| Order | G.O.(Ms) No.219 |
|---|---|
| As listed on the official site | G.O.(MS)No.219 |
| Department | Health and Family Welfare Department |
| Official title | National Health Mission-Tamil Nadu – Construction of additional buildings to Government Headquarters Hospital, Dindigul – Action of the Mission Director, National Health Mission-Tamil Nadu in having permitted the Director of Medical and Rural Health Services, Chennai to Modify the design of buildings – Ratified – Orders – Issued. |
| Listed on the official site | 31 July 2026 |
| Date printed on the order | 31 July 2026 |
| Pages | 4 |
| Official PDF | Open the PDF on tn.gov.in |
Text of the order
Read this first. This text was read from the PDF by computer, not typed by a person. Most Government Orders are scanned pages, so names, numbers, amounts and Tamil text can be read wrongly or left out. The official PDF is the authority: check anything you rely on against it.
Show the text (7,089 characters). Read from scanned pages by optical character recognition.
PDF page 1ia
fy boi S
SE ge, 3°
xa ES 7%
. Coney
ee?
ABSTRACT .
National Health Mission-Tamil Nadu — Construction of additional buildings to
Government Headquarters Hospital, Dindigul — Action of the Mission Director, National
Health Mission-Tamil Nadu in having permitted the Director of Medical and Rural Health
Services, Chennai to Modify the design of buildings — Ratified — Orders — Issued.
HEALTH AND FAMILY WELFARE (EAP.IV/2) DEPARTMENT
G.0.(Ms.)No.219 Dated 31.07.2026
UTTUE, Spiqg —- 15
Slat EHautt Bed} 2057
Read:
1. G.O.(Ms).No.27, Health and Family Welfare (EAP.II/2) Department,
dated 24.01.2023.
2. From the Mission Director, National Health Mission-Tamil Nadu in
letter ~No.HSS-CIVIODH/3/2023-CW-NHM, dated 02.06.2023.
(addressed to the Director of Medical and Rural Health Services
and the Engineer in Chief & Chief Engineer, Public Works
Department, Chennai-5).
3. G.O.(Ms).No.295, Health and Family Welfare (EAP.II/2)
Department, dated 07.09.2023
4. From the Director of Medical and Rural Health Services, letter
No.6002/P&D 1/5/2025, dated 10.02.2026 and 27.02.2026.
ORDER:
In the Government Order first read above, orders were issued, among others, for
construction of additional buildings at a total cost of Rs.70.00 crore to upgrade the
Government Hospital, Palani, Dindigul, as District Headquarters Hospital and in the
Government Order third read above, orders were issued for establishment of District
Integrated Public Health Laboratory in the Government Headquarters Hospital, Palani,
Dindigul at a cost of Rs.100.00 lakh.
2. In the letter fourth read above, the Director of Medical and Rural Health
Services has stated that based on the orders issued in Government Order first read
above, tender was floated and an agreement was executed on 06.02.2023 with
M/s.P&C Projects (P) Ltd., Erode for a contract value of Rs.57,21,20,409/- for the above
work. In respect of District Integrated Public Health Laboratory sanctioned to the above
Government hospital in Government Order third read above, separate agreement was
drawn on 31.03.2023. During site inspection of the Project Director, Tamil Nadu Health
PDF page 22
Systems Project on 28.03.2023, it was suggested to construct multti-storied integrated
building instead of multiple separate blocks so as to utilise the available space
effectively. Based on the request of the user Department i.e. the Director of Medical
: and Rural Health Services, the Mission Director, National Health Mission-Tamil Nadu in ;
letter second read above, permitted the Director of Medical and Rural Health Services
to incorporate the required modifications in design of new buildings of Government
Hospital, Palani without any escalation in the total cost approved. Accordingly, the
Engineer-in-Chief and Chief Engineer (General), Public Works Department has
submitted proposal revising the scope of buildings of Government Hospital, Palani with
additional quantities and additional items as detailed below and stated that after revising
the scope, the work was commenced on 01.09.2023 and around 90% of the work
: completed as on 18.12.2025 and finishing work is in progress in all buildings: – :
|S Name of Building C.A.Job no No of Storeys Total panth area
A21-6793 GF +6+Ramp+
OP & IP Block Drg No: 30-36R Connecting Corridor 7120
Rear side East wing A2116793
Block 1 Dig No: 30-36R 670
; Rear side West wing A21/6793 ;
Block 2 Dig No: 30-36R 20
wt A21-6793
CEMONC Building Dra No: 16-18 GF + 5 + Ramp 4695 .
A21-6793
Bioniedical Waste | A21-6793
8 rm Te | |
Joint Director, Health A2116793
Dig No: 28 Fourth Floor 6884
rT | Total Plinth Area 17628.4
3. The Director of Medical and Rural Health Services has also stated that the
Engineer-in-Chief and Chief Engineer (General), Public Works Department has stated
that the contractor has given undertaking to execute the additional quantities in the
agreement rate without claiming any additional amount. The 41° Technical Advisory
; Committee and 122" Tender Award Committee have approved the above additional
quantities and additional items of works. The breakup details of financial commitments
due to inclusion of additional items and additional quantities of works are as follows:-
As per
Sl. aa Technically . .
No. Description Sanctioned As per agreement | As per execution Difference
Estimate
|_| | Tender less (A) _| Rs.57,49,96,303/- | Rs.57,21,20,409/-| = -) Rs.28,75,894/-
|__| Work Done as per Agreement
1 | Work done (as
p 1 [More done Rs.67.21,20,4091- | Rs.48,75,19,018 | () Rs.8,46,01,391/
PDF page 33
2 | Excess due to
Additional Rs.6,50,99,800/- | (+) Rs,6,50,99,800/-
quantities
[side "| | [mane] oman
|_| Total [Rs 57,21,20,4097- | Rs.56,06,99, 780. | “C) Rs.b4,20 6847 (8) |
Savings in LS
ee
4. The Director of Medical and Rural Health Services has, therefore,
recommended the proposal of the Engineer-in-Chief and Chief Engineer (General),
Public Works Department and requested the approval of the Government for additional
quantities and additional works for the work of "Construction of additional buildings
(OP & IP Block, CEmONC Block, TAEI, Mortuary, Bio Medical Waste Room, Block-1,
Block-2 and Radiology Block) for Government Headquarters Hospital, Palani, Dindigul
District". :
5, The Government, after careful examination, have decided to ratify the action of
the Mission Director, National Health Mission-Tamil Nadu in having permitted the
Director of Medical and Rural Health Services in the letter second read above to modify
the design of buildings with additional quantities and additional items of works for
construction of additional buildings (OP & IP Block, CEmMONC Block, TAEI, Mortuary,
Bio Medical Waste Room, Block-1, Block-2 and Radiology Block) to upgrade the
Government Hospital, Palani, Dindigul as District Headquarters Hospital, Dindigul
District, without any escalation in the cost approved in the Government Order first read
above and order accordingly.
; (BY ORDER OF THE GOVERNOR)
DAREZ AHAMED
SECRETARY TO GOVERNMENT
To
The Mission Director, National Health Mission-Tamil Nadu, Chennai – 600 006.
The Director of Medical and Rural Health Services, Chennai-600 006.
The Engineer-in-Chief and Chief Engineer (General), Public Works Department,
Chepauk, Chennai-600 005. .
The Principal Accountant General (A&E / Audit), Chennai-600 018.
The Pay and Accounts Officer (South), Chennai-600 035.
The Resident Audit Officer, Office of the Principal Accountant General, Secretariat,
Chennai-600 009.
The District Treasury Officer concerned. :
The District Collector, Dindigul.
Copy to: ;
The Special Personal Assistant to Hon'ble Minister (Health, Medical Education & Family
Welfare), Chennai-600 009.
PDF page 4; 4A
The Private Secretary to Secretary to Government, Health and Family Welfare,
Secretariat, Chennai-600 009.
The Joint Director of Medical and Rural Health Services, Dindigul. .
The Public Works (Y) Department, Chennai-600 009.
The Finance (Health-I!) Department, Chennai-600 009.
The Health and Family Welfare (Data Cell) Department, Chennai — 600 009.
Stock file / Spare copy. ;
{f FORWARDED / BY ORDER //
SECTION OFFICER