucoiibs umgsib —
&lrmo CGaionow 2_mi§) wibprd ambamsm §i__tb, sblipprG.
The Secretary to Government, Rural Development and Panchayat Raj
Department in consultation with Director/Commissioner of Rural Development and
Panchayat Raj will issue necessary amendments to the Scheme Guidelines as and
when required and based on the appraisal of the scheme time to time.
PDF page 37ay 37
Annexure
List of Works
A. Category I—Water-Related Works (for water security)—
i. Construction of canals, flood or diversion channels, check dams, gully
plugs and underground dykes;
ii; construction or rejuvenation of ponds, percolation tanks, recharge pits,
recharge shafts, injection wells and associated water harvesting
structures;
iii. irrigation open wells, micro-irrigation channels and field water distribution
systems;
iv. reclamation of community waterlogged land;
v. afforestation and plantation works linked with soil and moisture
conservation; and
vi. Rooftop rainwater harvesting and other decentralized recharge systems.
B. Category I1I—Core Rural Infrastructure—
i. construction or upgradation of rural roads, culverts, cross-drainage
structures and village connectivity facilities;
ii, construction of Village Panchayat Offices, Anganwadi centres, rural
libraries and other public buildings;
iii. Construction of school infrastructure, including kitchen sheds, additional
classrooms, laboratories, compound walls and playgrounds;
iv. crematoria and community infrastructure;
v. solid and liquid waste management assets, including stabilising ponds,
community sanitary complexes, and waste segregation and collection
centres;
vi. installation of solar lighting systems and other renewable rural energy
infrastructure;
vii. village parking areas, transport sheds and other common rural amenities;
viii. Rural housing works permissible under the schemes of the Central
Government, including those permitted under the Pradhan Mantri Awas
Yojana—Gramin; and
ix. Repair and maintenance of works created under the Jal Jeevan Mission for
ensuring water supply.
PDF page 3838
Cc. Category III—Livelihood-related Infrastructure—
i. Construction of training-cum-skill development centres and work sheds for
livelihood activities;
ii, Rural haats or weekly markets and other market infrastructure;
iii. food grain storage buildings, agricultural produce storage structures, cold
storage units and other agri-value chain infrastructure;
iv. buildings for Self Help Groups and federation-level institutions;
v. compost structures, including vermi compost and NADEP units;
vi. development of silvipasture grasslands, dairy infrastructure and shelters
for cattle, goats, pigs, poultry and other livestock;
vii. fisheries-related infrastructure, including fish drying yards;
viii.raising of nurseries and production of building material; and
ix. Integrated projects promoting circular and cyclical economy models, as
may be approved by the Central Government.
D. Category IV—Special works to mitigate Extreme Weather Events
and Disaster Preparedness—
i. Construction of cyclones shelters, flood shelters and multipurpose disaster
resilient structures;
ii. Construction of diversion channels, embankments and other disaster-
mitigation works;
iii. Stabilizing ponds and water structures for flood management;
iv. post-disaster rehabilitation, restoration and repair of rural roads and
community assets;
v. wind break and shelter belt plantations; and
vi. forest fire management works, including fire breaks, fuel buffer zones and
allied measures.
vii. Any other public work which may be notified by the Central Government.
viii. Maintenance of rural public assets created under the Act.
PDF page 39ae 39
Works for individual beneficiaries, including but not limited to housing-related
works under the Pradhan Mantri Awaas Yojana—Gramin, sanitation-related
works, and other beneficiary-oriented developmental works undertaken under
various schemes of the Central Government from time to time and expressly
notified for inclusion.
PRASHANT M WADNERE
SECRETARY TO GOVERNMENT
//True Copy// £
Ga a
cain Officer
ga\¥