| Order | G.O.(Ms) No.182 |
|---|---|
| As listed on the official site | G.O.(Ms)No.182 |
| Department | Municipal Administration and Water Supply Department |
| Official title | Announcement – Implementation of ‘Chief Minister’s Integrated Urban Development Mission (CMIUDM) 2026–2031’ – Guidelines – Issued. |
| Listed on the official site | 12 October 2026 |
| Pages | 36 |
| Official PDF | Open the PDF on tn.gov.in |
Text of the order
Read this first. This text was read from the PDF by computer, not typed by a person. Most Government Orders are scanned pages, so names, numbers, amounts and Tamil text can be read wrongly or left out. The official PDF is the authority: check anything you rely on against it.
Show the text (71,904 characters). Read from scanned pages by optical character recognition.
PDF page 1ABSTRACT
Announcement – Implementation of ‘Chief Minister’s Integrated Urban
Development Mission (CMIUDM) 2026-2031’ — Guidelines — Issued.
MUNICIPAL ADMINISTRATION AND WATER SUPPLY (SS&FC) DEPARTMENT
G.O.(Ms)No.182 Dated 12.10.2026
UMTUeY eight, ymt_LrAl 25
Alar epannasrG 2057
Read:
From the Managing Director, Tamil Nadu Urban Finance and
Infrastructure Development Corporation Limited (TUFIDCO),
letter No. TUFIDCO/ CMIUTM/490/M(M)/2026, Dated 29.07.2026 &
02.09.2026
De
ORDER:
During the Revised Budget Speech 2026-27 by the Hon’ble Minister
for Finance, Planning and Development, among others, it has been
announced that the ‘Chief Minister’s Integrated Urban Development Mission
(CMIUDM)’, will be launched bringing under one roof urban infrastructure,
water supply, underground sewerage systems, integrated solid waste
management, city roads, urban transport, expansion of green spaces,
protection of urban water bodies, social infrastructure, the safety of women
and children, Al-driven e-governance and a dedicated urban Public Health
Improvement Mission, with the objective of addressing gaps in urban
infrastructure and delivering a visibly better quality of life to every citizen
of our urban local bodies.
2. In the letter read above, the Managing Director, Tamil Nadu Urban
Finance and Infrastructure Development Corporation Limited, has furnished
the draft Guidelines for ‘Chief Minister’s Integrated Urban Development
Mission (CMIUDM) 2026-2031’ in consultation with concerned Heads of the
Department.
3.The Government, after careful examination of the draft Guidelines
sent by the Managing Director, Tamil Nadu Urban Finance and
Infrastructure Development Corporation Limited, have decided to accept
the same and approve the Guidelines as annexed to this order for the
Implementation of ‘Chief Minister's Integrated Urban Development Mission
(CMIUDM) 2026-2031’
ophs
4. This order issues with the concurrence of Finance Department vide
its U.O.Note.efile/2875/Finance (Infra-III)/2026, dated 24.09.2026.
(BY ORDER OF THE GOVERNOR)
GAGANDEEP SINGH BEDI
ADDITIONAL CHIEF SECRETARY TO GOVERNMENT
To:
The Managing Director,
Tamil Nadu Urban Finance and Infrastructure Development
Corporation Limited (TUFIDCO), Chennai-600 028.
The Director of Municipal Administration,
Chennai-600 028.
The Secretary to Government (Expenditure), Finance Department,
Chennai-600 009.
The Managing Director,
Chennai Metropolitan Water Supply and Sewerage Board
Chennai-600 002.
The Commissioner, Greater Chennai Corporation,
Chennai-600 003.
The Managing Director,
Tamil Nadu Water Supply and Drainage Board,
Chennai-600 005.
The Director of Town Panchayats,
Chennai-600 028.
Copy to:
The O/o. the Hon’ble Chief Minister, Chennai-600 009.
The O/o. the Hon’ble Minister for Finance, Planning and Development,
Chennai-600 009,
The Senior Principal Private Secretary to the Additional Chief Secretary to
Government, Municipal Administration and Water Supply Department,
Chennai-600 009.
The Senior Private Secretary to the Secretary to Government (Expenditure),
Finance Department, Chennai-600 009.
The Finance (Infra-lll/SFC) Department, Chennai-600 009.
All Officers/Sections of Municipal Administration and Water Supply
Department, Chennai-600 009.
Stock File/Spare copy.
/ {FORWARDED BY ORDER //
ab
Rie
Pee
el
Annexure to G.O.(Ms).No.182, Municipal inistratio!
Water Supply (SS&FC) Departm 12.10 .
GUIDELI' r IMPLEMENT: F CHIEF MINISTER'S
INTEGRATED URBAN DEVELOPMENT MISSION (CM M
2026-2031
1 Introduction
The CHIEF MINISTER’S INTEGRATED URBAN DEVELOPMENT MISSION
(CMIUDM)2026-2031 is the overarching urban development initiative
covering all Urban Local Bodies (ULBs) in Tamil Nadu, with an estimated
investment of Rs.1.5 lakh crore over five years. The mission encompasses
drinking water, underground sewerage, solid waste management, roads and
transport, urban greening, waterbody restoration, social infrastructure, digital
governance and public health infrastructure.
2 Eligible Towns:
The scheme covers all Urban Local Bodies (ULBs) in Tamil Nadu
3 Objectives
The CHIEF MINISTER'S INTEGRATED URBAN DEVELOPMENT MISSION
(CMIUDM) aims to provide integrated, sustainable, resilient and citizen-centric
urban infrastructure across all Urban Local Bodies (ULBs) in Tamil Nadu through
the coordinated implementation of various thematic sub-missions which will:-
i. Ensure universal access to safe and reliable drinking water, sanitation,
solid waste management, storm water drainage, roads, mobility, public
health and other essential urban services.
ii. Develop climate-resilient, environmentally sustainable and disaster-
resilient urban infrastructure through nature-based and low-carbon
solutions.
iii. Rejuvenate urban water bodies, expand green and blue infrastructure,
enhance biodiversity and improve ecological balance.
iv. Strengthen urban mobility through safe, accessible, integrated and
sustainable transportation systems for all users.
v. Promote digital governance, data-driven decision-making, smart
technologies and transparent municipal administration.
vi. Improve public health, urban safety, social infrastructure and the overall
liveability of cities, with special emphasis on women, children, senior
citizens, and vulnerable communities.
1
vii.
viii.
Enhance the financial sustainability and institutional capacity of Urban
Local Bodies through governance reforms, innovative financing
mechanisms and efficient asset management.
Foster citizen participation, accountability and service excellence in urban
governance.
Encourage economic growth, investment, innovation and employment by
creating world-class urban infrastructure.
Achieve balanced and integrated urban development aligned with the
vision of Tamil Nadu Vision 2031 and the Sustainable Development Goals
(SDGs).
4 Estimated Cost for the Sectors:
= SUB- MISSIONS a
1 | CITY INFRASTRUCTURE DEVELOPMENT PLAN (CIDP) 50.00
2 | WATER SUPPLY 50,000.00
3 | UNDER GROUND SEWERAGE SCHEME 60,000.00
4 | INTEGRATED SOLID WASTE MANAGEMENT 3,000.00
5 | URBAN ROADS, MOBILITY & TRANSPORT 30,350.00
6 | URBAN GREENING, RECREATION & OPEN SPACES 2,000.00
7 | WATER BODIES DEVELOPMENT 2,000.00
8 | SOCIAL INFRASTRUCTURE 1,500.00
9 | SAFETY & SECURITY MISSION 500.00
10 | DIGITAL URBAN GOVERNANCE 300.00
11. | PUBLIC HEALTH MISSION 300.00
TOTAL 150,000.00
5 Allocation of Funds under CMIUDM
5.1 Allocation Principles
The funds available under the CHIEF MINISTER'S INTEGRATED URBAN
DEVELOPMENT MISSION (CMIUDM) shall be allocated among the implementing
agencies, namely the Greater Chennai Corporation (including CMWSSB), Other
Municipal Corporations and Municipalities under the Directorate of Municipal
Administration (DMA) and Town Panchayats under the Directorate of Town
Panchayats (DTP).
The allocation of funds shall be based on the following principles:
i. 90% weightage shall be assigned to the projected urban population (2025)
of the respective category of Urban Local Bodies.
ii. 10% weightage shall be assigned to the geographical area (sq.km.) under
the jurisdiction of the respective implementing agency.
iii. The projected population shall be derived from the 2011 Census with
suitable growth projections adopted by the Government.
iv. The allocation shall be reviewed periodically by the Government based on
changes in urban population, area, administrative jurisdiction and mission
requirements.
5.2 Distribution of Mission Funds
The indicative allocation of Mission funds among the implementing agencies
shall be as follows
Projected Area Allocation based on
Implementing Population (Sa 90% Population + | Share
Agency (2025) Pen ) 10% Area (Rs. (%)
(Million) F Crore)
Greater Chennai
Corporation including 79.73 426 1163.35 19%
CMWSSB
Directorate of
Municipal
Administration
24 Corporations 132.11 2,139 2005.69 33%
146 Municipalities 84.47 2,644 1351.92 23%
Di euarecem OMT OW TY 81.31| 5,832 1480.36 | 25%
Panchayats
Total 377.62| 11,017 6000.00 100
5.3 Flexibility in Allocation
The above allocation shall serve as the broad distribution framework for
implementation of CMIUDM. The Government may re-allocate or redistribute
funds among the implementing agencies based on project readiness, utilisation
of funds, performance, emerging infrastructure priorities or any other policy
decision to ensure optimal utilisation of Mission resources.
6 Sub – Missions under CMIUDM:
6.1 City Infrastructure Development Plan (CIDP)
6.1.1 Purpose
The City Infrastructure Development Plan (CIDP) shall be the primary
strategic planning document for all cities with a population of more than one
lakh under the CHIEF MINISTER'S INTEGRATED URBAN DEVELOPMENT
MISSION (CMIUDM). The CIDP shall provide a comprehensive framework for
planning, prioritising, financing and implementing urban infrastructure projects
to achieve sustainable, resilient and inclusive urban development.
6.1.2 Objectives
The CIDP shall:
Assess the existing status of urban infrastructure and municipal services.
Analyse demographic growth, economic activities, land use patterns,
environmental conditions and future urbanisation trends.
Identify infrastructure deficits, service-level gaps and investment
requirements across all urban sectors.
Prioritise projects based on service needs, growth potential, climate
iv.
resilience, financial viability and citizen requirements.
v. Promote integrated planning across ail sectors covered under the eleven
sub-missions of CMIUDM.
vi. Provide a medium- to long-term investment roadmap for systematic urban
infrastructure development.
6.1.3 Scope
The CIDP shall cover all major urban infrastructure sectors, including:
2
li.
iii.
iv.
Vv.
vi.
vii.
vili.
xi.
Water Supply
Sewerage and Sanitation
Storm Water Drainage
Solid Waste Management
Urban Roads and Mobility
Urban Water Bodies
Green Spaces and Urban Environment
Public Health
Social Infrastructure
Safety and Security
Digital Urban Governance and Municipal Infrastructure
6.1.4 Planning Approach
The CIDP shall adopt an integrated, evidence-based planning approach using
reliable data, GIS mapping, infrastructure asset inventories, service-level
benchmarks, population projections, climate risk assessments and stakeholder
consultations. The plan shall ensure that infrastructure development is
technically sound, financially sustainable, environmentally responsible and
aligned with statutory master plans and development regulations.
6.1.5 Investment Planning and Convergence
The CIDP shall serve as the principal investment planning document for cities.
It shail identify sector-wise projects, implementation priorities, estimated costs
and financing strategies. The Plan shall facilitate convergence of financial
resources from Government of India schemes, State Government programmes,
External Aided Projects (EAPs), multilateral funding agencies, municipal bonds,
Public-Private Partnerships (PPPs), SFC/CFC grants, Urban Local Body resources
and other eligible funding sources to maximise investment efficiency and avoid
duplication.
6.1.6 Implementation and Review
The CIDP shali be prepared by the Urban Local Body with the support of
competent technical agencies and approved by the competent authority under
CMIUDM. It shall be reviewed and updated periodically to reflect changing urban
growth patterns, emerging infrastructure needs, technological advancements
and policy priorities.
6.2 Sub Mission – Urban Water Supply
6.2.1 Objectives and Expected Outcomes
The Water Supply Sub-Mission under the CHIEF MINISTER'S INTEGRATED
URBAN DEVELOPMENT MISSION (CMIUDM) aims to provide universal, safe,
reliable, sustainable and equitable water supply to all Urban Local Bodies
(ULBs) in Tamil Nadu.
The Mission envisages:
i. Universal household water supply coverage with reliable and equitable
services.
ii. 24×7 pressurised water supply in all Municipal Corporations through
phased implementation.
5
Minimum 3 hours of assured daily water supply with prescribed quantity,
quality and adequate pressure in Municipalities and Town Panchayats.
Sustainable water source development, efficient distribution systems,
reduction of Non-Revenue Water (NRW), universal metering, digital water
management and climate-resilient infrastructure.
Financially sustainable, climate-resilient and digitally enabled urban water
utilities.
6.2.2 Eligible Project Components
Projects may include one or more of the following components:
viii.
ix.
x.
xi.
xii.
Source augmentation and sustainability (surface water, groundwater
recharge, desalination, treated wastewater reuse)
Intake works, raw water pumping mains and transmission mains
Water Treatment Plants (WTPs)
Master Balancing Reservoirs (MBRs), Ground Level Service Reservoirs
(GLSRs), Elevated Service Reservoirs (ESRs), Underground Tanks (UGTs)
Distribution network strengthening, replacement and expansion
Universal household service connections
District Metered Areas (DMAs), pressure management and leak detection
systems
Consumer metering, bulk metering and smart metering
SCADA, GIS mapping, automation and digital asset management
Energy-efficient pumping systems with Variable Frequency Drives (VFDs)
Water quality laboratories and online monitoring systems
Five-year Operation & Maintenance (O&M) including capacity building
6.2.3 Selection Criteria – ULB Prioritisation
Priority shall be accorded based on the following:
i.
ii.
iii.
iv.
v.
ULBs having inadequate water supply or intermittent supply
Low household water supply coverage
High Non-Revenue Water (NRW)
Readiness of DPR, statutory approvals and land availability
Financial sustainability and ULB commitment for O&M
6.2.4 Selection of Projects within ULBs
Projects shall be identified based on comprehensive technical assessment
considering:
i.
i.
iii.
iv.
v.
Water balance and demand-supply gap
Source sustainability assessment
Hydraulic modelling of the distribution network
Existing infrastructure condition assessment
Consumer coverage and unserved areas
6
vi. NRW assessment and leakage mapping
vii. Water quality deficiencies
viii. Service level benchmarks
ix. Energy efficiency opportunities
x. Cost-benefit analysis and lifecycle costs
Priority shall be given to projects that maximize service coverage, improve
system efficiency and achieve measurable service level improvements.
6.2.5 Implementation Requirements
Every project shall include:
i. Comprehensive DPR with hydraulic modelling
li. Source sustainability and climate resilience assessment
iii. GIS-based asset mapping
iv. Universal metering strategy
v. Five-year O&M contract
vi. Performance monitoring through KPIs (coverage, LPCD, pressure, NRW,
water quality and consumer satisfaction)
6.3 Sub Mission – Underground Sewerage
6.3.1 Objectives and Expected Outcomes
The Underground Sewerage Sub-Mission under the CHIEF MINISTER'S
INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) aims to provide safe,
sustainable, inclusive and environmentally compliant sanitation
services to all Urban Local Bodies (ULBs) in Tamil Nadu.
The Mission envisages:
i. 100% underground sewerage coverage in Municipal Corporations, ULBs
with population above 1 lakh, District Headquarters, tourism-important
towns and other priority urban centres.
ii. Scientific Septage and Faecal Sludge Management (FSSM) systems in all
remaining Municipalities and Town Panchayats within five years, with
phased transition to underground sewerage wherever feasible.
iii. Universal collection, conveyance, treatment, reuse of treated wastewater
and environmentally safe disposal of sewage and sludge.
iv. Elimination of untreated sewage discharge into water bodies through
environmentally sustainable, financially viable and digitally managed
urban sanitation systems.
6.3.2 Eligible Project Components
Projects may include one or more of the following components:
i.
if.
iii.
iv.
v.
vi.
vii.
viii.
ix.
x.
xi.
xii.
Underground sewerage network and house sewer connections
Sewage pumping stations and rising mains
Sewage Treatment Plants (STPs), Modular/Decentralized STPs and
package treatment plants
Rehabilitation and augmentation of existing sewerage systems
Septage and Faecal Sludge Treatment Plants (FSTPs)
Co-treatment facilities at STPs
Public and community sewer connections in unserved areas
Reuse infrastructure for treated wastewater (industrial, landscaping,
agriculture and groundwater recharge)
SCADA, automation, online monitoring and GIS-based sewer asset
management
Sewer cleaning equipment, inspection systems and maintenance
machinery
Sludge handling, dewatering and disposal facilities
Operation & Maintenance (O&M) including capacity building
6.3.3 Selection Criteria — ULB Prioritisation
Priority shall be accorded based on the following:
vi.
6.3.4 Selection of Projects Within ULBs
Projects shall be identified based on comprehensive technical assessment
Municipal Corporations
ULBs with population above 1 lakh
District Headquarters
Tourism-important towns
Environmentally sensitive and polluted water body catchments
ULBs with poor sanitation coverage and open discharge of sewage
considering:
vii.
Existing sanitation coverage and service gaps including assessment of
existing infrastructure condition.
Population density and future growth
Pollution of rivers, lakes and water bodies
Potential for wastewater recycling and reuse
Lifecycle cost and financial sustainability
Availability of land for treatment facilities
Compliance with environmental and pollution control norms
Priority shall be given to projects that maximize sanitation coverage, improve
environmental outcomes, increase wastewater reuse and achieve measurable
service level improvements.
6.3.5 Implementation Requirements
Every project shall include:
i. Comprehensive DPR with hydraulic design
ji. City Sanitation Plan/FSSM Plan
iii. Environmental and climate resilience assessment
iv. GIS-based sewer asset mapping
v. Provision for 100% household sewer connections
vi. O&M contract
Performance monitoring through KPIs (coverage, collection efficiency, treatment
efficiency, reuse, compliance with discharge standards and customer
satisfaction)
6.4 Sub Mission – Integrated Solid Waste Management
6.4.1 Objectives and Expected Outcomes
The Solid Waste Management (SWM) Sub-Mission under the CHIEF MINISTER'S
INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM)aims to establish a
sustainable, circular, climate-resilient and environmentally compliant
solid waste management system in compliance with Solid Management
Rules 2026 across all Urban Local Bodies (ULBs) in Tamil Nadu.
The Mission envisages:
i. 100% source segregation, door-to-door collection, scientific
transportation, processing and disposal of municipal solid waste.
ii. Maximization of resource recovery through Reduce, Reuse, Recycle (3R)
principles, composting, bio-methanation, Material Recovery Facilities
(MRFs), Waste-to-Energy (WtE) and scientific land filling.
iii. Establishment of Waste-to-Energy facilities in Municipal Corporations,
wherever technically and financially feasible.
iv. Construction and Demolition (C&D) Waste Management Plants for
recycling and reuse of construction waste.
v. Scientific management of legacy waste and remediation of dumpsites.
vi. Promotion of recycling, composting and circular economy practices to
enhance resource recovery.
vii. Development of clean, healthy, environmentally sustainable and digitally
managed urban solid waste management systems across all ULBs.
6.4.2 Eligible Project Components
Projects may include one or more of the following components:
i. Door-to-door waste collection systems and source segregation
infrastructure
ii. Waste collection vehicles, transfer stations and transportation systems,
Decentralized waste management system
iii. | Material Recovery Facilities (MRFs) and Dry Waste Collection Centres
iv. Compost plants, bio-methanation plants and organic waste processing
facilities
v. Waste-to-Energy (WtE) plants and Refuse Derived Fuel (RDF) facilities,
wherever feasible
vi. Scientific sanitary landfills for inert waste
vii. Construction and Demolition (C&D) Waste Processing and Recycling Plants
viii. Legacy waste bio-mining and dumpsite remediation
ix. Plastic waste, e-waste, slaughter house waste processing and domestic
hazardous waste collection systems
x. Smart bins, GPS vehicle tracking, loT monitoring, GIS mapping and digital
waste management systems
xi. Operation & Maintenance (O&M) contracts
6.4.3 Selection Criteria — ULB Prioritisation
Priority shall be accorded based on the following:
i. Municipal Corporations and high waste-generating ULBs
ii. ULBs with inadequate processing capacity
iii. ULBs having legacy waste dumpsites
iv. Tourism-important and environmentally sensitive urban areas
v. ULBs requiring regional/common waste processing facilities
vi. ULB's Compliance status with the Solid Waste Management Rules, 2026
vii. Potential for decentralized waste management wherever feasible
viii. Coastal, riverine or ecologically sensitive locations vulnerable to open
dumping impact (rivers, water bodies, wetlands)
ix. Willingness to adopt PPP/private sector participation models
x. ULBs bordering or feeding into inter-state/inter-district boundaries (waste
migration issues)
6.4.4 Selection of Projects within ULBs
Projects shall be identified based on comprehensive technical assessment
considering:
i. Existing collection efficiency and segregation levels
ii. Processing capacity gap and future waste generation
10
iii.
Vv.
v.
Availability of land for processing and disposal facilities
Potential for composting, bio methanation, recycling and Waste-to-Energy
Legacy waste remediation requirements
Priority shall be given to projects that maximize waste processing, resource
recovery, landfill diversion and environmental benefits.
6.4.5 Implementation Requirements
Every project shall include:
I
ii.
iii.
iv.
v.
City Solid Waste Management Plan
Waste characterization and quantity assessment
GIS-based asset mapping and digital monitoring
O&M contract
Performance monitoring through KPIs (collection efficiency, source
segregation, processing efficiency, landfill diversion, resource recovery
and customer satisfaction)
6.5 Sub Mission -Urban Roads, Mobility and Transport
6.5.1 Objectives and Expected Outcomes
The Urban Roads & Urban Transport Sub-Mission under the CHIEF MINISTER'S
INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) aims to develop a
safe, efficient, sustainable, climate-resilient and integrated urban mobility
system across all Urban Local Bodies (ULBs) in Tamil Nadu.
The Mission envisages:
vi.
Development and upgradation of urban road networks (within the ULB
limit) with improved connectivity and resilience.
Creation of safe, accessible and inclusive streets for pedestrians, cyclists,
public transport users and persons with disabilities.
Promotion of sustainable urban mobility through public transport,
multimodal integration, intelligent traffic management, electric mobility
and last-mile connectivity.
Reduction in traffic congestion, travel time, road accidents and greenhouse
gas emissions while supporting economic growth and quality of life.
Elimination of accident black spots and strengthening of road safety
measures.
Development of efficient, inclusive and digitally managed urban transport
systems that support sustainable economic growth.
6.5.2 Eligible Project Components
Projects may include one or more of the following components:
Construction, widening, strengthening and rehabilitation of urban roads
11
vi.
vii.
viii.
xi.
xii.
xili.
Junction improvements, grade separators, flyovers, road over bridges
(ROBs), road under bridges (RUBs) and bridges, wherever justified
Complete Streets development with footpaths, Cycle tracks, universal
accessibility and streetscaping
A Walking -catchment with footpath continuity ,refuge islands, safe
crossings and last-mile connectivity etc., around transit nodes such as bus
stands, railway stations and metro stations.
New roads/ Scheme roads wherever feasible ,include utility ducts and
raised machine-holes to avoid road cutting for future utility works.
Road safety improvements including black spot rectification, traffic
calming measures, signage, road markings and street lighting
Bus priority corridors, bus shelters, bus terminals and multimodal
transport hubs
Intelligent Transport Systems (ITS), Adaptive Traffic Signal Control
(ATCS), smart parking and traffic management systems
Electric Vehicle (EV) charging infrastructure and supporting facilities
Last-mile connectivity infrastructure including pedestrian links and non-
motorised transport (NMT) facilities
Climate-resilient road infrastructure with integrated stormwater drainage
and flood mitigation measures
Road asset management systems, GIS mapping and digital monitoring
Operation & Maintenance (O&M) for eligible smart mobility systems
6.5.3 Selection Criteria – ULB Prioritisation
Priority shall be accorded based on the following:
Municipal Corporations and rapidly urbanising ULBs having high proportion
of earthen roads.
ULBs experiencing severe traffic congestion and road safety issues
District Headquarters, industrial, commercial and tourism-important
towns
Connectivity to bus terminals, railway stations, metro stations, airports
and major public institutions
6.5.4 Selection of Projects within ULBs
Projects shail be identified based on comprehensive technical assessment
considering:
Urban Mobility Plan/Comprehensive Mobility Plan (CMP)
Existing road network condition including roads damaged due to water
supply/ UGSS or any other associated infrastructure works and traffic
volume
Congestion levels and travel time delays
Transit -Node walkablity
Road safety audits and accident black spots
2
vi.
vii.
viii.
ix.
xX.
xi.
New Storm water drains
Pedestrian and cyclist demand
Public transport accessibility and multimodal integration
Storm water drainage deficiencies and climate resilience requirements
Lifecycle cost, economic benefits and financial sustainability
Utility coordination and land availability
Priority shall be given to projects that improve connectivity, enhance road safety,
strengthen public transport, promote non-motorised transport and maximize
network efficiency. :
6.5.5 Implementation Requirements
Every project shall include:
i
ii.
iii.
iv.
v.
Comprehensive DPR supported by traffic and road safety studies
GIS-based road asset mapping
Road Safety Audit by an independent agency
Third-party quality assurance
Performance monitoring through KPIs (road condition, travel time,
congestion reduction, accident reduction, public transport accessibility and
user satisfaction)
6.6 Sub – Mission -Urban Green, Recreation and Open Spaces
6.6.1 Objectives and Expected Outcomes
The Urban Greening, Recreation & Open Spaces Sub-Mission under the CHIEF
MINISTER'S INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) aims to
create green, healthy, climate-resilient, inclusive and liveable urban
environments across all Urban Local Bodies (ULBs) in Tamil Nadu.
The Mission envisages:
Development, restoration and maintenance of urban parks, playgrounds,
green corridors, urban forests, waterfronts, biodiversity parks and public
open spaces.
City wide Greening plan to be prepared as part of CIDP, identifying priority
corridors, species and layering.
Plantation of 5 crore trees over five years across urban areas to increase
green cover, improve air quality, enhance biodiversity, sequester carbon
and mitigate urban heat island effects.
Promotion of accessible and inclusive recreational spaces, ecological
conservation, nature-based solutions and climate-resilient urban
landscapes.
Expansion of public open spaces and universal access to safe, well-
maintained parks and recreational facilities.
13
vi.
vii.
Sustainable management of urban green assets through community
participation, ecological restoration and digital monitoring.
Creation of healthy, livable and climate-resilient cities with improved
environmental quality and biodiversity.
6.6.2 Eligible Project Components
Projects may include one or more of the following components:
vi.
vii.
viii.
xi.
xii.
Development and rejuvenation of urban parks, neighbourhood parks and
children's parks including rain water harvesting facilities
Development of playgrounds, sports parks and recreational open spaces
Urban forests, Miyawaki forests and biodiversity parks
Green corridors along roads, canals, rivers, railways and utility corridors
Avenue plantation, median plantation and urban tree plantation
programmes
Lakefront, riverfront and waterfront landscaping integrated with ecological
restoration
Botanical gardens, butterfly parks and biodiversity conservation areas
Open-air fitness facilities, walking tracks, cycling tracks and senior citizen
parks
Public plazas, community open spaces and inclusive recreational
infrastructure
Irrigation systems using treated wastewater, rainwater harvesting and
smart landscape management
GIS-based green asset inventory, tree census and digital monitoring
systems
Five-year Operation & Maintenance (O&M) including community
participation
6.6.3 Selection Criteria – ULB Prioritisation
Priority shall be accorded based on the following:
i.
i.
iti.
iv.
v.
vi.
vil.
viii.
ULBs with low per capita green space
High-density urban areas and heat island zones
Environmentally sensitive and pollution-prone urban areas
ULBs lacking parks, playgrounds and recreational facilities
Riverfronts, lakefronts and degraded public open spaces requiring
restoration
Climate-vulnerable cities requiring nature-based solutions
Cost – Effectiveness, Readiness of DPR, statutory approvals and land
availability.
Community participation and maintenance commitment
14
6.6.4 Selection of Projects within ULBs
Projects shall be identified based on comprehensive technical assessment
considering:
i. Existing green cover and per capita open space
ii. Availability and accessibility of public open spaces
iii. Population density and recreational demand
iv. Opportunities for urban afforestation and ecological restoration
v. Integration with lakes, rivers, canals and stormwater systems
vi. Lifecycle cost and long-term maintenance sustainability
vii. Community participation and environmental benefits
Priority shall be given to projects that maximize green cover, improve public
accessibility, enhance biodiversity, strengthen climate resilience and provide
measurable environmental and social benefits.
6.6.5 Implementation Requirements
Every project shall include:
i. Urban Green Space Development Plan or Landscape Master Plan
ji. Tree plantation plan with survival and maintenance strategy
iii. Climate resilience and biodiversity assessment
iv. Universal accessibility for persons with disabilities
v. GIS-based green asset mapping and tree inventory
vi. Five-year O&M contract with survival guarantee for plantations
vii. Third-party quality assurance
viii. Performance monitoring through KPIs (green cover, tree survival rate, per
capita open space, park accessibility, biodiversity enhancement and citizen
satisfaction)
6.7 Sub – Mission -Urban Water Bodies Development
6.7.1 Objectives and Expected Outcomes
The Urban Water Bodies Development Sub-Mission under the CHIEF MINISTER'S
INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) aims to restore,
conserve and sustainabiy manage urban water bodies across all Urban Local
Bodies (ULBs) in Tamil Nadu.
15
The Mission envisages:
vi.
Restoration and rejuvenation of lakes, ponds, tanks, canals, rivers,
wetlands and other urban water bodies through desilting, pollution
abatement, ecological restoration and catchment protection.
Priority rejuvenation of the Adyar River, Cooum River and Buckingham
Canal in Chennai, and the Noyyal River in Coimbatore, along with other
ecologically and socially significant urban water bodies.
Enhancement of water quality, water security, groundwater recharge, flood
resilience, biodiversity, climate adaptation and creation of accessible
public waterfronts.
Development of accessible, environmentally sustainable waterfronts and
public spaces.
Promotion of scientific management and community participation for the
sustainable conservation of urban water ecosystems.
Creation of climate-resilient urban water systems that support ecological
health, environmental sustainability and improved quality of life.
6.7.2 Eligible Project Components
Projects may include one or more of the following components:
vi.
vii.
viii.
Xi.
xii.
Desilting and restoration of lakes, ponds, tanks, canals, rivers and
wetlands.
Strengthening of bunds, embankments, retaining walls and erosion
protection works.
Restoration of inlets, outlets, surplus weirs and hydraulic structures.
Removal of encroachments, invasive vegetation and solid waste (as per
statutory procedures).
Pollution abatement measures, interception, diversion and treatment of
sewage and in-situ water quality improvement.
Ecological restoration, wetland development, habitat improvement and
biodiversity conservation.
Catchment area treatment, storm water management and groundwater
recharge structures.
Lakefront, riverfront and canal-front development with public access,
walking and cycling tracks, landscaping and recreational facilities.
The project scope shall include the water body and its immediate frontage,
including parking and pedestrian facilities along the access roads adjoining
the water body.
Water quality monitoring systems, IoT sensors, GIS mapping and digital
asset management.
Public awareness, community participation and capacity building.
Operation & Maintenance (O&M) including ecological management.
16
6.7.3 Selection Criteria – ULB Prioritisation
Priority shall be accorded based on the following:
iii.
vi.
vii.
viii.
ULBs with degraded or polluted urban water bodies
Water bodies contributing significantly to flood mitigation and groundwater
recharge
Environmentally sensitive and biodiversity-rich ecosystems
Rivers, lakes and canals of regional or State importance
Priority urban rivers including Adyar, Cooum, Buckingham Canal in
Chennai and other major polluted river stretches in other ULBs.
Water bodies supporting drinking water sources or urban resilience
Readiness of DPR, statutory approvals and land availability
Community participation and commitment for long-term maintenance
6.7.4 Selection of Projects within ULBs
Projects shall be identified based on comprehensive technical assessment
considering:
vii.
viii.
Water bodies with deteriorated Ecological condition and water quality
including mixing of sewer
Extent of pollution and encroachments
Storage capacity and groundwater recharge potential
Flood mitigation and storm water management benefits
Biodiversity conservation value
Catchment characteristics and hydrological assessment
Public accessibility and recreation potential
Lifecycle cost and sustainability of interventions
Integration with sewerage, storm water drainage and urban greening
projects
Priority shall be given to projects that maximize ecological restoration, improve
water quality, enhance flood resilience, increase groundwater recharge and
create sustainable public waterfronts.
6.7.5 Implementation Requirements
Every project shall include:
i.
ii.
iii.
iv.
Vv.
vi.
vii.
Comprehensive DPR with hydrological and ecological assessment
Water quality and pollution source assessment
Catchment management and climate resilience plan
Environmental and statutory clearances, wherever applicable
GIS-based mapping and digital inventory of water bodies
O&M and ecological maintenance plan
Third-party quality assurance
17
viii. Performance monitoring through KPIs (water quality, storage capacity,
groundwater recharge, biodiversity enhancement, flood mitigation and
citizen satisfaction)
6.8 Sub -Mission – Social Infrastructure
6.8.1 Objectives and Expected Outcomes
The Social Infrastructure Sub-Mission under the CHIEF MINISTER’S
INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) aims to strengthen
urban livability by providing inclusive, accessible, resilient, and future-
ready social infrastructure across all Urban Local Bodies (ULBs) in
Tamil Nadu.
The Mission envisages:
i. Development and modernization of schools, urban health and wellness
centres, Anganwadis (Based on the Recommendation of Director, ICDS),
community halis, Kalyana Mandapams, bus stands, markets, shandies,
convention centres, digital libraries, skill development centres and other
essential civic facilities.
ii. Universal access to quality education, healthcare, social services,
community spaces and livelihood infrastructure.
iii. Creation of citizen-centric, climate-resilient, digitally enabled and
universally accessible public facilities to improve quality of life and
promote inclusive urban development.
iv. Enhancement of livelihood opportunities through markets, _ skill
development centres and community infrastructure.
v. Strengthening of social inclusion, community engagement and access to
essential urban services.
vi. Promotion of sustainable socio-economic development and improved
urban livability across all ULBs.
6.8.2 Eligible Project Components
Projects may include one or more of the following components:
i. Construction, modernization and expansion of Government schools and
future-ready smart classrooms (Based on Student strength)
ii. Urban Primary Health Centres (UPHCs), Health & Wellness Centres and
public health infrastructure
iii. Anganwadi centres, child development and nutrition facilities
iv. Community halls, Kalyana Mandapams and multipurpose community
centres*
v. Bus stands, integrated bus terminals and passenger amenities
vi. Municipal markets, shandies, fish markets and vending zones
vii. Convention centres, exhibition halls and cultural infrastructure
18
vili.
xi.
xii.
Digital libraries, knowledge centres and e-learning facilities
Skill development, entrepreneurship and livelihood training centres
Universal accessibility, green building features, solar power, rainwater
harvesting and energy-efficient systems
Smart building management systems, CCTV, Wi-Fi and digital service
delivery infrastructure
Five-year Operation & Maintenance (O&M) for eligible facilities
* Note : Community halls, Kalyana Mandapams and convention centres may, in general,
be better suited for development by the private sector wherever feasible. The
involvement of ULBs may therefore be limited to areas having a significant Scheduled
Caste and Scheduled Tribe population, where such facilities serve important welfare and
social inclusion purposes.
6.8.3 Selection Criteria – ULB Prioritisation
Priority shall be accorded based on the following:
vi.
vii.
viii.
ULBs with inadequate social infrastructure
High population growth and underserved urban areas
Economically weaker and socially vulnerable communities
District Headquarters, Municipal Corporations and rapidly urbanising
towns
Areas lacking access to education, healthcare and community facilities
Readiness of DPR, statutory approvals and land availability
Financial sustainability and commitment for O&M
Convergence with Central/State schemes and external funding
6.8.4 Selection of Projects Within ULBs
Projects shall be identified based on comprehensive technical assessment
considering:
i.
it.
iii.
iv.
v.
vi.
vii.
viii.
ix.
Existing infrastructure gaps and service coverage
Population density and demographic characteristics
Accessibility and equitable distribution of facilities
Demand assessment for education, healthcare, markets and community
infrastructure
Structural condition of existing assets
Universal accessibility requirements for persons with disabilities, women,
children and senior citizens
Climate resilience, energy efficiency and green building potential
Lifecycle cost, financial sustainability and operational viability
Scope for digital service delivery and smart infrastructure
Priority shall be given to projects that maximize public service delivery, improve
social inclusion, strengthen livelihood opportunities and enhance citizen well-
being.
19
6.8.5 Implementation Requirements
Every project shall include:
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
Comprehensive DPR based on service demand assessment
Universal accessibility compliant with applicable standards
Green building and energy-efficient design features, wherever feasible
Climate resilience and disaster safety measures
Digital infrastructure for service delivery and facility management
Five-year O&M plan for eligible facilities
Third-party quality assurance
Performance monitoring through KPIs (service coverage, facility
utilization, accessibility, energy efficiency, user satisfaction and
operational performance)
6.9 Sub – Mission: Safety and Security Mission
6.9.1 Objectives and Expected Outcomes
The Safety & Security Sub-Mission under the CHIEF MINISTER’S INTEGRATED
URBAN DEVELOPMENT MISSION (CMIUDM) aims to create safe, secure,
resilient and inclusive urban environments across all Urban Local Bodies
(ULBs) in Tamil Nadu.
The Mission envisages:
vi.
Strengthening urban safety through integrated surveillance systems,
smart street lighting, emergency response infrastructure and intelligent
public safety monitoring.
Enhancing the safety of women, children, senior citizens, persons with
disabilities and other vulnerable groups through technology-enabled
solutions and safer public spaces.
Improving disaster preparedness, emergency response, crime prevention
and citizen confidence through integrated urban safety infrastructure.
Expanding surveillance and smart street lighting coverage in priority areas
to create safer and more secure public spaces.
Reducing public safety risks and strengthening citizen confidence through
resilient, digitally managed and citizen-centric urban safety systems.
Promoting safer, more secure and disaster-resilient cities that improve
quality of life across all ULBs.
6.9.2 Eligible Project Components
Projects may include one or more of the following components:
Integrated CCTV surveillance systems at public places, roads, parks,
markets, bus stands and other critical infrastructure
20
vi.
vil.
viii.
x.
xi.
Smart LED Street lighting with remote monitoring and adaptive lighting
controls, including aesthetic / ornamental lighting component for public
spaces, monuments, water fronts etc,.
Emergency call boxes, panic buttons and public emergency
communication systems
Integrated City Safety Command and Control Centres or integration with
existing ICCCs (Based on the necessity)
Intelligent video analytics, Al-enabled surveillance and incident detection
systems
Public Address Systems (PAS) and emergency warning systems
Disaster early warning systems for floods, cyclones, heatwaves and other
urban hazards
Smart traffic enforcement and road safety monitoring systems
Safety infrastructure around schools, hospitals, transport hubs and public
spaces
Cyber-secure digital communication and monitoring platforms
Five-year Operation & Maintenance (O&M) including software support and
capacity building
6.9.3 Selection Criteria — ULB Prioritisation
Priority shall be accorded based on the following:
Iv.
v.
vi.
vii.
viil.
Municipal Corporations and densely populated urban areas
ULBs with higher incidence of road accidents, crime or public safety
concerns
Major transport hubs, markets, commercial districts and tourism-
important towns
Disaster-prone and climate-vulnerable urban areas
Areas with inadequate street lighting and public safety infrastructure
Readiness of DPR, statutory approvals and institutional coordination
Financial sustainability and commitment for O&M
Convergence with Central/State schemes and external funding
6.9.4 Selection of Projects Within ULBs
Projects shall be identified based on comprehensive technical assessment
considering:
i
li.
iif.
iv.
ve
vi.
Crime and public safety assessment
Road accident black spots and traffic safety studies
Pedestrian movement and vulnerable user assessment
Disaster risk and emergency response requirements
Existing surveillance and street lighting coverage
Safety needs of women, children, senior citizens and persons with
disabilities
21
vii. Integration with Intelligent Traffic Management Systems (ITMS),
Emergency Response Systems and Integrated Command and Control
Centres (ICCCs)
viii. Lifecycle cost, cybersecurity and operational sustainability
ix. Coordination with Police, Fire & Rescue Services and Disaster Management
Authorities
Priority shall be given to projects that improve public safety, strengthen
emergency response, enhance disaster resilience and maximize citizen
confidence.
6.9.5 Implementation Requirements
Every project shall include:
i. Comprehensive DPR with safety and security assessment
ii. Cybersecurity and data privacy compliance plan
iii. Integration with existing ICCCs, emergency response and disaster
management systems
iv. Universal accessibility and inclusive public safety design
v. GIS-based asset mapping and digital monitoring
vi. Five-year O&M contract including software updates and maintenance
vii. Third-party quality assurance
viii. Performance monitoring through KPIs (crime reduction, street lighting
coverage, emergency response time, surveillance uptime, road safety
improvements and citizen satisfaction)
6.10 Sub – Mission:Digital Urban Governance
6.10.1 Objectives and Expected Outcomes
The Digital Urban Governance Sub-Mission under the CHIEF MINISTER'S
INTEGRATED URBAN DEVELOPMENT MISSION (CMIUDM) aims to transform
Urban Local Bodies (ULBs) into smart, efficient, transparent, data-
driven and citizen-centric institutions through digital governance and
emerging technologies.
The Mission envisages:
i. Creation of a comprehensive digital asset register for alt municipal
infrastructure and public assets.
ii. Implementation of Al-enabled Urban Transformation Information System
(UTIS 2.0) for integrated urban planning, project monitoring, financial
management and decision support.
iii. Provision of 100% end-to-end online municipal and citizen services,
including a Unique Digital Property Identification (UDPI) system for every
property.
22
vi.
Real-time monitoring of infrastructure projects, Government schemes,
municipal finances, service delivery and urban assets through integrated
dashboards and command platforms.
Enhancement of governance efficiency, transparency, municipal revenue
mobilization and data-driven urban management.
Development of fully digital, transparent and citizen-centric Urban Local
Bodies (ULBs).
6.10.2 Eligible Project Components
Projects may include one or more of the following components:
vi.
vii.
viii.
xii.
xiii.
Al-enabled Urban Transformation Information System (UTIS 2.0)
Comprehensive Digital Asset Register covering all municipal infrastructure
and public assets*
GIS-based property mapping and Unique Digital Property Identification
(UDPI) system
End-to-end online municipal services, citizen service portals and mobile
applications
Integrated municipal ERP covering finance, taxation, engineering,
accounts, HR, procurement and asset management
Project Monitoring Information System (PMIS) with real-time dashboards
Integrated data platform with APIs for interoperability across Government
departments
IoT-based monitoring of water supply, sewerage, solid waste, street
lighting, roads and public infrastructure
Integrated Command and Control Centre (ICCC) support systems, where
applicable
Cloud infrastructure, cybersecurity, disaster recovery and data backup
systems
Digital document management, e-office, digital signatures and workflow
automation
Capacity building, digital! literacy and change management
Five-year Operation & Maintenance (O&M), software support and system
upgrades
*Note : The digital asset register is proposed to be rollout within six months from the
launch of scheme guidelines. A check shall be made against the Asset Register of Existing
Underutilised Assets to ensure that there is no duplication with the proposed projects
before the proposals are placed before the CPSMC for sanction.
6.10.3 Selection Criteria – ULB Prioritisation
Priority shall be accorded based on the following:
Municipal Corporations and high-growth urban centres
ULBs with low levels of digital governance and service delivery
23
iii.
iv.
v.
vi.
vii.
viii.
ULBs requiring digital asset management and GIS-based property
mapping
ULBs_ with significant infrastructure investment requiring project
monitoring
Readiness of digital infrastructure, DPR and institutional capacity
Financial sustainability and commitment for system maintenance
Potential for improving municipal revenues, transparency and citizen
services
Convergence with Central/State digital initiatives and external funding
6.10.4 Selection of Projects Within ULBs
Projects shall be identified based on comprehensive technical assessment
considering:
1
ii.
iii.
iv.
Vv.
vi.
vii.
viii.
ix.
Existing level of digital governance and IT infrastructure
Availability and quality of municipal data
Gaps in online citizen service delivery
Asset inventory and GIS mapping requirements
Municipal financial management and revenue enhancement needs
Scope for AI, automation and data-driven decision-making
Cybersecurity, interoperability and data governance requirements
Lifecycle cost and operational sustainability
Integration with State and National digital platforms
Priority shall be given to projects that improve governance efficiency, enhance
transparency, increase municipal revenues, strengthen asset management and
deliver seamless citizen services.
6.10.5 Implementation Requirements
Every project shall include:
i.
ii.
iti.
iv.
ve
vi.
vii.
viii.
ix.
Comprehensive Digital Transformation Plan and DPR
Enterprise Architecture and interoperability framework
GIS-based municipal asset mapping and digital inventory
Cybersecurity, privacy and disaster recovery plan
Adoption of open standards and API-based integration
Capacity building and change management programme
Five-year O&M contract including software support and upgrades
Third-party quality assurance
Performance monitoring through KPIs (online service delivery, transaction
time, municipal revenue improvement, asset coverage, citizen
satisfaction, system uptime and digital adoption)
24
6.11 Sub – Mission: Public Health Mission
6.11.1 Objectives and Expected Outcomes
The Public Health Sub-Mission under the CHIEF MINISTER'S INTEGRATED
URBAN DEVELOPMENT MISSION (CMIUDM) aims to strengthen urban public
health systems, improve environmenta! health and enhance the
livability of cities across all Urban Local Bodies (ULBs) in Tamil Nadu.
The Mission envisages:
vi.
vii.
Establishment of Animal Birth Control (ABC) Centres in all ULBs through
dedicated, access-based or cluster-based models depending on
population, demand and geographical coverage.
Development of dedicated ABC Centres in Municipal Corporations and
larger Municipalities, while smaller ULBs shall be served through shared
regional facilities.
Promotion of humane stray animal management through sterilization,
anti-rabies vaccination, adoption programmes and animal welfare
measures.
Strengthening of vector control, zoonotic disease surveillance,
environmental sanitation, public health monitoring and digital health
management systems to improve urban health and livability.
Reduction in rabies, vector-borne and zoonotic diseases through
preventive health measures and technology-enabled monitoring.
Improvement of public health, animal welfare, urban livability and
environmental health outcomes.
Creation of cleaner, healthier, safer and more resilient urban communities
across Tamil Nadu.
6.11.2 Eligible Project Components
Projects may include one or more of the following components:
vii.
viii.
Construction, modernization and expansion of Animal Birth Control (ABC)
Centres
Cluster-based and regional ABC facilities for groups of smaller ULBs
Animal shelters, quarantine facilities and post-operative care units
Sterilization facilities, operation theatres and veterinary equipment
Anti-rabies vaccination programmes and animal identification systems
Dog catching vehicles, animal ambulances and specialised operational
equipment
Vector control infrastructure including fogging equipment, larvicide
application systems and mosquito surveillance
Public health laboratories and disease surveillance systems
Digital public health monitoring platforms, GIS-based disease mapping
and mobile applications
25
x. IEC programmes on public health, responsible pet ownership and animal
welfare
xi. Capacity building and training of municipal public health personnel
xii. Five-year Operation & Maintenance (O&M) for eligible facilities
6.11.3 Selection Criteria – ULB Prioritisation
Priority shall be accorded based on the following:
i. Municipal Corporations and larger Municipalities with high stray animal
populations
ii. ULBs reporting higher incidences of rabies, vector-borne diseases or public
health concerns
ili. Regional clusters of smaller ULBs requiring shared ABC facilities — in
coordination with Animal Husbandry department.
iv. Tourism-important and densely populated urban centres
v. ULBs lacking public health and ABC infrastructure
vi. Readiness of DPR, statutory approvals and land availability
vii. Commitment for O&M and trained personnel
vii. Convergence with Central/State programmes and external funding
6.11.4 Selection of Projects within ULBs
Projects shall be identified based on comprehensive technical assessment
considering:
i. Stray animal population and sterilization requirements
ii. Coverage gaps in anti-rabies vaccination
iii. Incidence of vector-borne and zoonotic diseases
iv. Population density and public health risk assessment
v. Accessibility to regional ABC facilities
vi. Existing public health infrastructure and service gaps
vii. Digital monitoring and surveillance requirements
viii. Lifecycle cost and operational sustainability
ix. Compliance with animal welfare and environmental regulations
Priority shall be given to projects that maximize disease prevention, improve
public health outcomes, enhance animal welfare and support healthier, safer and
more livable urban environments.
6.11.5 Implementation Requirements
Every project shall include:
i. Comprehensive DPR based on public health and animal population
assessment
ii. Compliance with applicable Animal Birth Control Rules and public health
guidelines
iii. Digital monitoring system for ABC operations, vaccination and disease
surveillance
26
iv. GIS-based mapping of public health assets and service coverage
v. Capacity building for municipal public health and veterinary personnel
vi. Five-year O&M plan for eligible facilities
vii. Third-party quality assurance
viii. Performance monitoring through KPIs (sterilization coverage, anti-rabies
vaccination coverage, reduction in stray animal population growth, vector
control effectiveness, disease incidence and citizen satisfaction)
7 Implementation Plan & City Infrastructure Development Plan
(CIDP)
The CMIUDM guidelines mandate preparation of a City Infrastructure
Development Plan (CIDP) as the principal planning document for infrastructure
development, investment prioritization, reforms and implementation for the
ULBs having population of 1 lakh and above.
8 Fund Allocation and Funding Pattern
The CMIUDM 2026-2031 envisages total investments of Rs.1.50 lakh
crore for transforming urban infrastructure and service delivery across Tamil
Nadu.The projects shall be implemented by leveraging a convergence of
financial resources from multiple sources, including Government of India
schemes, Government of Tamil Nadu programmes, TUFIDCO/TNUIFSL
assistance, External Aided Projects (such as the World Bank, ADB, JICA, KfW
and other funding agencies), Finance Commission Grants, Urban Local Body own
resources and user charges, Corporate Social Responsibility (CSR) contributions
and Public-Private Partnership (PPP) models, wherever feasible and applicable
to the respective sector.
The funding pattern for individual projects will be determined by the
Common Project Sanctioning and Monitoring Committee (CPSMC) based on
project characteristics, sectoral priorities, financial viability and the guidelines
issued under the Mission.
(i) Revenue-generating projects such as Bus Stands, Markets, Commercial
Complexes, Kalyana Mandapams and other similar remunerative projects shall
ordinarily be financed under a 60:40 funding pattern, with 60% of the project
cost provided as Government Grant and the remaining 40%* contributed by the
respective Urban Local Body.
27
However, in the case of financially weaker Urban Local Bodies, such
projects may be financed under an 80:20 funding pattern, with 80%
Government Grant and 20% ULB contribution, as may be approved by the
Government, to facilitate the creation of revenue-generating assets and
strengthen the financial sustainability of such ULBs.
*Note : For revenue-earning assets, PPP/private-sector participation and VGF support
shall be explored first, and grant funding shall be considered only where PPP is not feasible,
(ii) Projects relating to roads, parks, crematoriums, water supply,
underground sewerage, street lighting and other essential civic infrastructure
shall ordinarily be financed under a 90:10 funding pattern, with 90% of the
project cost provided as Government Grant and the remaining 10% contributed
by the respective Urban Local Body.
In exceptional cases, based on the nature, importance or public necessity
of the project, the Committee may recommend a different funding pattern,
which shall be considered on its merits.
[__ SOURCE OF FUNDS
aa SUB- MISSIONS Amount (Rs. Crore)
1. | Urban Challenge Fund Programme (Gol) 30000
2. | Central Finance Grants (Expected) 25000
3. | State Finance Commission (SFC) Grants 10000
4. | Municipal Bonds 2000
5. | General Fund of ULBs 5000
6. | EAP – ADB, World Bank, JICA Etc., 15000
7. | PPP T5000
8. | UIDF – NHB 5000
9. | State Budget 43000
Total 150000
9 Negative List (Projects Not Eligible)
The following shall not be eligible for funding:
i. Routine maintenance and O&M beyond the approved project period.
ii. Replacement of functional assets without technical justification.
iti. Land acquisition and compensation.
iv. Administrative buildings, staff quarters, office infrastructure and general
office equipment.
v. Duplicate funding under any other Government scheme.
28
vi.
vii.
viii.
xi.
xii.
Projects tacking statutory approvals, DPR/technical justification or
prescribed environmental and safety standards.
Projects without essential service components or sustainable
arrangements.
Beautification or commercial works unrelated to project objectives.
Duplication of existing infrastructure of the same asset class in the same
ULB, unless cleared against the asset mapping check recommended at
point 5 above.
Grant funding for revenue-generating assets above a stated cost threshold
without a completed PPP or VGF assessment.
Works where the ULB's matching share is not certified against verified
capacity.
Splitting of a single infrastructure package into multiple smaller DPRs.
9.1 Sector-Specific Exclusions
i.
ii.
vi.
vii.
viii.
Water Supply: Projects without a sustainable water source.
Underground Sewerage: Conventional septic tanks, stand-alone public
toilets, storm water drain desilting.
Solid Waste Management: Open dumping, unscientific landfills, non-
compliant incinerators, projects without segregation/processing.
Urban Roads & Mobility: Works reducing pedestrian safety, commercial
parking facilities.
Urban Green Spaces: Ecological degradation, removal of healthy trees,
restricted-access facilities.
Water Bodies: Commercial development within water bodies, reduction
of storage capacity, activities causing environmental degradation.
Safety & Security: Arms and ammunition, police stations, surveillance
without cyber security safeguards.
Digital Governance: Stand-alone software, duplicate applications,
proprietary non-interoperable systems.
Public Health: Routine veterinary operations, unauthorized culling of
stray animals, non-compliant facilities.
DPR Preparation and Project Development Funding
i.
The Detailed Project Reports (DPRs) for the pipeline of projects proposed
under the Mission shall, wherever applicable, be prepared utilizing the
Project Development and Grant Fund (PDGF) available with TNUIFSL,
subject to the applicable guidelines and approval of the competent
authority.
For small-value projects, the cost of preparation of DPRs and related
project development activities shall generally be borne by the concerned
ULB, unless otherwise approved by the Government/CPSMC.
29
In the case of projects taken up under Government of India-sponsored
programmes, the Administrative and Other Expenditure (AOE) funds
available under the respective Government of India programme may be
utilized for preparation of DPRs and other eligible project development
activities, subject to the provisions of the concerned programme
guidelines.
10 Institutional Mechanism
The implementation of CMIUDM shall be governed through institutional
framework anchored by the Common Project Sanctioning and Monitoring
Committee (CPS&MC), with TUFIDCO serving as the Nodal Agency and Fund
Management Agency.
10.1 Common Project Sanctioning and Monitoring Committee
(CPS&MC)
The CPS&MC shall be constituted as follows:
Member Designation
Additional Chief Secretary MA&WS Department Chairman
Commissioner, Greater Chennai Corporation Member
Managing Director, CMWSSB Member
Managing Director, TWAD Board Member
Secretary (Expenditure), Finance Department or nominee Member
Director of Municipal Administration Member
Director of Town Panchayats Member
Managing Director, TUFIDCO Convener
Note : The Nodal Agency/Implementing Department concerned responsible for
the scheme or category of project shall act as the Convener of the CPSMC.
10.2 Functions of CPS&MC
The CPS&MC shall be responsible for:
Approve City Infrastructure Development Plans (CIDPs), Urban
Development Plans and sector-specific investment proposals prepared
under the Mission.
Identify, prioritize and recommend projects for funding based on
infrastructure requirements, service level gaps, population coverage,
environmental outcomes, economic impact and overall urban development
priorities.
Prescribe eligibility conditions, appraisal ec evaluation criteria
and project selection frameworks.
Sanction projects for implementation under the Mission.
30
vi.
vii.
viii.
Approve expenditure related to project preparation, Detailed Project
Reports (DPRs), technical assistance, consultancy services, capacity
building and other mission support activities.
Determine the pattern of assistance, funding structure, financing
arrangements and resource mobilization strategy for approved projects.
Approve fund release procedures, implementation schedules and financial
management mechanisms.
Review, monitor and evaluate the physical and financial progress of
projects and oversee the overall implementation of the Mission.
Note: For Madurai and Coimbatore Corporations, the Director of Municipal
Administration and for Chennai, the Commissioner of GCC may accord
administrative sanction for projects up to Rs.i0 crore, subject to the project
being included in the CIDP approved by the CPSMC and the digital asset register
being in place.
11 Role of the Nodal Agency
The Nodal Agency and Fund Management Agency for CMIUDM shall perform the
following functions:
1
ii.
iii.
iv.
Vv.
vi.
vii.
Invite, receive and process project proposals from implementing agencies.
Undertake technical, financial and institutional appraisal of projects.
Place eligible proposals before the CPSMC for consideration and approval.
Manage mission funds and coordinate fund disbursements.
Monitor project implementation and outcomes through digital monitoring
systems.
Facilitate inter-departmental coordination and resolve implementation
bottlenecks.
Maintain the Mission Management Unit and provide overall programme
management support.
This institutional framework shall ensure transparent decision-making, efficient
fund management, effective project monitoring and timely implementation of
urban infrastructure investments under CMIUDM.
Management Fee and Programme Management Unit
The Nodal Agency responsible for the appraisal of the project shall be
eligible for a management fee of 0.05% of the approved project cost, or
such other rate as may be prescribed by the Government, towards
meeting the administrative and operational costs associated with project
appraisal, processing, monitoring and related Mission activities.
The concerned Nodal Agency may establish or engage a Programme
Management Unit (PMU), wherever considered necessary, to augment its
institutional and technical capacity for appraisal, evaluation, monitoring
and implementation support of projects under the Mission.
31
The selection of the PMU and its members shall be subject to the approval
of the CPSMC. The proposal for constitution/engagement of the PMU shail
clearly indicate the proposed composition, qualifications, roles and
responsibilities, tenure and financial implications.
The composition, functions, staffing, engagement and expenditure of the
PMU shall be determined based on the requirements of the concerned
Nodal Agency and shall be within the management fee or such financial
limits as may be approved by the Government/CPSMC.
Where more than one Nodal Agency is involved in the appraisal of a
project, the management fee and its sharing, if applicable, shall be
determined in accordance with the roles and responsibilities assigned to
each agency and as approved by the CPSMC.
12 Procedure for Project Sanction and Fund Disbursement
Projects under CMIUDM shall follow a structured appraisal, approval and fund
release process to ensure transparency, accountability, and timely
implementation.
Pn Step Action
i. | Submission of The implementing agency shail submit the Detailed
Proposal Project Report (DPR) through the concerned Head of
Department (HoD) to the Nodal Agency, TUFIDCO.
2. | Appraisal The Nodal Agency shall undertake technical, financial,
environmental and institutional appraisal of the proposal
and assess its conformity with Mission guidelines and
sectoral priorities. |
3. | Recommendation by |The Common Project Sanctioning and Monitoring
CPSMC Committee (CPSMC) shall examine the proposal,
approve the project for Mission funding, determine the
funding pattern, and recommend it for Administrative
Sanction.
4, | Administrative Based on the recommendation of the CPSMC, the
Sanction by Government shall issue Administrative Sanction for the
Government project and authorize fund allocation under the Mission.
5, | Fund Release Funds shall be released by the Nodal Agency through
SNA or any other mechanism to the implementing
agency in accordance with the funding pattern and
release conditions approved by the Government and
CPSMC.
6. | Monitoring and The implementing agency shall submit periodic progress
Completion
reports, utilization certificates and completion reports
for review and monitoring by the Nodal Agency and the
CPSMC.
32
12.1 Fund Release Pattern
The funds allocated under the CMIUDM shall be released through a dedicated
Single Nodal Agency (SNA) account to the concerned Implementing
Agency/Urban Local Body (ULB), as applicable unless otherwise approved by the
CPSMC, the funds under the Mission shall generally be released through the
dedicated SNA account in the following manner:
90% of the approved Mission assistance shall be set as a limit in
the SNA account after issue of Administrative Sanction by the
Government through the State Nodal Agency. The limit so set shall enable
drawal of funds in accordance with the approved project, subject to the
prescribed conditions and the actual implementation requirements.
The balance 10% of the approved Mission assistance shall be set
as an additional limit only upon satisfactory completion of the
project and submission of the Completion Certificate, Utilization
Certificate and other prescribed documents by the concerned Head of
Department/Implementing Agency.
13 Miscellaneous Provisions
als
All projects undertaken under CMIUDM may, wherever feasible, be
tendered with a five-year comprehensive operation and maintenance
period to ensure sustainability, quality service delivery and asset
longevity.
. Public-Private Partnerships (PPP) shall be encouraged in suitable sectors
and projects to leverage private sector expertise, innovation and
investment.
. In respect of road infrastructure projects, priority shall be accorded to bus
route roads, major arterial roads and other critical urban transport
corridors. Design and construction standards prescribed by the Ministry of
Road Transport and Highways (MoRTH) may be adopted wherever
applicable.
. For lanes and streets with carriageway widths less than 3.5 metres (or
total road width below 4 metres), road improvement works may be
undertaken using interlocking paver blocks or other suitable technologies.
. All infrastructure projects shall be planned and executed in an integrated
manner, incorporating end-to-end road connectivity, storm water
drainage, street lighting, pedestrian facilities, utility corridors, road
furniture and other essential urban infrastructure components.
. All projects undertaken under CMIUDM shall incorporate climate-resilient
and disaster-resilient planning, design, construction and asset
management practices to enhance the resilience of urban infrastructure
against climate and natural hazards.
33
7. All assets created under the Mission shall be geo-tagged and integrated
into a GIS-based digital asset register to facilitate asset inventory
management, lifecycle monitoring, maintenance planning and informed
decision-making.
8. All projects sanctioned under CMIUDM shall be monitored through UTIS
2.0 or any other Government-approved digital platform to enable real-
time tracking of physical and financial progress, project outcomes and
service delivery performance.
9. The Common Project Sanctioning and Monitoring Committee (CPSMC)
may issue additional operational guidelines, standards and
implementation procedures from time to time for the -effective
implementation of the Mission.
14 Monitoring Framework
To ensure effective monitoring and timely implementation of projects, a District
Monitoring Committee (DMC) shall be constituted in each district under the
chairmanship of the District Collector. The Committee shall comprise
representatives of Urban Local Bodies, including Commissioners, Executive
Officers and concerned technical officials. The DMC shall review the physical and
financial progress of projects, resolve implementation issues and monitor
compliance with Mission guidelines on a monthly basis. Project progress shall
also be monitored through digital dashboards and periodic reviews at the State
level.
15 Power to Modify Guidelines
The Additional Chief Secretary to Government, Municipal Administration and
Water Supply Department, is empowered to issue clarifications, operational
instructions and amendments to these guidelines, and to modify any provisions
of the CMIUDM Guidelines, whenever considered necessary for effective
implementation of the Mission, in consultation with the departments concerned.
KRKKK
GAGANDEEP SINGH BEDI
ADDITIONAL CHIEF SECRETARY TO GOVERNMENT
/ {TRUE COPY//
\| ‘ wonel.s\a gm
sgeeE ION OFFICER
Sains
& iv! &