G.O.(Ms) No.185

All Government Orders

OrderG.O.(Ms) No.185
DepartmentMunicipal Administration and Water Supply Department
Official titleMunicipal Administration and Water Supply Department – Guidelines for Rejuvenation of Water Bodies by Corporates / Firm / Non-Governmental Organizations / Community Based Organizations / Educational Institutions subject to the restrictions issued in the G.O. (Ms) No. 50, Industries (MMC-1) Department, dated 27.04.2017 and further amendments issued thereon – Approved – Orders Issued.
Listed on the official site16 October 2026
Pages16
Official PDFOpen the PDF on tn.gov.in

Text of the order

Read this first. This text was read from the PDF by computer, not typed by a person. Most Government Orders are scanned pages, so names, numbers, amounts and Tamil text can be read wrongly or left out. The official PDF is the authority: check anything you rely on against it.

Show the text (35,841 characters). Read from scanned pages by optical character recognition.
PDF page 1ABSTRACT Municipal Administration and Water Supply Department – Guidelines for Rejuvenation of Water Bodies by Corporates / Firm / Non-Governmental Organizations / Community Based Organizations / Educational Institutions subject to the restrictions issued in the G.O. (Ms) No. 50, Industries (MMC-1) Department, dated 27.04.2017 and further amendments issued thereon – Approved – Orders Issued, Municipal Administration and Water Supply (MA.5(2)) Department G.O (Ms) No. 185 Dated: 16.10.2026 AGearst@nannairG 2057 WB uTTUeL a1g5Lib, yma 29 Read: From the Director of Municipal Administration {etter Roc No. 22106/2026/G, dated 06.10.2026. ACO CK ORDER: In the letter read above, the Director of Municipal Administration has stated that, there are approximately 1,931 water bodies under the Corporations and Municipalities and over 2,253 water bodies in Town Panchayats. These waterbodies are under the maintenance of concerned Local bodies and have been rejuvenated through various Government schemes, 2. To supplement Government efforts, Corporate Social Responsibility (CSR) of Companies, Non-Governmental Organisations (NGOs) and Public Contributions were leveraged through Public – Participatory Namakku Name Thittam (NNT) Scheme. 3. Despite these restoration efforts, a significant number of water bodies have not yet been restored to their original storage capacity and require further rejuvenation and conservation measures. 4. Hence, the Director of Municipal Administration has requested the Government to approve the guidelines which are enclosed in the Annexure-I for the Rejuvenation of Water Bodies by Corporates / Firms / Non-Governmental Organizations (NGOs)/ Community Based Organizations (CBOs) / Educational Institutions subject to the restrictions issued in the G.O.(Ms) No. 50, Industries (MMC-1) Department, dated 27.04.2017 and further amendments issued thereon. 5. The Government, after careful examination of the proposal of the Director of Municipal Administration, have decided to accept the proposal of Director of Municipal Administration and approve the guidelines which are in the Annexure-I for the Rejuvenation of Water Bodies by Corporates / Firms / Non-Governmental Organizations (NGOs)/ Community Based Organizations (CBOs) / Educational Institutions subject to the restrictions issued in the G.O.(Ms) No. 50, Industries (MMC-1) Department, dated 27.04.2017 and further amendments issued thereon. 6. The Government also authorise the Corporation / Municipal Commissioner concerned for Corporation / Municipality and Assistant Director (Town panchayats) concerned for Town Panchayats to sign the Memorandum of Understanding (MoU) with the organisation concerned as per the format in Annexure-II. A work completion certificate in Annexure-III is also enclosed. (BY ORDER OF THE GOVERNOR) GAGANDEEP SINGH BEDI, ADDITIONAL CHIEF SECRETARY TO GOVERNMENT To: The Commissioner, Greater Chennai Corporation, Chennai – 600 003. The Director of Municipal Administration, Chennai – 600 028. The Director of Town Panchayats, Chennai – 600 028. The Principal Accountant General, Chennai – 600 018. The Pay and Accounts Officer (North), Chennai ~ 600 035. The Commissioner, Treasuries and Accounts, Chennai – 600 035. The District Treasury Officers (concerned), Chennai – 600 009. Copy to: – Hon’ble Chief Minister Office, Chennai – 600 009. The Special Personal Assistant to Hon’ble Minister for Schoo! Education, Tamil Development, Information and Publicity, Chennai – 600 009. The Principal Private Secretary to Additional Chief Secretary to Government, Municipal Administration and Water Supply Department, Chennai – 600 009. The Finance (Infra – IV/BG.II/Res-II/W&M-I) Department, Chennai – 600 009. The Municipal Administration and Water Supply Department (OP-II) Department, Chennai — 600 009. / {FORWARDED BY ORDER// r — Pes Sebo € ANNEXURE -T (G.0.(Ms) No. 185, Municipal Administration and Water Supply Department, dated 16.10.2026) Guidelines for Rejuvenation of Water Bodies by Corporates/Firms/ NGOs/CBOs/Educational Institutions subject to the restrictions issued in the G.O.(Ms) No.50, Industries (MMC-1) Department, dated 27.04.2017 and further amendments issued thereon. 1. Introduction There are approximately 1,931 water bodies under the Corporations and Municipalities and about 2,253 waterbodies in Town Panchayats. These waterbodies are managed by the concerned local bodies. These water bodies have been rejuvenated through various Government schemes. Despite these restoration efforts, a significant number of water bodies have not yet been restored to their original storage capacity and require further rejuvenation and conservation measures. The State largely depends on monsoon rainfall for replenishment of its water resources. Any deficiency or failure of the monsoon often results in water scarcity, reduced groundwater recharge and drought conditions, adversely affecting drinking water supply and urban livelihood. To supplement Government efforts, Corporate Social Responsibility (CSR) funds of Companies, Non-Governmental Organisations (NGOs), Community Based Organisations (CBOs) and Educational Institutions may be leveraged for the rejuvenation and conservation of water bodies. 2. Objective e To restore the Water bodies to their original capacity. * To ensure increase in ground water recharge and increase in Ground Water Level (GWL). * To put in place flood mitigation measures by preventing surplus runoff and breaches in the water bodies. ¢ To regulate storage of water for drinking and agricultural purposes, thereby ensuring sustainable drinking water supply and increasing the crop productivity and area irrigated. * To enhance the capacity of Water bodies as part of Disaster Management efforts towards both floods and drought. 3. Scope of Works ° Desilting and deepening of water bodies. ¢ Desilting and restoration of supply, inlet and outlet channels. * Removal of jungle growth, bushes, shrubs, invasive vegetation, garages and other debris from water body area and bund slopes. Strengthening, sectioning and consolidation of bunds. Restoration of bunds to the original cross-section and approved slope. Restoration of sluices, surplus weirs and related hydraulic structures. Prevention of waste water contamination. 4. Selection of Works Water bodies that have been rejuvenated or restored during the preceding three years (i.e. completion of the sanctioned work) under Government schemes such as AMRUT, I&A, AMRUT 2.0, CGF, 15" CFC, KNMT NNT or any other funding source, shall not be eligible. 5. Modes of Implementation The above works may be taken up as per the following modes: e Mode A: Funded and Executed by Corporates/ Firms/ NGOs/ CBOs/ Educational Institutions e Mode B: Works Executed by the Department with Funding from Corporates/ Firms/ NGOs/ CBOs/ Educational Institutions « Mode C: Machineries and kind provided by Corporates/ Firms/ NGOs/ CBOs/ Educational Institutions « Mode D: Executed through modalities detailed under G.O.(Ms) No.50 of Industries (MMC-1) department dated 27.04.2017 and further amendments. 5. A. Funded and Executed by Corporates / Firms / NGOs / CBOs / Educational Institutions e The Corporates/ Firms/ NGOs/ CBOs/ Educational Institutions intending to undertake the rejuvenation of a water body shall submit their proposal to the Commissioner, Greater Chennai Corporation / Director of Municipal Administration /Director of Town Panchayats. « The Commissioner, Greater Chennai Corporation / Director of Municipal Administration /Director of Town Panchayats shall forward the proposal to the respective Assistant Commissioner / Deputy Commissioner (in case of Greater Chennai Corporation), Commissioner/ Executive Officer (in case of Corporations/ Municipalities/Town Panchayats) of the concerned Zone/ ULBs for field verification and technical examination. « The Assistant Commissioner/ Deputy Commissioner (in case of Greater Chennai Corporation), Commissioner/ Executive Officer of the concerned Zone/ULBs shall conduct a field inspection of the proposed water body and submit recommendations to the Commissioner, Greater Chennai Corporation / Director of Municipal Administration /Director of Town Panchayats (directly in case of Corporations (incl. Greater Chennai Corporation), through Regional Director of Municipal Administration for Municipalities and through concerned Assistant Director for Town Panchayats) either by accepting the proposal or returning it with specific observations and remarks within 15 days from the date of receipt of the proposal. * Based on the recommendations, The Commissioner, Greater Chennai Corporation / Director of Municipal! Administration /Director of Town Panchayats shall direct the Assistant Commissioner/ Deputy Commissioner (in case of Greater Chennai Corporation), Commissioner/ Executive Officer (in case of Corporations/ Municipalities/ Town Panchayats) of the concerned Zone / ULBs to issue a No Objection Certificate (NOC) for the commencement of the rejuvenation work within 7 days. e The department shall provide technical guidance for preparing the Detailed Project Report (DPR) and after approval, for the execution of the work. : « After that, a Memorandum of Understanding (MoU) may be executed by concerned Corporate/ Firm/ NGO/ CBO/ Educational Institution with the Urban Local Body concerned. e Upon issuance of the NOC and signing of the Memorandum of Understanding (MoU), the Corporate/ Firm/ NGO/ CBO/ Educational Institution funded work shall commence immediately and be completed within three months from the date of execution of the MoU. « The implementation schedule shall be planned to ensure that the works are completed well before the onset of the monsoon season, thereby preventing delays due to adverse weather conditions and enabling effective storage and conservation of rainwater. 5. B. Works Executed by the ULB with Funding from Corporates / Firms / NGOs / CBOs / Educational Institutions If Corporates/ Firms/ NGOs/ CBOs/ Educational Institutions request that the works may be executed by the Urban Local Bodies, the following procedure is to be adhered: 5.B.1. Estimate Preparation: The estimates and Detailed Project Report shall be prepared by the concerned Engineer as per the Schedule of Rates (SoR). The Assistant Commissioner/ Deputy Commissioner (in case of Greater Chennai Corporation), Commissioner/ Executive Officer (in case of Corporations/ Municipalities/Town Panchayats) should inspect the site before according Administrative Sanction. The Engineers concerned of the Urban Local Body shall exclusively inspect and verify the works proposed in the field, check the correctness of the estimates. 5.B.2.Administrative Sanction Administrative Sanction shall be accorded by the competent Authority under the Tamil Nadu Urban Local Bodies Rules, 2023 & updated instructions. 5.B.3. Technical Sanction: Technical sanction will be accorded by the competent authority as per the Tamil Nadu Urban Local Bodies Rules, 2023 & updated instructions. 5.B.4. Tendering: The works will be executed by following the Tamil Nadu Transparency in Tenders Act, 1998 and Rules 2000. e-Tender mode will be followed for all the works. 5.B.5. Execution of Work: The works shall be executed as per the technical standard (given in clause 6.2) and execution (given in clause 6.3). 5.B.6. Flow of Funds: The funds provided by Corporate Social Responsibility of Corporates / Firms /NGOs/CBOs/Educational Institutions will be with Assistant Commissioners/ Deputy Commissioners (in case of Greater Chennai Corporation), Commissioners/ Executive Officers (in case of Corporations/ Municipalities/Town Panchayats). The Assistant Commissioners/ Deputy Commissioners (in case of Greater Chennai Corporation), Commissioners/ Executive Officers (in case of Corporations/ Municipalities/Town Panchayats) shall open a separate account at the ULB level and all payments to the vendors shall be done through this account. 5.C. Machineries Provided by Corporates / Firms / NGOs / CBOs / Educational Institutions If Corporates /Firms /NGOs /CBOs /Educational Institutions provide Machineries, the following procedure is to be adhered: « The Corporates/Firms/NGOs/CBOs/Educational Institutions shall provide the required machinery or any other kind at free of cost for the approved rejuvenation works. « If fuel charges, skilled and unskilled labour are borne by another Corporate/ Firm/ NGO/ CBO/ Educational Institution, then the works shall be executed by ULB with fund tie-up with two or more parties. e The estimate shall be prepared by the ULB Engineer for assessing the time and fuel required for utilizing machinery based on the quantity to be desilted at site. The same_ shall be _ intimated to Corporates/Firms/NGOs/CBOs/Educational Institutions. e A proceeding shall be issued by the Assistant Commissioner/ Deputy Commissioner (in case of Greater Chennai Corporation), Commissioner/ Executive Officer (in case of Corporations/ Municipalities/Town Panchayats) mentioning quantity of fuel required, machinery details, working hours and labour requirement. « The works shall be monitored and executed under the supervision of the Technical Officers (Assistant Engineer /Assistant Executive Engineer /Executive Engineer / Superintending Engineer / Chief Engineer) and compieted within the stipulated time. « M-book along with proper hourly logbook of machineries, daily records of machinery utilization, fuel consumption, and labour engagement shall be maintained by the department officials. ¢ Joint inspection may be done by the department officials along with Corporates/Firms/NGOs/CBOs/Educational Institutions. e Documentation along with Geo-tagged photographs shall be carried out by the department officials. 5.D Desilting of Water Bodies under G.O. (Ms) No.50, Industries (MMC-1) Department, dated 27.04.2017 and further amendments issued thereon. The Assistant Commissioners/ Deputy Commissioners {in case of Greater Chennai Corporation), Commissioners/ Executive Officers (in case of Corporations/ Municipalities / Town Panchayats) should convene co-ordination meeting with ail the stake holder Departments to identify and finalize the list of waterbodies, proposed for removal of clay/silt /earth. (such waterbodies should not be taken up for the desilting through Schemes / Corporate Social Responsibility funds etc.,) The following points to be noted before commencement of work: a) The Assistant Commissioners/ Deputy Commissioners (in case of Greater Chennai Corporation), Commissioners/ Executive Officers (in case of Corporations/ Municipalities/Town Panchayats) to oversee the compilation of the list of waterbodies and ensure that the water bodies belong to Municipal Administration and Water Supply Department. b) Care should be taken not to damage the bund during the removal of clay and silt. c) In the case of waterbodies which are utilised for irrigation, the level should be maintained to ensure smooth flow of water to the fields. It should not go below Sill Level of the tank. d) The depth of excavation should not exceed the permissible limit. e) Prior permission shall be obtained from the Tahsildar for removal of such quantity of silt from the waterbodies and the period of permission shall not exceed 30 days. f) Concerned officials should monitor the process cautiously and there should not be any deviation from the Government Orders and Guidelines. g) The farmers shail arrange for removal and conveyance at their own cost as indicated in Appendix to G.O.(Ms.) No.50, Industries (MMC.1) Department, dated:27.04.2017 and this shall be monitored by the District Collectors. h) An official is to be nominated to monitor the desilting of water bodies at the ULB level. i) City Engineer/ Superintending Engineer/ Executive Engineer / Assistant Executive Engineer / Assistant Engineer to ensure that the guidelines mentioned in the SoP is followed during desilting of waterbodies. 6.1. Participatory Approach Welfare associations may be involved for desilting of water bodies. 6.2. Technical Standards All works shail be executed strictly in accordance with the Public Works Department (PWD) Schedule of Rates (SoR). 6.2.1 Technical Specifications * Identification and marking of boundary of the water body as per the actual extent in the FMB sketch. * Boundary stones shall be fixed to clearly delineate the extent of the water body and to avoid any encroachments in the future. ° The FMB sketch and other details that may be required for the Preparation of project report shall be collected from the Town Surveyor. ¢ Topographical survey of the water body shall! be carried out using Auto levels/Total Station etc. The reference benchmarks shall be e established. Tank Bund Level (TBL), Full Tank Level (FTL), Maximum Water Level (MWL) shall be marked on the relevant places. e Contour survey with a 10m x 10m grid shall be carried out covering the entire water spread area. « This shall be followed by carrying out levels of the cross and longitudinal! sections of the Tank Bund at an interval of 30m. ¢ The Contour map should be plotted to the required scale and the quantum of earth work to be done shall be worked out based on the current storage capacity and the original storage capacity. ¢ Similarly, the quantum of earth work required to be deposited on the tank bund to restore it to its original cross section should be assessed. » The contour mapping, details of pre-levels, earth work calculation sheet etc. duly certified by the Assistant Engineer/Assistant Executive Engineer shail be submitted to the Chief Engineer for corporations, Regional Executive Engineer for Municipalities and Executive Engineer for Town Panchayats. « The total quantity of silt to be excavated from the water body is to be assessed. The depth of silt shall be assessed judiciously, ensuring that there will be no depletion of water body after de-siltation. ¢ The excavation of de-siltation bed may be in uniform gradient between FTL contour and sluice sill level. « Desilting/Deepening of Inlet/Outlet channels shall also be taken up so that the surplus water can flow from one water body to other water body. e Provision for dead storage in the form of trenches running parallel to the bund at a distance of 40m or 5 times the height of the bund from the toe of the bund shall be provided, keeping the depth not exceeding 0.60m subject to a depth of 45 cm above sandy/permeable layer. The size of the trenches shall be decided by the field Engineers. 6.2.2 Detailed Project Report (DPR) for the Desilting of Waterbodies « In general, the DPR may consist of the following (this is indicative only). Memoir containing the Hydraulic particulars of the Water body. Trial pit particulars. FMB Sketch. L.S and C.S of the bund. Pre-measurement particulars and contour drawings (coloured) of the proposed site should compulsorily be part of the estimate. Earthwork calculation sheet. e Reduced levels to be furnished wherever necessary. ¢ Certificate specifying that the proposed work has not been executed for the past three years under any Government Scheme. Photos of all the components taken up in the estimate (inlet channel, outlet channel, inlet and outlet, proposed deepening site, section of the bunds with or without revetment, etc.). Rate Analysis, Detailed Estimate, and Abstract Estimate. 6.3 Execution of Works Technical standards to be followed during execution: Jungle/Garbage Clearance shall be done on the entire extent of water spread area and disposed properly away from the site. Heavy Jungle shall be uprooted completely without leaving any stumps using machinery. In the case of karuvel trees etc., proper auctioning shall be done by following due procedures and the sale proceeds shall be remitted into the ULB. The Jungle growth, bushes, roots, on the upstream and downstream slopes of the bund shall be removed completely. Desiiting and Deepening of the water spread area and the supply channels including removal of heavy Jungle in the water spread area shall be done using machineries and by adopting the Public Works Department (PWD) schedule of rates (SoR). In case of bigger water bodies, desilting / deepening of the outer pond and baby pond: outer pond depth should be arrived based on the existing depth and the baby pond which is half the length and half the breadth of the main pond, should be dug up. If the pond is very large, the size of the pond may be decided according to the local conditions. The baby pond along with lead channel should be dug up to a depth of minimum 1 metre beneath the level of main pond subject to depth of 45cm above sandy/permeable layer. Depth of excavation shall be done upto the original levels and shall be pre-marked at site before commencement of earth work. Reference Benchmarks shall be established on both directions of the water body to cross verify the depth of excavation, particularly in sluice head wall and permanent tree outside the water spread area. Small Vertical Pillars (Thandoos) should be left at proper intervals to verify the depth of completed excavation. Proper benching of the existing slope should be done for effective bonding of the fresh earth placed over the old embankment. The dimensioning of benches shall normally be 30 cm x 30 cm or 45 cm x 45 cm or more. Sectioning, Strengthening and consolidation of the bund using the excavated earth and to restore the bund to the required cross section through machineries like JCB, Power Roller and Tipper/Tractor, etc. During earth filling on the bunds, extra width of 30 cm or more is to be laid to ensure full compaction of designed section. Provision of this extra earth fill, and its later trimming to the designed slope. e Compaction of earth fill in layers of 25 cm thickness over the bund shall be done to 95% Proctor density (OMC). Mechanized compacting equipment such as power rollers, vibratory rollers, plate compactors shall be used taking into consideration the top width of the bund. e The top width and both side slopes shall be maintained based on the height of the bund and the nature of soil. « Restoring the bund to its original cross section and slope 1.5:1 for Upstream Side and 2:1 for Downstream Side. ¢ Desilting/Deepening of Inlet/Outlet channels should also be taken up so that the surplus water can flow from one tank to another tank. In case of stand alone Water body, inlet and outlet channels should be desilted at least for the length of 100m. 6.4 Disposal of Excavated Material The excess excavated clay, silt, savudu and gravel shall be given free of cost to the farmers for agriculture, public for domestic purpose and potters. The cost for this excess quantity should not be added in the Estimate cost of the works. 6.5 Monitoring and Quality Control ¢ The Commissioner in case of Corporation and Regional Director of Municipal Administration / Assistant Director (Town Panchayats) in case of Municipalities / Town Panchayats shall monitor implementation. ¢ Nodai officers in the cadre of Additional Director of Municipal Administration / Chief Engineer /Superintending Engineer shall be deputed for inspections periodically. 6.6 Documentation and Reporting Proper documentation of the works should be done capturing various processes in the implementation of scheme starting from selection of works till the completion of works. ¢ High Resolution Photographs and videos of the site before, during and after completion of works should be taken and properly documented. ¢ Work completion certificate enclosed in Annexure-II should be documented for the completed works. The Additional Chief Secretary to Government, Municipal Administration and Water Supply Department is empowered to modify these guidelines in consultation with the Commissioner, Greater Chennai Corporation, Director of Municipal Administration and Director of Town Panchayats as and when required. GAGANDEEP SINGH BEDI, ADDITIONAL CHIEF SECRETARY TO GOVERNMENT //TRUE COPY// ANNEXURE – IT (G.O.(Ms) No. 185, Municipal Administration and Water Supply Department, dated 16.10.2026) Memorandum of Understanding (MoU) between Corporates/Firms/ NGOs / CBOs/ Educational Institutions and ULBs. This Memorandum of Understanding (MoU) is made and entered into on this day of month of year by and between Corporate Social Responsibility having its Head Office at (hereinafter referred to as Corporates/Firms / Non-Governmental Organizations (NGOs)/ Community Based Organizations (CBOs) / Educational Institutions) which term shall include its successors, affiliates and assigns of ONE PART AND the Assistant Commissioner/ Deputy Commissioner (of Greater Chennai Corporation), Commissioner/ Executive Officer (in case of Corporation/ Municipality/ Town Panchayat) having its Office at (hereinafter referred to as ULB) which term shall include its successors, affiliates and assigns of the OTHER PART. WHEREAS, the Assistant Commissioner/ Deputy Commissioner, Commissioner/ Executive Officer, is responsible for the development of urban areas in ULB, including the rejuvenation of water bodies; NOW, THEREFORE, in consideration of the foregoing premises and the mutual covenants hereinafter set forth, the parties hereto agree as follows: 1. Objective The objective of this MoU is to establish a framework for collaboration between the ULB, Greater Chennai Corporation (Zone)/ Corporation / Municipality/Town Panchayat and the Corporates/Firms/ Non-Governmental Organizations (NGOs) / Community Based Organizations (CBOs) / Educational Institutions for the rejuvenation of water bodies in District for a period of 3 months commencing from the date of execution of this MoU (the “Project Period"). 2. Scope of work ¢ Desilting and deepening of water bodies. e Desilting and restoration of supply, inlet and outlet channels. e Removal of jungle growth, bushes, shrubs and invasive vegetation from water body area and bund slopes. e Strengthening, sectioning and consolidation of bunds. e Restoration of bunds to the original cross-section and approved slope. * Restoration of sluices, surplus weirs and related hydraulic structures. 3. Responsibilities of the ULB, Greater Chennai Corporation (Zone)/ Corporation/ Municipality/Town Panchayat. To Provide Hydraulic particulars and land details with FMB of Water body for the effective outcome of the project. To Provide technical guidance and support to the Corporates/ Firms/ Non-Governmental Organizations (NGOs) / Community Based Organizations (CBOs) /Educational Institutions for the implementation of the Project. To Facilitate necessary permissions and clearances from relevant authorities for the execution of rejuvenation work. To conduct monitoring visits to assess the progress of the Project. 4. Responsibilities of the Corporates/Firms/ Non-Governmental Organizations (NGOs) / Community Based Organizations (CBOs) /Educational Institutions To prepare the estimates as follows: Identification and marking of boundary of the water body as per the actual extent in the FMB sketch. Topographical survey of the water body shall be carried out using Auto levels/Total Station etc. The reference benchmarks shall be established. Tank Bund Level (TBL), Full Tank Level (FTL), Maximum Water Level (MWL) shall be marked on the relevant places. Contour survey with a 10m x 10m grid shall be carried out covering the entire water spread area. This shall be followed by carrying out levels of the cross and longitudinal sections of the Tank Bund at an interval of 30m. The Contour map should be plotted to the required scale and the quantum of earth work to be done shall be worked out based on the current storage capacity and the original storage capacity. Similarly, the quantum of earth work required to be deposited on the tank bund to restore it to its original cross section should be assessed, The contour mapping, details of pre-levels, earth work calculation sheet etc., duly certified by the Assistant Engineer/Assistant Executive Engineer shall be submitted to the Chief Engineer for corporations, Regional Executive Engineer for Municipalities and Executive Engineer for Town Panchayats. The excavation of de-siltation bed may be in uniform gradient between Full Tank Level contour and sluice sill level. Desilting/Deepening of Inlet/Outlet channels shall also be taken up so that the surplus water can flow from one water body to other water body. Jungle clearance should be done wherever necessary. Provision for dead storage in the form of trenches running parallel to the bund at a distance of 40m or 5 times the height of the bund from the toe of the bund shall be provided, keeping the depth not exceeding 0.60m subject to a depth of 45 cm above sandy/ permeable layer. The size of the trenches shail be decided by the field Engineers. Desilting & deepening of water spread area, Desilting of linking channel and Strengthening & Consolidation of bund, will be implemented with the technical guidance of department. In case of waterbodies of the outer pond and baby pond outer pond depth should be arrived based on the existing depth and the baby pond which is half the length and half the breadth of the main pond, should be dug up. If the pond is very large, the size of the pond may be decided according to the local conditions. The baby pond along with lead channel should be dug up to a depth of minimum 1 metre beneath the level of main pond subject to depth of 45cm above sandy/permeable layer. To Employ qualified personnel and utilize appropriate technologies for the rejuvenation work. Proper documentation of the works should be done capturing various processes in the implementation of scheme starting from selection of works to till the completion of works. Photographs of the site before, during and after completion of works should be taken and properly documented. 5. Terms of Reference Ensure that the project is handled only by the authorized representatives of the Parties, as Corporates/Firms/ Non- Governmental Organizations (NGOs) / Community Based Organizations (CBOs) /Educational Institutions. No unauthorized person shall be involved in the implementation of the project. Ensure that the earth excavated from the waterbody, as a part of the rejuvenation work, shall be exclusively used for the consolidation of the bunds, and shall not be used for any other purpose. The excess excavated clay, silt, savudu and gravel shall be given free of cost to the farmers for agriculture, public or domestic purpose and potters. The cost for this excess quantity should not be included in the cost of the works. The farmers shall arrange for removal and conveyance at their own cost as indicated in Appendix to G.O. (Ms.) No. 50, Industries (MMC.1) Department, Dated:27.04.2017 and this shall be under the monitoring of the District Collector. Hand over the water body to the department after completion of works without any damages to bund, appurtenances. To ensure that there is no reduction in the original size, extent, capacity of the water body. Ensure adherence to all applicable laws and regulations while implementing the Project. e Ensure that the work is undertaken as per the terms and conditions as specified by the Municipal Administration and Water Supply Department. 6. Monitoring and evaluation Regular monitoring and evaluation of rejuvenation activities will be conducted to assess progress towards achieving the objectives at ULB level. 7. Dispute Resolution Any dispute arising out of or in connection with this MoU shall be settled amicably through mutual consultation. In case of unresolved disputes, the matter shall be referred to arbitration to the Commissioner, Greater Chennai Corporation / Director of Municipal Administration /Director of Town Panchayats. The decision of the Commissioner, Greater Chennai Corporation / Director of Municipal Administration /Director of Town Panchayats shall be final and binding on both the parties. 8. Intellectual Property All intellectual property rights generated or developed during the Project shall be the property of the Municipal Administration and Water Supply Department unless otherwise agreed upon in writing. 9. Termination This MoU may be terminated by either party upon written notice, with 15 days’ notice period, to the other party, with or without cause, provided that such termination shall not affect any obligations already accrued hereunder. 10. Term and Renewal This MoU shall be valid for a period of 3 months from the date of execution. The MoU may be renewed for further periods subject to mutual agreement between the parties. 11. Entire Agreement & Work completion certificate This MoU constitutes the entire agreement between the parties with respect to the subject matter hereof and supersedes all prior or contemporaneous communications, representations, or agreements, whether oral or written. Work completion certificate (Annexure-III) is to be duly signed by Corporate/Firm/Non-Governmental Organizations (NGOs)/Community Based Organizations (CBOs) /Educational Institution, Municipal Engineer / Executive Engineer / Regional Executive Engineer /Chief Engineer of the ULB concerned prior to final payment. 12. Governing Law & Jurisdiction This MoU shall be governed by and construed in accordance with the laws of India. The parties agree to submit to the exclusive jurisdiction of the courts located in the . district for any dispute arising out of or in connection with this MoU. IN WITNESS WHEREOF, the parties hereto have executed this MoU as of the date first written above. FOR ULB, FOR [Name of Corporates/ Firms / Non-Governmental Organizations (NGOs)/ Community Based Organizations (CBOs)/ Educational Institutions] Authorized Signatory Authorized Signatory Name: Name: Designation: Designation: Witness: Witness: 1) 1) 2) 2) GAGANDEEP SINGH BEDI, ADDITIONAL CHIEF SECRETARY TO GOVERNMENT //TRUE COPY// Thee (Fis 1@a) sone & ‘ON OF R = q De ment, dated 16.10.202 WORK COMPLETION CERTIFICATE FOR CORPORATE/FIRM/NGO/ CBO/EDUCATIONAL INSTITUTION FUNDS. As per the memorandum of understanding (MoU) signed with the Assistant Commissioners/ Deputy Commissioners (in case of Greater Chennai Corporation), Commissioners/ Executive Officers (in case of Corporations/ Municipalities/Town Panchayats), Greater Chennai Corporation (Zone)/ Urban Local Body, Dated: i Name of the water body in Urban Local Body, (Habitation) has been rejuvenated by Corporates/Firms/ Non-Governmental Organizations (NGOs)/Community Based Organizations (CBOs) /Educational Institutions, (Unique Id No. ) in District, during the year at a total expenditure of Rs. , inclusive of the following items: 1. Earthwork in water spread area …. cum 2. Earth work of Inlet channel (length in m and quantity in cum) and outlet channel …. (Length in m and quantity in cum) 3. Bund strengthening …. (length in m and quantity in cum) 4. Repair/reconstruction of sluice/ weir …. (indicate the no. of sluices repaired/reconstructed and weir repaired/reconstructed) It is certified that all the above works have been completed as per approved Estimate, Standard specification and as per the conditions of the MoU signed. Representative of Corporate /|Municipal Engineer/Regional Firm/ Non-Governmental | Executive Engineer /Chief Organizations /Community Based | Engineer of Urban Local Bodies Organizations/ Educational | / Chief Engineer, Office of Institution Director of Municipal Administration/ Director of Town Panchayats/ Greater Chennai Corporation. GAGANDEEP SINGH BEDI, ADDITIONAL CHIEF SECRETARY TO GOVERNMENT //TRUE COPY//

Source: Government Orders published by the departments of the Government of Tamil Nadu on the official Government Orders site (cms.tn.gov.in). Order numbers, departments, titles and links are those of the official listing. Text read from the PDFs and arranged by tamilnadudata.org.

Data version 0e01b10c38a9

This site uses Google Analytics to count visits. It sets cookies and sends visit data to Google. We do not use it to identify individuals.