G.O.(Ms) No.182

All Government Orders

OrderG.O.(Ms) No.182
As listed on the official siteG.O.(Ms)No.182
DepartmentMunicipal Administration and Water Supply Department
Official titleAnnouncement – Implementation of ‘Chief Minister’s Integrated Urban Development Mission (CMIUDM) 2026–2031’ – Guidelines – Issued.
Listed on the official site12 October 2026
Pages36
Official PDFOpen the PDF on tn.gov.in

Text of the order

Read this first. This text was read from the PDF by computer, not typed by a person. Most Government Orders are scanned pages, so names, numbers, amounts and Tamil text can be read wrongly or left out. The official PDF is the authority: check anything you rely on against it.

Show the text (71,904 characters). Read from scanned pages by optical character recognition.
PDF page 1ABSTRACT Announcement – Implementation of ‘Chief Minister’s Integrated Urban Development Mission (CMIUDM) 2026-2031’ — Guidelines — Issued. MUNICIPAL ADMINISTRATION AND WATER SUPPLY (SS&FC) DEPARTMENT G.O.(Ms)No.182 Dated 12.10.2026 UMTUeY eight, ymt_LrAl 25 Alar epannasrG 2057 Read: From the Managing Director, Tamil Nadu Urban Finance and Infrastructure Development Corporation Limited (TUFIDCO), letter No. TUFIDCO/ CMIUTM/490/M(M)/2026, Dated 29.07.2026 & 02.09.2026 De ORDER: During the Revised Budget Speech 2026-27 by the Hon’ble Minister for Finance, Planning and Development, among others, it has been announced that the ‘Chief Minister’s Integrated Urban Development Mission (CMIUDM)’, will be launched bringing under one roof urban infrastructure, water supply, underground sewerage systems, integrated solid waste management, city roads, urban transport, expansion of green spaces, protection of urban water bodies, social infrastructure, the safety of women and children, Al-driven e-governance and a dedicated urban Public Health Improvement Mission, with the objective of addressing gaps in urban infrastructure and delivering a visibly better quality of life to every citizen of our urban local bodies. 2. In the letter read above, the Managing Director, Tamil Nadu Urban Finance and Infrastructure Development Corporation Limited, has furnished the draft Guidelines for ‘Chief Minister’s Integrated Urban Development Mission (CMIUDM) 2026-2031’ in consultation with concerned Heads of the Department. 3.The Government, after careful examination of the draft Guidelines sent by the Managing Director, Tamil Nadu Urban Finance and Infrastructure Development Corporation Limited, have decided to accept the same and approve the Guidelines as annexed to this order for the Implementation of ‘Chief Minister's Integrated Urban Development Mission (CMIUDM) 2026-2031’ ophs 4. This order issues with the concurrence of Finance Department vide its U.O.Note.efile/2875/Finance (Infra-III)/2026, dated 24.09.2026. (BY ORDER OF THE GOVERNOR) GAGANDEEP SINGH BEDI ADDITIONAL CHIEF SECRETARY TO GOVERNMENT To: The Managing Director, Tamil Nadu Urban Finance and Infrastructure Development Corporation Limited (TUFIDCO), Chennai-600 028. The Director of Municipal Administration, Chennai-600 028. The Secretary to Government (Expenditure), Finance Department, Chennai-600 009. The Managing Director, Chennai Metropolitan Water Supply and Sewerage Board Chennai-600 002. The Commissioner, Greater Chennai Corporation, Chennai-600 003. The Managing Director, Tamil Nadu Water Supply and Drainage Board, Chennai-600 005. The Director of Town Panchayats, Chennai-600 028. Copy to: The O/o. the Hon’ble Chief Minister, Chennai-600 009. The O/o. the Hon’ble Minister for Finance, Planning and Development, Chennai-600 009, The Senior Principal Private Secretary to the Additional Chief Secretary to Government, Municipal Administration and Water Supply Department, Chennai-600 009. The Senior Private Secretary to the Secretary to Government (Expenditure), Finance Department, Chennai-600 009. The Finance (Infra-lll/SFC) Department, Chennai-600 009. All Officers/Sections of Municipal Administration and Water Supply Department, Chennai-600 009. Stock File/Spare copy. / {FORWARDED BY ORDER // ab Rie Pee el Annexure to G.O.(Ms).No.182, Municipal inistratio! Water Supply (SS&FC) Departm 12.10 . GUIDELI' r IMPLEMENT: F CHIEF MINISTER'S INTEGRATED URBAN DEVELOPMENT MISSION (CM M 2026-2031 1 Introduction The CHIEF MINISTER’S INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM)2026-2031 is the overarching urban development initiative covering all Urban Local Bodies (ULBs) in Tamil Nadu, with an estimated investment of Rs.1.5 lakh crore over five years. The mission encompasses drinking water, underground sewerage, solid waste management, roads and transport, urban greening, waterbody restoration, social infrastructure, digital governance and public health infrastructure. 2 Eligible Towns: The scheme covers all Urban Local Bodies (ULBs) in Tamil Nadu 3 Objectives The CHIEF MINISTER'S INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) aims to provide integrated, sustainable, resilient and citizen-centric urban infrastructure across all Urban Local Bodies (ULBs) in Tamil Nadu through the coordinated implementation of various thematic sub-missions which will:- i. Ensure universal access to safe and reliable drinking water, sanitation, solid waste management, storm water drainage, roads, mobility, public health and other essential urban services. ii. Develop climate-resilient, environmentally sustainable and disaster- resilient urban infrastructure through nature-based and low-carbon solutions. iii. Rejuvenate urban water bodies, expand green and blue infrastructure, enhance biodiversity and improve ecological balance. iv. Strengthen urban mobility through safe, accessible, integrated and sustainable transportation systems for all users. v. Promote digital governance, data-driven decision-making, smart technologies and transparent municipal administration. vi. Improve public health, urban safety, social infrastructure and the overall liveability of cities, with special emphasis on women, children, senior citizens, and vulnerable communities. 1 vii. viii. Enhance the financial sustainability and institutional capacity of Urban Local Bodies through governance reforms, innovative financing mechanisms and efficient asset management. Foster citizen participation, accountability and service excellence in urban governance. Encourage economic growth, investment, innovation and employment by creating world-class urban infrastructure. Achieve balanced and integrated urban development aligned with the vision of Tamil Nadu Vision 2031 and the Sustainable Development Goals (SDGs). 4 Estimated Cost for the Sectors: = SUB- MISSIONS a 1 | CITY INFRASTRUCTURE DEVELOPMENT PLAN (CIDP) 50.00 2 | WATER SUPPLY 50,000.00 3 | UNDER GROUND SEWERAGE SCHEME 60,000.00 4 | INTEGRATED SOLID WASTE MANAGEMENT 3,000.00 5 | URBAN ROADS, MOBILITY & TRANSPORT 30,350.00 6 | URBAN GREENING, RECREATION & OPEN SPACES 2,000.00 7 | WATER BODIES DEVELOPMENT 2,000.00 8 | SOCIAL INFRASTRUCTURE 1,500.00 9 | SAFETY & SECURITY MISSION 500.00 10 | DIGITAL URBAN GOVERNANCE 300.00 11. | PUBLIC HEALTH MISSION 300.00 TOTAL 150,000.00 5 Allocation of Funds under CMIUDM 5.1 Allocation Principles The funds available under the CHIEF MINISTER'S INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) shall be allocated among the implementing agencies, namely the Greater Chennai Corporation (including CMWSSB), Other Municipal Corporations and Municipalities under the Directorate of Municipal Administration (DMA) and Town Panchayats under the Directorate of Town Panchayats (DTP). The allocation of funds shall be based on the following principles: i. 90% weightage shall be assigned to the projected urban population (2025) of the respective category of Urban Local Bodies. ii. 10% weightage shall be assigned to the geographical area (sq.km.) under the jurisdiction of the respective implementing agency. iii. The projected population shall be derived from the 2011 Census with suitable growth projections adopted by the Government. iv. The allocation shall be reviewed periodically by the Government based on changes in urban population, area, administrative jurisdiction and mission requirements. 5.2 Distribution of Mission Funds The indicative allocation of Mission funds among the implementing agencies shall be as follows Projected Area Allocation based on Implementing Population (Sa 90% Population + | Share Agency (2025) Pen ) 10% Area (Rs. (%) (Million) F Crore) Greater Chennai Corporation including 79.73 426 1163.35 19% CMWSSB Directorate of Municipal Administration 24 Corporations 132.11 2,139 2005.69 33% 146 Municipalities 84.47 2,644 1351.92 23% Di euarecem OMT OW TY 81.31| 5,832 1480.36 | 25% Panchayats Total 377.62| 11,017 6000.00 100 5.3 Flexibility in Allocation The above allocation shall serve as the broad distribution framework for implementation of CMIUDM. The Government may re-allocate or redistribute funds among the implementing agencies based on project readiness, utilisation of funds, performance, emerging infrastructure priorities or any other policy decision to ensure optimal utilisation of Mission resources. 6 Sub – Missions under CMIUDM: 6.1 City Infrastructure Development Plan (CIDP) 6.1.1 Purpose The City Infrastructure Development Plan (CIDP) shall be the primary strategic planning document for all cities with a population of more than one lakh under the CHIEF MINISTER'S INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM). The CIDP shall provide a comprehensive framework for planning, prioritising, financing and implementing urban infrastructure projects to achieve sustainable, resilient and inclusive urban development. 6.1.2 Objectives The CIDP shall: Assess the existing status of urban infrastructure and municipal services. Analyse demographic growth, economic activities, land use patterns, environmental conditions and future urbanisation trends. Identify infrastructure deficits, service-level gaps and investment requirements across all urban sectors. Prioritise projects based on service needs, growth potential, climate iv. resilience, financial viability and citizen requirements. v. Promote integrated planning across ail sectors covered under the eleven sub-missions of CMIUDM. vi. Provide a medium- to long-term investment roadmap for systematic urban infrastructure development. 6.1.3 Scope The CIDP shall cover all major urban infrastructure sectors, including: 2 li. iii. iv. Vv. vi. vii. vili. xi. Water Supply Sewerage and Sanitation Storm Water Drainage Solid Waste Management Urban Roads and Mobility Urban Water Bodies Green Spaces and Urban Environment Public Health Social Infrastructure Safety and Security Digital Urban Governance and Municipal Infrastructure 6.1.4 Planning Approach The CIDP shall adopt an integrated, evidence-based planning approach using reliable data, GIS mapping, infrastructure asset inventories, service-level benchmarks, population projections, climate risk assessments and stakeholder consultations. The plan shall ensure that infrastructure development is technically sound, financially sustainable, environmentally responsible and aligned with statutory master plans and development regulations. 6.1.5 Investment Planning and Convergence The CIDP shall serve as the principal investment planning document for cities. It shail identify sector-wise projects, implementation priorities, estimated costs and financing strategies. The Plan shall facilitate convergence of financial resources from Government of India schemes, State Government programmes, External Aided Projects (EAPs), multilateral funding agencies, municipal bonds, Public-Private Partnerships (PPPs), SFC/CFC grants, Urban Local Body resources and other eligible funding sources to maximise investment efficiency and avoid duplication. 6.1.6 Implementation and Review The CIDP shali be prepared by the Urban Local Body with the support of competent technical agencies and approved by the competent authority under CMIUDM. It shall be reviewed and updated periodically to reflect changing urban growth patterns, emerging infrastructure needs, technological advancements and policy priorities. 6.2 Sub Mission – Urban Water Supply 6.2.1 Objectives and Expected Outcomes The Water Supply Sub-Mission under the CHIEF MINISTER'S INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) aims to provide universal, safe, reliable, sustainable and equitable water supply to all Urban Local Bodies (ULBs) in Tamil Nadu. The Mission envisages: i. Universal household water supply coverage with reliable and equitable services. ii. 24×7 pressurised water supply in all Municipal Corporations through phased implementation. 5 Minimum 3 hours of assured daily water supply with prescribed quantity, quality and adequate pressure in Municipalities and Town Panchayats. Sustainable water source development, efficient distribution systems, reduction of Non-Revenue Water (NRW), universal metering, digital water management and climate-resilient infrastructure. Financially sustainable, climate-resilient and digitally enabled urban water utilities. 6.2.2 Eligible Project Components Projects may include one or more of the following components: viii. ix. x. xi. xii. Source augmentation and sustainability (surface water, groundwater recharge, desalination, treated wastewater reuse) Intake works, raw water pumping mains and transmission mains Water Treatment Plants (WTPs) Master Balancing Reservoirs (MBRs), Ground Level Service Reservoirs (GLSRs), Elevated Service Reservoirs (ESRs), Underground Tanks (UGTs) Distribution network strengthening, replacement and expansion Universal household service connections District Metered Areas (DMAs), pressure management and leak detection systems Consumer metering, bulk metering and smart metering SCADA, GIS mapping, automation and digital asset management Energy-efficient pumping systems with Variable Frequency Drives (VFDs) Water quality laboratories and online monitoring systems Five-year Operation & Maintenance (O&M) including capacity building 6.2.3 Selection Criteria – ULB Prioritisation Priority shall be accorded based on the following: i. ii. iii. iv. v. ULBs having inadequate water supply or intermittent supply Low household water supply coverage High Non-Revenue Water (NRW) Readiness of DPR, statutory approvals and land availability Financial sustainability and ULB commitment for O&M 6.2.4 Selection of Projects within ULBs Projects shall be identified based on comprehensive technical assessment considering: i. i. iii. iv. v. Water balance and demand-supply gap Source sustainability assessment Hydraulic modelling of the distribution network Existing infrastructure condition assessment Consumer coverage and unserved areas 6 vi. NRW assessment and leakage mapping vii. Water quality deficiencies viii. Service level benchmarks ix. Energy efficiency opportunities x. Cost-benefit analysis and lifecycle costs Priority shall be given to projects that maximize service coverage, improve system efficiency and achieve measurable service level improvements. 6.2.5 Implementation Requirements Every project shall include: i. Comprehensive DPR with hydraulic modelling li. Source sustainability and climate resilience assessment iii. GIS-based asset mapping iv. Universal metering strategy v. Five-year O&M contract vi. Performance monitoring through KPIs (coverage, LPCD, pressure, NRW, water quality and consumer satisfaction) 6.3 Sub Mission – Underground Sewerage 6.3.1 Objectives and Expected Outcomes The Underground Sewerage Sub-Mission under the CHIEF MINISTER'S INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) aims to provide safe, sustainable, inclusive and environmentally compliant sanitation services to all Urban Local Bodies (ULBs) in Tamil Nadu. The Mission envisages: i. 100% underground sewerage coverage in Municipal Corporations, ULBs with population above 1 lakh, District Headquarters, tourism-important towns and other priority urban centres. ii. Scientific Septage and Faecal Sludge Management (FSSM) systems in all remaining Municipalities and Town Panchayats within five years, with phased transition to underground sewerage wherever feasible. iii. Universal collection, conveyance, treatment, reuse of treated wastewater and environmentally safe disposal of sewage and sludge. iv. Elimination of untreated sewage discharge into water bodies through environmentally sustainable, financially viable and digitally managed urban sanitation systems. 6.3.2 Eligible Project Components Projects may include one or more of the following components: i. if. iii. iv. v. vi. vii. viii. ix. x. xi. xii. Underground sewerage network and house sewer connections Sewage pumping stations and rising mains Sewage Treatment Plants (STPs), Modular/Decentralized STPs and package treatment plants Rehabilitation and augmentation of existing sewerage systems Septage and Faecal Sludge Treatment Plants (FSTPs) Co-treatment facilities at STPs Public and community sewer connections in unserved areas Reuse infrastructure for treated wastewater (industrial, landscaping, agriculture and groundwater recharge) SCADA, automation, online monitoring and GIS-based sewer asset management Sewer cleaning equipment, inspection systems and maintenance machinery Sludge handling, dewatering and disposal facilities Operation & Maintenance (O&M) including capacity building 6.3.3 Selection Criteria — ULB Prioritisation Priority shall be accorded based on the following: vi. 6.3.4 Selection of Projects Within ULBs Projects shall be identified based on comprehensive technical assessment Municipal Corporations ULBs with population above 1 lakh District Headquarters Tourism-important towns Environmentally sensitive and polluted water body catchments ULBs with poor sanitation coverage and open discharge of sewage considering: vii. Existing sanitation coverage and service gaps including assessment of existing infrastructure condition. Population density and future growth Pollution of rivers, lakes and water bodies Potential for wastewater recycling and reuse Lifecycle cost and financial sustainability Availability of land for treatment facilities Compliance with environmental and pollution control norms Priority shall be given to projects that maximize sanitation coverage, improve environmental outcomes, increase wastewater reuse and achieve measurable service level improvements. 6.3.5 Implementation Requirements Every project shall include: i. Comprehensive DPR with hydraulic design ji. City Sanitation Plan/FSSM Plan iii. Environmental and climate resilience assessment iv. GIS-based sewer asset mapping v. Provision for 100% household sewer connections vi. O&M contract Performance monitoring through KPIs (coverage, collection efficiency, treatment efficiency, reuse, compliance with discharge standards and customer satisfaction) 6.4 Sub Mission – Integrated Solid Waste Management 6.4.1 Objectives and Expected Outcomes The Solid Waste Management (SWM) Sub-Mission under the CHIEF MINISTER'S INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM)aims to establish a sustainable, circular, climate-resilient and environmentally compliant solid waste management system in compliance with Solid Management Rules 2026 across all Urban Local Bodies (ULBs) in Tamil Nadu. The Mission envisages: i. 100% source segregation, door-to-door collection, scientific transportation, processing and disposal of municipal solid waste. ii. Maximization of resource recovery through Reduce, Reuse, Recycle (3R) principles, composting, bio-methanation, Material Recovery Facilities (MRFs), Waste-to-Energy (WtE) and scientific land filling. iii. Establishment of Waste-to-Energy facilities in Municipal Corporations, wherever technically and financially feasible. iv. Construction and Demolition (C&D) Waste Management Plants for recycling and reuse of construction waste. v. Scientific management of legacy waste and remediation of dumpsites. vi. Promotion of recycling, composting and circular economy practices to enhance resource recovery. vii. Development of clean, healthy, environmentally sustainable and digitally managed urban solid waste management systems across all ULBs. 6.4.2 Eligible Project Components Projects may include one or more of the following components: i. Door-to-door waste collection systems and source segregation infrastructure ii. Waste collection vehicles, transfer stations and transportation systems, Decentralized waste management system iii. | Material Recovery Facilities (MRFs) and Dry Waste Collection Centres iv. Compost plants, bio-methanation plants and organic waste processing facilities v. Waste-to-Energy (WtE) plants and Refuse Derived Fuel (RDF) facilities, wherever feasible vi. Scientific sanitary landfills for inert waste vii. Construction and Demolition (C&D) Waste Processing and Recycling Plants viii. Legacy waste bio-mining and dumpsite remediation ix. Plastic waste, e-waste, slaughter house waste processing and domestic hazardous waste collection systems x. Smart bins, GPS vehicle tracking, loT monitoring, GIS mapping and digital waste management systems xi. Operation & Maintenance (O&M) contracts 6.4.3 Selection Criteria — ULB Prioritisation Priority shall be accorded based on the following: i. Municipal Corporations and high waste-generating ULBs ii. ULBs with inadequate processing capacity iii. ULBs having legacy waste dumpsites iv. Tourism-important and environmentally sensitive urban areas v. ULBs requiring regional/common waste processing facilities vi. ULB's Compliance status with the Solid Waste Management Rules, 2026 vii. Potential for decentralized waste management wherever feasible viii. Coastal, riverine or ecologically sensitive locations vulnerable to open dumping impact (rivers, water bodies, wetlands) ix. Willingness to adopt PPP/private sector participation models x. ULBs bordering or feeding into inter-state/inter-district boundaries (waste migration issues) 6.4.4 Selection of Projects within ULBs Projects shall be identified based on comprehensive technical assessment considering: i. Existing collection efficiency and segregation levels ii. Processing capacity gap and future waste generation 10 iii. Vv. v. Availability of land for processing and disposal facilities Potential for composting, bio methanation, recycling and Waste-to-Energy Legacy waste remediation requirements Priority shall be given to projects that maximize waste processing, resource recovery, landfill diversion and environmental benefits. 6.4.5 Implementation Requirements Every project shall include: I ii. iii. iv. v. City Solid Waste Management Plan Waste characterization and quantity assessment GIS-based asset mapping and digital monitoring O&M contract Performance monitoring through KPIs (collection efficiency, source segregation, processing efficiency, landfill diversion, resource recovery and customer satisfaction) 6.5 Sub Mission -Urban Roads, Mobility and Transport 6.5.1 Objectives and Expected Outcomes The Urban Roads & Urban Transport Sub-Mission under the CHIEF MINISTER'S INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) aims to develop a safe, efficient, sustainable, climate-resilient and integrated urban mobility system across all Urban Local Bodies (ULBs) in Tamil Nadu. The Mission envisages: vi. Development and upgradation of urban road networks (within the ULB limit) with improved connectivity and resilience. Creation of safe, accessible and inclusive streets for pedestrians, cyclists, public transport users and persons with disabilities. Promotion of sustainable urban mobility through public transport, multimodal integration, intelligent traffic management, electric mobility and last-mile connectivity. Reduction in traffic congestion, travel time, road accidents and greenhouse gas emissions while supporting economic growth and quality of life. Elimination of accident black spots and strengthening of road safety measures. Development of efficient, inclusive and digitally managed urban transport systems that support sustainable economic growth. 6.5.2 Eligible Project Components Projects may include one or more of the following components: Construction, widening, strengthening and rehabilitation of urban roads 11 vi. vii. viii. xi. xii. xili. Junction improvements, grade separators, flyovers, road over bridges (ROBs), road under bridges (RUBs) and bridges, wherever justified Complete Streets development with footpaths, Cycle tracks, universal accessibility and streetscaping A Walking -catchment with footpath continuity ,refuge islands, safe crossings and last-mile connectivity etc., around transit nodes such as bus stands, railway stations and metro stations. New roads/ Scheme roads wherever feasible ,include utility ducts and raised machine-holes to avoid road cutting for future utility works. Road safety improvements including black spot rectification, traffic calming measures, signage, road markings and street lighting Bus priority corridors, bus shelters, bus terminals and multimodal transport hubs Intelligent Transport Systems (ITS), Adaptive Traffic Signal Control (ATCS), smart parking and traffic management systems Electric Vehicle (EV) charging infrastructure and supporting facilities Last-mile connectivity infrastructure including pedestrian links and non- motorised transport (NMT) facilities Climate-resilient road infrastructure with integrated stormwater drainage and flood mitigation measures Road asset management systems, GIS mapping and digital monitoring Operation & Maintenance (O&M) for eligible smart mobility systems 6.5.3 Selection Criteria – ULB Prioritisation Priority shall be accorded based on the following: Municipal Corporations and rapidly urbanising ULBs having high proportion of earthen roads. ULBs experiencing severe traffic congestion and road safety issues District Headquarters, industrial, commercial and tourism-important towns Connectivity to bus terminals, railway stations, metro stations, airports and major public institutions 6.5.4 Selection of Projects within ULBs Projects shail be identified based on comprehensive technical assessment considering: Urban Mobility Plan/Comprehensive Mobility Plan (CMP) Existing road network condition including roads damaged due to water supply/ UGSS or any other associated infrastructure works and traffic volume Congestion levels and travel time delays Transit -Node walkablity Road safety audits and accident black spots 2 vi. vii. viii. ix. xX. xi. New Storm water drains Pedestrian and cyclist demand Public transport accessibility and multimodal integration Storm water drainage deficiencies and climate resilience requirements Lifecycle cost, economic benefits and financial sustainability Utility coordination and land availability Priority shall be given to projects that improve connectivity, enhance road safety, strengthen public transport, promote non-motorised transport and maximize network efficiency. : 6.5.5 Implementation Requirements Every project shall include: i ii. iii. iv. v. Comprehensive DPR supported by traffic and road safety studies GIS-based road asset mapping Road Safety Audit by an independent agency Third-party quality assurance Performance monitoring through KPIs (road condition, travel time, congestion reduction, accident reduction, public transport accessibility and user satisfaction) 6.6 Sub – Mission -Urban Green, Recreation and Open Spaces 6.6.1 Objectives and Expected Outcomes The Urban Greening, Recreation & Open Spaces Sub-Mission under the CHIEF MINISTER'S INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) aims to create green, healthy, climate-resilient, inclusive and liveable urban environments across all Urban Local Bodies (ULBs) in Tamil Nadu. The Mission envisages: Development, restoration and maintenance of urban parks, playgrounds, green corridors, urban forests, waterfronts, biodiversity parks and public open spaces. City wide Greening plan to be prepared as part of CIDP, identifying priority corridors, species and layering. Plantation of 5 crore trees over five years across urban areas to increase green cover, improve air quality, enhance biodiversity, sequester carbon and mitigate urban heat island effects. Promotion of accessible and inclusive recreational spaces, ecological conservation, nature-based solutions and climate-resilient urban landscapes. Expansion of public open spaces and universal access to safe, well- maintained parks and recreational facilities. 13 vi. vii. Sustainable management of urban green assets through community participation, ecological restoration and digital monitoring. Creation of healthy, livable and climate-resilient cities with improved environmental quality and biodiversity. 6.6.2 Eligible Project Components Projects may include one or more of the following components: vi. vii. viii. xi. xii. Development and rejuvenation of urban parks, neighbourhood parks and children's parks including rain water harvesting facilities Development of playgrounds, sports parks and recreational open spaces Urban forests, Miyawaki forests and biodiversity parks Green corridors along roads, canals, rivers, railways and utility corridors Avenue plantation, median plantation and urban tree plantation programmes Lakefront, riverfront and waterfront landscaping integrated with ecological restoration Botanical gardens, butterfly parks and biodiversity conservation areas Open-air fitness facilities, walking tracks, cycling tracks and senior citizen parks Public plazas, community open spaces and inclusive recreational infrastructure Irrigation systems using treated wastewater, rainwater harvesting and smart landscape management GIS-based green asset inventory, tree census and digital monitoring systems Five-year Operation & Maintenance (O&M) including community participation 6.6.3 Selection Criteria – ULB Prioritisation Priority shall be accorded based on the following: i. i. iti. iv. v. vi. vil. viii. ULBs with low per capita green space High-density urban areas and heat island zones Environmentally sensitive and pollution-prone urban areas ULBs lacking parks, playgrounds and recreational facilities Riverfronts, lakefronts and degraded public open spaces requiring restoration Climate-vulnerable cities requiring nature-based solutions Cost – Effectiveness, Readiness of DPR, statutory approvals and land availability. Community participation and maintenance commitment 14 6.6.4 Selection of Projects within ULBs Projects shall be identified based on comprehensive technical assessment considering: i. Existing green cover and per capita open space ii. Availability and accessibility of public open spaces iii. Population density and recreational demand iv. Opportunities for urban afforestation and ecological restoration v. Integration with lakes, rivers, canals and stormwater systems vi. Lifecycle cost and long-term maintenance sustainability vii. Community participation and environmental benefits Priority shall be given to projects that maximize green cover, improve public accessibility, enhance biodiversity, strengthen climate resilience and provide measurable environmental and social benefits. 6.6.5 Implementation Requirements Every project shall include: i. Urban Green Space Development Plan or Landscape Master Plan ji. Tree plantation plan with survival and maintenance strategy iii. Climate resilience and biodiversity assessment iv. Universal accessibility for persons with disabilities v. GIS-based green asset mapping and tree inventory vi. Five-year O&M contract with survival guarantee for plantations vii. Third-party quality assurance viii. Performance monitoring through KPIs (green cover, tree survival rate, per capita open space, park accessibility, biodiversity enhancement and citizen satisfaction) 6.7 Sub – Mission -Urban Water Bodies Development 6.7.1 Objectives and Expected Outcomes The Urban Water Bodies Development Sub-Mission under the CHIEF MINISTER'S INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) aims to restore, conserve and sustainabiy manage urban water bodies across all Urban Local Bodies (ULBs) in Tamil Nadu. 15 The Mission envisages: vi. Restoration and rejuvenation of lakes, ponds, tanks, canals, rivers, wetlands and other urban water bodies through desilting, pollution abatement, ecological restoration and catchment protection. Priority rejuvenation of the Adyar River, Cooum River and Buckingham Canal in Chennai, and the Noyyal River in Coimbatore, along with other ecologically and socially significant urban water bodies. Enhancement of water quality, water security, groundwater recharge, flood resilience, biodiversity, climate adaptation and creation of accessible public waterfronts. Development of accessible, environmentally sustainable waterfronts and public spaces. Promotion of scientific management and community participation for the sustainable conservation of urban water ecosystems. Creation of climate-resilient urban water systems that support ecological health, environmental sustainability and improved quality of life. 6.7.2 Eligible Project Components Projects may include one or more of the following components: vi. vii. viii. Xi. xii. Desilting and restoration of lakes, ponds, tanks, canals, rivers and wetlands. Strengthening of bunds, embankments, retaining walls and erosion protection works. Restoration of inlets, outlets, surplus weirs and hydraulic structures. Removal of encroachments, invasive vegetation and solid waste (as per statutory procedures). Pollution abatement measures, interception, diversion and treatment of sewage and in-situ water quality improvement. Ecological restoration, wetland development, habitat improvement and biodiversity conservation. Catchment area treatment, storm water management and groundwater recharge structures. Lakefront, riverfront and canal-front development with public access, walking and cycling tracks, landscaping and recreational facilities. The project scope shall include the water body and its immediate frontage, including parking and pedestrian facilities along the access roads adjoining the water body. Water quality monitoring systems, IoT sensors, GIS mapping and digital asset management. Public awareness, community participation and capacity building. Operation & Maintenance (O&M) including ecological management. 16 6.7.3 Selection Criteria – ULB Prioritisation Priority shall be accorded based on the following: iii. vi. vii. viii. ULBs with degraded or polluted urban water bodies Water bodies contributing significantly to flood mitigation and groundwater recharge Environmentally sensitive and biodiversity-rich ecosystems Rivers, lakes and canals of regional or State importance Priority urban rivers including Adyar, Cooum, Buckingham Canal in Chennai and other major polluted river stretches in other ULBs. Water bodies supporting drinking water sources or urban resilience Readiness of DPR, statutory approvals and land availability Community participation and commitment for long-term maintenance 6.7.4 Selection of Projects within ULBs Projects shall be identified based on comprehensive technical assessment considering: vii. viii. Water bodies with deteriorated Ecological condition and water quality including mixing of sewer Extent of pollution and encroachments Storage capacity and groundwater recharge potential Flood mitigation and storm water management benefits Biodiversity conservation value Catchment characteristics and hydrological assessment Public accessibility and recreation potential Lifecycle cost and sustainability of interventions Integration with sewerage, storm water drainage and urban greening projects Priority shall be given to projects that maximize ecological restoration, improve water quality, enhance flood resilience, increase groundwater recharge and create sustainable public waterfronts. 6.7.5 Implementation Requirements Every project shall include: i. ii. iii. iv. Vv. vi. vii. Comprehensive DPR with hydrological and ecological assessment Water quality and pollution source assessment Catchment management and climate resilience plan Environmental and statutory clearances, wherever applicable GIS-based mapping and digital inventory of water bodies O&M and ecological maintenance plan Third-party quality assurance 17 viii. Performance monitoring through KPIs (water quality, storage capacity, groundwater recharge, biodiversity enhancement, flood mitigation and citizen satisfaction) 6.8 Sub -Mission – Social Infrastructure 6.8.1 Objectives and Expected Outcomes The Social Infrastructure Sub-Mission under the CHIEF MINISTER’S INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) aims to strengthen urban livability by providing inclusive, accessible, resilient, and future- ready social infrastructure across all Urban Local Bodies (ULBs) in Tamil Nadu. The Mission envisages: i. Development and modernization of schools, urban health and wellness centres, Anganwadis (Based on the Recommendation of Director, ICDS), community halis, Kalyana Mandapams, bus stands, markets, shandies, convention centres, digital libraries, skill development centres and other essential civic facilities. ii. Universal access to quality education, healthcare, social services, community spaces and livelihood infrastructure. iii. Creation of citizen-centric, climate-resilient, digitally enabled and universally accessible public facilities to improve quality of life and promote inclusive urban development. iv. Enhancement of livelihood opportunities through markets, _ skill development centres and community infrastructure. v. Strengthening of social inclusion, community engagement and access to essential urban services. vi. Promotion of sustainable socio-economic development and improved urban livability across all ULBs. 6.8.2 Eligible Project Components Projects may include one or more of the following components: i. Construction, modernization and expansion of Government schools and future-ready smart classrooms (Based on Student strength) ii. Urban Primary Health Centres (UPHCs), Health & Wellness Centres and public health infrastructure iii. Anganwadi centres, child development and nutrition facilities iv. Community halls, Kalyana Mandapams and multipurpose community centres* v. Bus stands, integrated bus terminals and passenger amenities vi. Municipal markets, shandies, fish markets and vending zones vii. Convention centres, exhibition halls and cultural infrastructure 18 vili. xi. xii. Digital libraries, knowledge centres and e-learning facilities Skill development, entrepreneurship and livelihood training centres Universal accessibility, green building features, solar power, rainwater harvesting and energy-efficient systems Smart building management systems, CCTV, Wi-Fi and digital service delivery infrastructure Five-year Operation & Maintenance (O&M) for eligible facilities * Note : Community halls, Kalyana Mandapams and convention centres may, in general, be better suited for development by the private sector wherever feasible. The involvement of ULBs may therefore be limited to areas having a significant Scheduled Caste and Scheduled Tribe population, where such facilities serve important welfare and social inclusion purposes. 6.8.3 Selection Criteria – ULB Prioritisation Priority shall be accorded based on the following: vi. vii. viii. ULBs with inadequate social infrastructure High population growth and underserved urban areas Economically weaker and socially vulnerable communities District Headquarters, Municipal Corporations and rapidly urbanising towns Areas lacking access to education, healthcare and community facilities Readiness of DPR, statutory approvals and land availability Financial sustainability and commitment for O&M Convergence with Central/State schemes and external funding 6.8.4 Selection of Projects Within ULBs Projects shall be identified based on comprehensive technical assessment considering: i. it. iii. iv. v. vi. vii. viii. ix. Existing infrastructure gaps and service coverage Population density and demographic characteristics Accessibility and equitable distribution of facilities Demand assessment for education, healthcare, markets and community infrastructure Structural condition of existing assets Universal accessibility requirements for persons with disabilities, women, children and senior citizens Climate resilience, energy efficiency and green building potential Lifecycle cost, financial sustainability and operational viability Scope for digital service delivery and smart infrastructure Priority shall be given to projects that maximize public service delivery, improve social inclusion, strengthen livelihood opportunities and enhance citizen well- being. 19 6.8.5 Implementation Requirements Every project shall include: i. ii. iii. iv. v. vi. vii. viii. Comprehensive DPR based on service demand assessment Universal accessibility compliant with applicable standards Green building and energy-efficient design features, wherever feasible Climate resilience and disaster safety measures Digital infrastructure for service delivery and facility management Five-year O&M plan for eligible facilities Third-party quality assurance Performance monitoring through KPIs (service coverage, facility utilization, accessibility, energy efficiency, user satisfaction and operational performance) 6.9 Sub – Mission: Safety and Security Mission 6.9.1 Objectives and Expected Outcomes The Safety & Security Sub-Mission under the CHIEF MINISTER’S INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) aims to create safe, secure, resilient and inclusive urban environments across all Urban Local Bodies (ULBs) in Tamil Nadu. The Mission envisages: vi. Strengthening urban safety through integrated surveillance systems, smart street lighting, emergency response infrastructure and intelligent public safety monitoring. Enhancing the safety of women, children, senior citizens, persons with disabilities and other vulnerable groups through technology-enabled solutions and safer public spaces. Improving disaster preparedness, emergency response, crime prevention and citizen confidence through integrated urban safety infrastructure. Expanding surveillance and smart street lighting coverage in priority areas to create safer and more secure public spaces. Reducing public safety risks and strengthening citizen confidence through resilient, digitally managed and citizen-centric urban safety systems. Promoting safer, more secure and disaster-resilient cities that improve quality of life across all ULBs. 6.9.2 Eligible Project Components Projects may include one or more of the following components: Integrated CCTV surveillance systems at public places, roads, parks, markets, bus stands and other critical infrastructure 20 vi. vil. viii. x. xi. Smart LED Street lighting with remote monitoring and adaptive lighting controls, including aesthetic / ornamental lighting component for public spaces, monuments, water fronts etc,. Emergency call boxes, panic buttons and public emergency communication systems Integrated City Safety Command and Control Centres or integration with existing ICCCs (Based on the necessity) Intelligent video analytics, Al-enabled surveillance and incident detection systems Public Address Systems (PAS) and emergency warning systems Disaster early warning systems for floods, cyclones, heatwaves and other urban hazards Smart traffic enforcement and road safety monitoring systems Safety infrastructure around schools, hospitals, transport hubs and public spaces Cyber-secure digital communication and monitoring platforms Five-year Operation & Maintenance (O&M) including software support and capacity building 6.9.3 Selection Criteria — ULB Prioritisation Priority shall be accorded based on the following: Iv. v. vi. vii. viil. Municipal Corporations and densely populated urban areas ULBs with higher incidence of road accidents, crime or public safety concerns Major transport hubs, markets, commercial districts and tourism- important towns Disaster-prone and climate-vulnerable urban areas Areas with inadequate street lighting and public safety infrastructure Readiness of DPR, statutory approvals and institutional coordination Financial sustainability and commitment for O&M Convergence with Central/State schemes and external funding 6.9.4 Selection of Projects Within ULBs Projects shall be identified based on comprehensive technical assessment considering: i li. iif. iv. ve vi. Crime and public safety assessment Road accident black spots and traffic safety studies Pedestrian movement and vulnerable user assessment Disaster risk and emergency response requirements Existing surveillance and street lighting coverage Safety needs of women, children, senior citizens and persons with disabilities 21 vii. Integration with Intelligent Traffic Management Systems (ITMS), Emergency Response Systems and Integrated Command and Control Centres (ICCCs) viii. Lifecycle cost, cybersecurity and operational sustainability ix. Coordination with Police, Fire & Rescue Services and Disaster Management Authorities Priority shall be given to projects that improve public safety, strengthen emergency response, enhance disaster resilience and maximize citizen confidence. 6.9.5 Implementation Requirements Every project shall include: i. Comprehensive DPR with safety and security assessment ii. Cybersecurity and data privacy compliance plan iii. Integration with existing ICCCs, emergency response and disaster management systems iv. Universal accessibility and inclusive public safety design v. GIS-based asset mapping and digital monitoring vi. Five-year O&M contract including software updates and maintenance vii. Third-party quality assurance viii. Performance monitoring through KPIs (crime reduction, street lighting coverage, emergency response time, surveillance uptime, road safety improvements and citizen satisfaction) 6.10 Sub – Mission:Digital Urban Governance 6.10.1 Objectives and Expected Outcomes The Digital Urban Governance Sub-Mission under the CHIEF MINISTER'S INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) aims to transform Urban Local Bodies (ULBs) into smart, efficient, transparent, data- driven and citizen-centric institutions through digital governance and emerging technologies. The Mission envisages: i. Creation of a comprehensive digital asset register for alt municipal infrastructure and public assets. ii. Implementation of Al-enabled Urban Transformation Information System (UTIS 2.0) for integrated urban planning, project monitoring, financial management and decision support. iii. Provision of 100% end-to-end online municipal and citizen services, including a Unique Digital Property Identification (UDPI) system for every property. 22 vi. Real-time monitoring of infrastructure projects, Government schemes, municipal finances, service delivery and urban assets through integrated dashboards and command platforms. Enhancement of governance efficiency, transparency, municipal revenue mobilization and data-driven urban management. Development of fully digital, transparent and citizen-centric Urban Local Bodies (ULBs). 6.10.2 Eligible Project Components Projects may include one or more of the following components: vi. vii. viii. xii. xiii. Al-enabled Urban Transformation Information System (UTIS 2.0) Comprehensive Digital Asset Register covering all municipal infrastructure and public assets* GIS-based property mapping and Unique Digital Property Identification (UDPI) system End-to-end online municipal services, citizen service portals and mobile applications Integrated municipal ERP covering finance, taxation, engineering, accounts, HR, procurement and asset management Project Monitoring Information System (PMIS) with real-time dashboards Integrated data platform with APIs for interoperability across Government departments IoT-based monitoring of water supply, sewerage, solid waste, street lighting, roads and public infrastructure Integrated Command and Control Centre (ICCC) support systems, where applicable Cloud infrastructure, cybersecurity, disaster recovery and data backup systems Digital document management, e-office, digital signatures and workflow automation Capacity building, digital! literacy and change management Five-year Operation & Maintenance (O&M), software support and system upgrades *Note : The digital asset register is proposed to be rollout within six months from the launch of scheme guidelines. A check shall be made against the Asset Register of Existing Underutilised Assets to ensure that there is no duplication with the proposed projects before the proposals are placed before the CPSMC for sanction. 6.10.3 Selection Criteria – ULB Prioritisation Priority shall be accorded based on the following: Municipal Corporations and high-growth urban centres ULBs with low levels of digital governance and service delivery 23 iii. iv. v. vi. vii. viii. ULBs requiring digital asset management and GIS-based property mapping ULBs_ with significant infrastructure investment requiring project monitoring Readiness of digital infrastructure, DPR and institutional capacity Financial sustainability and commitment for system maintenance Potential for improving municipal revenues, transparency and citizen services Convergence with Central/State digital initiatives and external funding 6.10.4 Selection of Projects Within ULBs Projects shall be identified based on comprehensive technical assessment considering: 1 ii. iii. iv. Vv. vi. vii. viii. ix. Existing level of digital governance and IT infrastructure Availability and quality of municipal data Gaps in online citizen service delivery Asset inventory and GIS mapping requirements Municipal financial management and revenue enhancement needs Scope for AI, automation and data-driven decision-making Cybersecurity, interoperability and data governance requirements Lifecycle cost and operational sustainability Integration with State and National digital platforms Priority shall be given to projects that improve governance efficiency, enhance transparency, increase municipal revenues, strengthen asset management and deliver seamless citizen services. 6.10.5 Implementation Requirements Every project shall include: i. ii. iti. iv. ve vi. vii. viii. ix. Comprehensive Digital Transformation Plan and DPR Enterprise Architecture and interoperability framework GIS-based municipal asset mapping and digital inventory Cybersecurity, privacy and disaster recovery plan Adoption of open standards and API-based integration Capacity building and change management programme Five-year O&M contract including software support and upgrades Third-party quality assurance Performance monitoring through KPIs (online service delivery, transaction time, municipal revenue improvement, asset coverage, citizen satisfaction, system uptime and digital adoption) 24 6.11 Sub – Mission: Public Health Mission 6.11.1 Objectives and Expected Outcomes The Public Health Sub-Mission under the CHIEF MINISTER'S INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) aims to strengthen urban public health systems, improve environmenta! health and enhance the livability of cities across all Urban Local Bodies (ULBs) in Tamil Nadu. The Mission envisages: vi. vii. Establishment of Animal Birth Control (ABC) Centres in all ULBs through dedicated, access-based or cluster-based models depending on population, demand and geographical coverage. Development of dedicated ABC Centres in Municipal Corporations and larger Municipalities, while smaller ULBs shall be served through shared regional facilities. Promotion of humane stray animal management through sterilization, anti-rabies vaccination, adoption programmes and animal welfare measures. Strengthening of vector control, zoonotic disease surveillance, environmental sanitation, public health monitoring and digital health management systems to improve urban health and livability. Reduction in rabies, vector-borne and zoonotic diseases through preventive health measures and technology-enabled monitoring. Improvement of public health, animal welfare, urban livability and environmental health outcomes. Creation of cleaner, healthier, safer and more resilient urban communities across Tamil Nadu. 6.11.2 Eligible Project Components Projects may include one or more of the following components: vii. viii. Construction, modernization and expansion of Animal Birth Control (ABC) Centres Cluster-based and regional ABC facilities for groups of smaller ULBs Animal shelters, quarantine facilities and post-operative care units Sterilization facilities, operation theatres and veterinary equipment Anti-rabies vaccination programmes and animal identification systems Dog catching vehicles, animal ambulances and specialised operational equipment Vector control infrastructure including fogging equipment, larvicide application systems and mosquito surveillance Public health laboratories and disease surveillance systems Digital public health monitoring platforms, GIS-based disease mapping and mobile applications 25 x. IEC programmes on public health, responsible pet ownership and animal welfare xi. Capacity building and training of municipal public health personnel xii. Five-year Operation & Maintenance (O&M) for eligible facilities 6.11.3 Selection Criteria – ULB Prioritisation Priority shall be accorded based on the following: i. Municipal Corporations and larger Municipalities with high stray animal populations ii. ULBs reporting higher incidences of rabies, vector-borne diseases or public health concerns ili. Regional clusters of smaller ULBs requiring shared ABC facilities — in coordination with Animal Husbandry department. iv. Tourism-important and densely populated urban centres v. ULBs lacking public health and ABC infrastructure vi. Readiness of DPR, statutory approvals and land availability vii. Commitment for O&M and trained personnel vii. Convergence with Central/State programmes and external funding 6.11.4 Selection of Projects within ULBs Projects shall be identified based on comprehensive technical assessment considering: i. Stray animal population and sterilization requirements ii. Coverage gaps in anti-rabies vaccination iii. Incidence of vector-borne and zoonotic diseases iv. Population density and public health risk assessment v. Accessibility to regional ABC facilities vi. Existing public health infrastructure and service gaps vii. Digital monitoring and surveillance requirements viii. Lifecycle cost and operational sustainability ix. Compliance with animal welfare and environmental regulations Priority shall be given to projects that maximize disease prevention, improve public health outcomes, enhance animal welfare and support healthier, safer and more livable urban environments. 6.11.5 Implementation Requirements Every project shall include: i. Comprehensive DPR based on public health and animal population assessment ii. Compliance with applicable Animal Birth Control Rules and public health guidelines iii. Digital monitoring system for ABC operations, vaccination and disease surveillance 26 iv. GIS-based mapping of public health assets and service coverage v. Capacity building for municipal public health and veterinary personnel vi. Five-year O&M plan for eligible facilities vii. Third-party quality assurance viii. Performance monitoring through KPIs (sterilization coverage, anti-rabies vaccination coverage, reduction in stray animal population growth, vector control effectiveness, disease incidence and citizen satisfaction) 7 Implementation Plan & City Infrastructure Development Plan (CIDP) The CMIUDM guidelines mandate preparation of a City Infrastructure Development Plan (CIDP) as the principal planning document for infrastructure development, investment prioritization, reforms and implementation for the ULBs having population of 1 lakh and above. 8 Fund Allocation and Funding Pattern The CMIUDM 2026-2031 envisages total investments of Rs.1.50 lakh crore for transforming urban infrastructure and service delivery across Tamil Nadu.The projects shall be implemented by leveraging a convergence of financial resources from multiple sources, including Government of India schemes, Government of Tamil Nadu programmes, TUFIDCO/TNUIFSL assistance, External Aided Projects (such as the World Bank, ADB, JICA, KfW and other funding agencies), Finance Commission Grants, Urban Local Body own resources and user charges, Corporate Social Responsibility (CSR) contributions and Public-Private Partnership (PPP) models, wherever feasible and applicable to the respective sector. The funding pattern for individual projects will be determined by the Common Project Sanctioning and Monitoring Committee (CPSMC) based on project characteristics, sectoral priorities, financial viability and the guidelines issued under the Mission. (i) Revenue-generating projects such as Bus Stands, Markets, Commercial Complexes, Kalyana Mandapams and other similar remunerative projects shall ordinarily be financed under a 60:40 funding pattern, with 60% of the project cost provided as Government Grant and the remaining 40%* contributed by the respective Urban Local Body. 27 However, in the case of financially weaker Urban Local Bodies, such projects may be financed under an 80:20 funding pattern, with 80% Government Grant and 20% ULB contribution, as may be approved by the Government, to facilitate the creation of revenue-generating assets and strengthen the financial sustainability of such ULBs. *Note : For revenue-earning assets, PPP/private-sector participation and VGF support shall be explored first, and grant funding shall be considered only where PPP is not feasible, (ii) Projects relating to roads, parks, crematoriums, water supply, underground sewerage, street lighting and other essential civic infrastructure shall ordinarily be financed under a 90:10 funding pattern, with 90% of the project cost provided as Government Grant and the remaining 10% contributed by the respective Urban Local Body. In exceptional cases, based on the nature, importance or public necessity of the project, the Committee may recommend a different funding pattern, which shall be considered on its merits. [__ SOURCE OF FUNDS aa SUB- MISSIONS Amount (Rs. Crore) 1. | Urban Challenge Fund Programme (Gol) 30000 2. | Central Finance Grants (Expected) 25000 3. | State Finance Commission (SFC) Grants 10000 4. | Municipal Bonds 2000 5. | General Fund of ULBs 5000 6. | EAP – ADB, World Bank, JICA Etc., 15000 7. | PPP T5000 8. | UIDF – NHB 5000 9. | State Budget 43000 Total 150000 9 Negative List (Projects Not Eligible) The following shall not be eligible for funding: i. Routine maintenance and O&M beyond the approved project period. ii. Replacement of functional assets without technical justification. iti. Land acquisition and compensation. iv. Administrative buildings, staff quarters, office infrastructure and general office equipment. v. Duplicate funding under any other Government scheme. 28 vi. vii. viii. xi. xii. Projects tacking statutory approvals, DPR/technical justification or prescribed environmental and safety standards. Projects without essential service components or sustainable arrangements. Beautification or commercial works unrelated to project objectives. Duplication of existing infrastructure of the same asset class in the same ULB, unless cleared against the asset mapping check recommended at point 5 above. Grant funding for revenue-generating assets above a stated cost threshold without a completed PPP or VGF assessment. Works where the ULB's matching share is not certified against verified capacity. Splitting of a single infrastructure package into multiple smaller DPRs. 9.1 Sector-Specific Exclusions i. ii. vi. vii. viii. Water Supply: Projects without a sustainable water source. Underground Sewerage: Conventional septic tanks, stand-alone public toilets, storm water drain desilting. Solid Waste Management: Open dumping, unscientific landfills, non- compliant incinerators, projects without segregation/processing. Urban Roads & Mobility: Works reducing pedestrian safety, commercial parking facilities. Urban Green Spaces: Ecological degradation, removal of healthy trees, restricted-access facilities. Water Bodies: Commercial development within water bodies, reduction of storage capacity, activities causing environmental degradation. Safety & Security: Arms and ammunition, police stations, surveillance without cyber security safeguards. Digital Governance: Stand-alone software, duplicate applications, proprietary non-interoperable systems. Public Health: Routine veterinary operations, unauthorized culling of stray animals, non-compliant facilities. DPR Preparation and Project Development Funding i. The Detailed Project Reports (DPRs) for the pipeline of projects proposed under the Mission shall, wherever applicable, be prepared utilizing the Project Development and Grant Fund (PDGF) available with TNUIFSL, subject to the applicable guidelines and approval of the competent authority. For small-value projects, the cost of preparation of DPRs and related project development activities shall generally be borne by the concerned ULB, unless otherwise approved by the Government/CPSMC. 29 In the case of projects taken up under Government of India-sponsored programmes, the Administrative and Other Expenditure (AOE) funds available under the respective Government of India programme may be utilized for preparation of DPRs and other eligible project development activities, subject to the provisions of the concerned programme guidelines. 10 Institutional Mechanism The implementation of CMIUDM shall be governed through institutional framework anchored by the Common Project Sanctioning and Monitoring Committee (CPS&MC), with TUFIDCO serving as the Nodal Agency and Fund Management Agency. 10.1 Common Project Sanctioning and Monitoring Committee (CPS&MC) The CPS&MC shall be constituted as follows: Member Designation Additional Chief Secretary MA&WS Department Chairman Commissioner, Greater Chennai Corporation Member Managing Director, CMWSSB Member Managing Director, TWAD Board Member Secretary (Expenditure), Finance Department or nominee Member Director of Municipal Administration Member Director of Town Panchayats Member Managing Director, TUFIDCO Convener Note : The Nodal Agency/Implementing Department concerned responsible for the scheme or category of project shall act as the Convener of the CPSMC. 10.2 Functions of CPS&MC The CPS&MC shall be responsible for: Approve City Infrastructure Development Plans (CIDPs), Urban Development Plans and sector-specific investment proposals prepared under the Mission. Identify, prioritize and recommend projects for funding based on infrastructure requirements, service level gaps, population coverage, environmental outcomes, economic impact and overall urban development priorities. Prescribe eligibility conditions, appraisal ec evaluation criteria and project selection frameworks. Sanction projects for implementation under the Mission. 30 vi. vii. viii. Approve expenditure related to project preparation, Detailed Project Reports (DPRs), technical assistance, consultancy services, capacity building and other mission support activities. Determine the pattern of assistance, funding structure, financing arrangements and resource mobilization strategy for approved projects. Approve fund release procedures, implementation schedules and financial management mechanisms. Review, monitor and evaluate the physical and financial progress of projects and oversee the overall implementation of the Mission. Note: For Madurai and Coimbatore Corporations, the Director of Municipal Administration and for Chennai, the Commissioner of GCC may accord administrative sanction for projects up to Rs.i0 crore, subject to the project being included in the CIDP approved by the CPSMC and the digital asset register being in place. 11 Role of the Nodal Agency The Nodal Agency and Fund Management Agency for CMIUDM shall perform the following functions: 1 ii. iii. iv. Vv. vi. vii. Invite, receive and process project proposals from implementing agencies. Undertake technical, financial and institutional appraisal of projects. Place eligible proposals before the CPSMC for consideration and approval. Manage mission funds and coordinate fund disbursements. Monitor project implementation and outcomes through digital monitoring systems. Facilitate inter-departmental coordination and resolve implementation bottlenecks. Maintain the Mission Management Unit and provide overall programme management support. This institutional framework shall ensure transparent decision-making, efficient fund management, effective project monitoring and timely implementation of urban infrastructure investments under CMIUDM. Management Fee and Programme Management Unit The Nodal Agency responsible for the appraisal of the project shall be eligible for a management fee of 0.05% of the approved project cost, or such other rate as may be prescribed by the Government, towards meeting the administrative and operational costs associated with project appraisal, processing, monitoring and related Mission activities. The concerned Nodal Agency may establish or engage a Programme Management Unit (PMU), wherever considered necessary, to augment its institutional and technical capacity for appraisal, evaluation, monitoring and implementation support of projects under the Mission. 31 The selection of the PMU and its members shall be subject to the approval of the CPSMC. The proposal for constitution/engagement of the PMU shail clearly indicate the proposed composition, qualifications, roles and responsibilities, tenure and financial implications. The composition, functions, staffing, engagement and expenditure of the PMU shall be determined based on the requirements of the concerned Nodal Agency and shall be within the management fee or such financial limits as may be approved by the Government/CPSMC. Where more than one Nodal Agency is involved in the appraisal of a project, the management fee and its sharing, if applicable, shall be determined in accordance with the roles and responsibilities assigned to each agency and as approved by the CPSMC. 12 Procedure for Project Sanction and Fund Disbursement Projects under CMIUDM shall follow a structured appraisal, approval and fund release process to ensure transparency, accountability, and timely implementation. Pn Step Action i. | Submission of The implementing agency shail submit the Detailed Proposal Project Report (DPR) through the concerned Head of Department (HoD) to the Nodal Agency, TUFIDCO. 2. | Appraisal The Nodal Agency shall undertake technical, financial, environmental and institutional appraisal of the proposal and assess its conformity with Mission guidelines and sectoral priorities. | 3. | Recommendation by |The Common Project Sanctioning and Monitoring CPSMC Committee (CPSMC) shall examine the proposal, approve the project for Mission funding, determine the funding pattern, and recommend it for Administrative Sanction. 4, | Administrative Based on the recommendation of the CPSMC, the Sanction by Government shall issue Administrative Sanction for the Government project and authorize fund allocation under the Mission. 5, | Fund Release Funds shall be released by the Nodal Agency through SNA or any other mechanism to the implementing agency in accordance with the funding pattern and release conditions approved by the Government and CPSMC. 6. | Monitoring and The implementing agency shall submit periodic progress Completion reports, utilization certificates and completion reports for review and monitoring by the Nodal Agency and the CPSMC. 32 12.1 Fund Release Pattern The funds allocated under the CMIUDM shall be released through a dedicated Single Nodal Agency (SNA) account to the concerned Implementing Agency/Urban Local Body (ULB), as applicable unless otherwise approved by the CPSMC, the funds under the Mission shall generally be released through the dedicated SNA account in the following manner: 90% of the approved Mission assistance shall be set as a limit in the SNA account after issue of Administrative Sanction by the Government through the State Nodal Agency. The limit so set shall enable drawal of funds in accordance with the approved project, subject to the prescribed conditions and the actual implementation requirements. The balance 10% of the approved Mission assistance shall be set as an additional limit only upon satisfactory completion of the project and submission of the Completion Certificate, Utilization Certificate and other prescribed documents by the concerned Head of Department/Implementing Agency. 13 Miscellaneous Provisions als All projects undertaken under CMIUDM may, wherever feasible, be tendered with a five-year comprehensive operation and maintenance period to ensure sustainability, quality service delivery and asset longevity. . Public-Private Partnerships (PPP) shall be encouraged in suitable sectors and projects to leverage private sector expertise, innovation and investment. . In respect of road infrastructure projects, priority shall be accorded to bus route roads, major arterial roads and other critical urban transport corridors. Design and construction standards prescribed by the Ministry of Road Transport and Highways (MoRTH) may be adopted wherever applicable. . For lanes and streets with carriageway widths less than 3.5 metres (or total road width below 4 metres), road improvement works may be undertaken using interlocking paver blocks or other suitable technologies. . All infrastructure projects shall be planned and executed in an integrated manner, incorporating end-to-end road connectivity, storm water drainage, street lighting, pedestrian facilities, utility corridors, road furniture and other essential urban infrastructure components. . All projects undertaken under CMIUDM shall incorporate climate-resilient and disaster-resilient planning, design, construction and asset management practices to enhance the resilience of urban infrastructure against climate and natural hazards. 33 7. All assets created under the Mission shall be geo-tagged and integrated into a GIS-based digital asset register to facilitate asset inventory management, lifecycle monitoring, maintenance planning and informed decision-making. 8. All projects sanctioned under CMIUDM shall be monitored through UTIS 2.0 or any other Government-approved digital platform to enable real- time tracking of physical and financial progress, project outcomes and service delivery performance. 9. The Common Project Sanctioning and Monitoring Committee (CPSMC) may issue additional operational guidelines, standards and implementation procedures from time to time for the -effective implementation of the Mission. 14 Monitoring Framework To ensure effective monitoring and timely implementation of projects, a District Monitoring Committee (DMC) shall be constituted in each district under the chairmanship of the District Collector. The Committee shall comprise representatives of Urban Local Bodies, including Commissioners, Executive Officers and concerned technical officials. The DMC shall review the physical and financial progress of projects, resolve implementation issues and monitor compliance with Mission guidelines on a monthly basis. Project progress shall also be monitored through digital dashboards and periodic reviews at the State level. 15 Power to Modify Guidelines The Additional Chief Secretary to Government, Municipal Administration and Water Supply Department, is empowered to issue clarifications, operational instructions and amendments to these guidelines, and to modify any provisions of the CMIUDM Guidelines, whenever considered necessary for effective implementation of the Mission, in consultation with the departments concerned. KRKKK GAGANDEEP SINGH BEDI ADDITIONAL CHIEF SECRETARY TO GOVERNMENT / {TRUE COPY// \| ‘ wonel.s\a gm sgeeE ION OFFICER Sains & iv! &

Source: Government Orders published by the departments of the Government of Tamil Nadu on the official Government Orders site (cms.tn.gov.in). Order numbers, departments, titles and links are those of the official listing. Text read from the PDFs and arranged by tamilnadudata.org.

Data version 37e36789e8bc

This site uses Google Analytics to count visits. It sets cookies and sends visit data to Google. We do not use it to identify individuals.